A platform for research: civil engineering, architecture and urbanism
PAVEMENT BLOCK AND MANUFACTURING METHOD FOR THE SAME
To avoid the problems that cause unnecessary steps on a laying surface for a long period of time, to dramatically improve safety and reliability, and to further improve the ease of manufacturing and cost reduction from structural and manufacturing viewpoints.SOLUTION: A rubber block part 3 formed to a prescribed thickness Lp by connecting a large number of rubber chips P... with a binder B is laminated on a one block surface 2u of a foundation block section 2 formed to a prescribed thickness Lc with a porous concrete C having porosity, thus allowing water permeability as a whole, when constructing a pavement block that is laid on a road surface R to pave the road surface R. At that time, at least two side foundation edge parts 2up, 2uq, being at least opposite positions of the one block surface 2u in the foundation block section 2, are provided with locking shape parts 4p, 4q to which rubber edge parts 3p, 3q of the rubber block part 3 facing the foundation edge parts 2up, 2uq are locked.SELECTED DRAWING: Figure 1
【課題】 敷設面に無用な段差が生じる不具合を長期にわたり回避し、安全性及び信頼性を飛躍的に高めるとともに、構造面及び製造面から製造に係わる容易性及び低コスト性をより高める。【解決手段】 多孔性を有するポーラスコンクリートCにより所定の厚さLcに形成した基礎ブロック部2における一方のブロック面2uに、多数のゴムチップP…をバインダBにより結合することにより所定の厚さLpに形成したゴムブロック部3を積層し、全体に透水性を設けることにより、路面Rの上に敷設して当該路面Rを舗装する舗装ブロックを構成するに際して、基礎ブロック部2における一方のブロック面2uの少なくとも対向位置にある二辺の基礎エッジ部位2up,2uqに、この基礎エッジ部位2up,2uqに対向するゴムブロック部3のゴムエッジ部位3p,3qが係止する係止形状部4p,4qを設ける。【選択図】 図1
PAVEMENT BLOCK AND MANUFACTURING METHOD FOR THE SAME
To avoid the problems that cause unnecessary steps on a laying surface for a long period of time, to dramatically improve safety and reliability, and to further improve the ease of manufacturing and cost reduction from structural and manufacturing viewpoints.SOLUTION: A rubber block part 3 formed to a prescribed thickness Lp by connecting a large number of rubber chips P... with a binder B is laminated on a one block surface 2u of a foundation block section 2 formed to a prescribed thickness Lc with a porous concrete C having porosity, thus allowing water permeability as a whole, when constructing a pavement block that is laid on a road surface R to pave the road surface R. At that time, at least two side foundation edge parts 2up, 2uq, being at least opposite positions of the one block surface 2u in the foundation block section 2, are provided with locking shape parts 4p, 4q to which rubber edge parts 3p, 3q of the rubber block part 3 facing the foundation edge parts 2up, 2uq are locked.SELECTED DRAWING: Figure 1
【課題】 敷設面に無用な段差が生じる不具合を長期にわたり回避し、安全性及び信頼性を飛躍的に高めるとともに、構造面及び製造面から製造に係わる容易性及び低コスト性をより高める。【解決手段】 多孔性を有するポーラスコンクリートCにより所定の厚さLcに形成した基礎ブロック部2における一方のブロック面2uに、多数のゴムチップP…をバインダBにより結合することにより所定の厚さLpに形成したゴムブロック部3を積層し、全体に透水性を設けることにより、路面Rの上に敷設して当該路面Rを舗装する舗装ブロックを構成するに際して、基礎ブロック部2における一方のブロック面2uの少なくとも対向位置にある二辺の基礎エッジ部位2up,2uqに、この基礎エッジ部位2up,2uqに対向するゴムブロック部3のゴムエッジ部位3p,3qが係止する係止形状部4p,4qを設ける。【選択図】 図1
PAVEMENT BLOCK AND MANUFACTURING METHOD FOR THE SAME
舗装ブロック及びその製造方法
KONDO TSUNEO (author)
2021-05-06
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
European Patent Office | 2015
|PAVEMENT STRUCTURE, PAVEMENT METHOD, ROAD WATER PERMEABLE BLOCK AND MANUFACTURING OF THE SAME
European Patent Office | 2016
|BLOCK PAVEMENT METHOD, BLOCK PAVEMENT STRUCTURE AND PAVEMENT BLOCK
European Patent Office | 2023
|LAYING PAVEMENT BLOCK, MOLD FORM AND MANUFACTURING METHOD OF PAVEMENT BLOCK
European Patent Office | 2015
|BLOCK PAVEMENT METHOD, BLOCK PAVEMENT STRUCTURE, AND BLOCK PAVEMENT REINFORCEMENT PLATE
European Patent Office | 2020
|