BUILDING CONSTRUCTION METHOD AND TEMPORARY STRUCTURE USED FOR BUILDING CONSTRUCTION METHOD
To provide a building construction method which achieves improvement in workability, and to provide a temporary structure used for the building construction method.SOLUTION: A building construction method uses a panel mounting tool 1 which is used when mounting a building panel 30 on a building body B. The construction method includes the steps of: mounting the panel mounting tool 1 on a beam B1 of the building body B; mounting a temporary handrail 20 used during construction of a building with respect to a mounting hole 2 provided at the panel mounting tool 1; mounting the building panel 30 with respect to a panel mounting hole 3 provided at the panel mounting tool 1; and removing the temporary handrail 20 from the mounting hole 2. In the step of mounting the temporary handrail 20, the temporary handrail 20 is mounted with respect to the mounting hole 2 provided further inside of the building body B than the panel mounting hole 3 in the panel mounting tool 1.SELECTED DRAWING: Figure 8C
【課題】施工性向上を図った建物施工方法及び建物施工方法に用いる仮設構造体を提供する。【解決手段】建物本体Bに建築用パネル30を取り付ける際に用いられるパネル取り付け具1を利用した建物施工方法である。建物施工方法では、建物本体Bの梁B1にパネル取り付け具1を取り付ける工程と、パネル取り付け具1に設けられた取り付け穴2に対し、建物の施工中に用いられる仮設手摺り20を取り付ける工程と、パネル取り付け具1に設けられたパネル取り付け穴3に対し、建築用パネル30を取り付ける工程と、取り付け穴2から仮設手摺り20を取り外す工程と、を備えている。仮設手摺り20を取り付ける工程では、パネル取り付け具1においてパネル取り付け穴3よりも建物本体Bの内側に設けられた取り付け穴2に対し、仮設手摺り20を取り付けることとする。【選択図】図8C
BUILDING CONSTRUCTION METHOD AND TEMPORARY STRUCTURE USED FOR BUILDING CONSTRUCTION METHOD
To provide a building construction method which achieves improvement in workability, and to provide a temporary structure used for the building construction method.SOLUTION: A building construction method uses a panel mounting tool 1 which is used when mounting a building panel 30 on a building body B. The construction method includes the steps of: mounting the panel mounting tool 1 on a beam B1 of the building body B; mounting a temporary handrail 20 used during construction of a building with respect to a mounting hole 2 provided at the panel mounting tool 1; mounting the building panel 30 with respect to a panel mounting hole 3 provided at the panel mounting tool 1; and removing the temporary handrail 20 from the mounting hole 2. In the step of mounting the temporary handrail 20, the temporary handrail 20 is mounted with respect to the mounting hole 2 provided further inside of the building body B than the panel mounting hole 3 in the panel mounting tool 1.SELECTED DRAWING: Figure 8C
【課題】施工性向上を図った建物施工方法及び建物施工方法に用いる仮設構造体を提供する。【解決手段】建物本体Bに建築用パネル30を取り付ける際に用いられるパネル取り付け具1を利用した建物施工方法である。建物施工方法では、建物本体Bの梁B1にパネル取り付け具1を取り付ける工程と、パネル取り付け具1に設けられた取り付け穴2に対し、建物の施工中に用いられる仮設手摺り20を取り付ける工程と、パネル取り付け具1に設けられたパネル取り付け穴3に対し、建築用パネル30を取り付ける工程と、取り付け穴2から仮設手摺り20を取り外す工程と、を備えている。仮設手摺り20を取り付ける工程では、パネル取り付け具1においてパネル取り付け穴3よりも建物本体Bの内側に設けられた取り付け穴2に対し、仮設手摺り20を取り付けることとする。【選択図】図8C
BUILDING CONSTRUCTION METHOD AND TEMPORARY STRUCTURE USED FOR BUILDING CONSTRUCTION METHOD
建物施工方法及び建物施工方法に用いる仮設構造体
HAYASHI TEPPEI (author) / MINAMINO TAKAHIRO (author) / OYAMA MAKOTO (author) / MATSUBARA SATOSHI (author)
2021-08-30
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
BUILDING CONSTRUCTION METHOD, AND TEMPORARY STRUCTURE USED IN BUILDING CONSTRUCTION METHOD
European Patent Office | 2021
|TEMPORARY STRUCTURE, TEMPORARY STRUCTURE ASSEMBLY STRUCTURE AND BUILDING CONSTRUCTION METHOD
European Patent Office | 2022
|Temporary drainage structure for building engineering construction
European Patent Office | 2024
|Temporary drainage structure for building engineering construction
European Patent Office | 2024
|