A platform for research: civil engineering, architecture and urbanism
BASE ISOLATION UPPER FOOTING BEAM CONSTRUCTION METHOD
To provide a base isolation upper footing beam construction method capable of simultaneously performing base isolation upper foundation footing and base isolation upper footing beam concrete placing and greatly simplifying construction.SOLUTION: The base isolation upper footing beam construction method for integrally constructing a base isolation upper foundation footing 1 and an SRC base isolation upper footing beam 2 through placing of concrete 4 includes: connecting a support attaching bracket 8 to a lower surface of an iron frame 3 constituting the base isolation upper footing beam 2; placing the concrete 4 on RC parts of the base isolation upper foundation footing 1 and the base isolation upper footing beam 2 in a state where a support 9 is detachably attached to a lower end of the bracket 8 to support the iron frame 3; and removing the support 9 after hardening of the concrete 4 on the RC parts to complete the construction.SELECTED DRAWING: Figure 1
【課題】免震上基礎フーチングと免震上基礎梁のコンクリート打設を一挙に行うことができ、大幅な施工の簡素化を図ることが可能な免震上基礎梁の構築方法の提供。【解決手段】免震上基礎フーチング1とSRC造の免震上基礎梁2をコンクリート4の打設により一体化して構築する免震上基礎梁の構築方法であって、免震上基礎梁2を構成する鉄骨3の下面に支保工取付け用のブラケット8を連設し、ブラケット8の下端部に支保工9を取外し自在に取付けて鉄骨3を支持した状態で、免震上基礎フーチング1と免震上基礎梁2のRC部分にコンクリート4を打設し、RC部分のコンクリート4の硬化後に支保工9を取外して構築する。【選択図】図1
BASE ISOLATION UPPER FOOTING BEAM CONSTRUCTION METHOD
To provide a base isolation upper footing beam construction method capable of simultaneously performing base isolation upper foundation footing and base isolation upper footing beam concrete placing and greatly simplifying construction.SOLUTION: The base isolation upper footing beam construction method for integrally constructing a base isolation upper foundation footing 1 and an SRC base isolation upper footing beam 2 through placing of concrete 4 includes: connecting a support attaching bracket 8 to a lower surface of an iron frame 3 constituting the base isolation upper footing beam 2; placing the concrete 4 on RC parts of the base isolation upper foundation footing 1 and the base isolation upper footing beam 2 in a state where a support 9 is detachably attached to a lower end of the bracket 8 to support the iron frame 3; and removing the support 9 after hardening of the concrete 4 on the RC parts to complete the construction.SELECTED DRAWING: Figure 1
【課題】免震上基礎フーチングと免震上基礎梁のコンクリート打設を一挙に行うことができ、大幅な施工の簡素化を図ることが可能な免震上基礎梁の構築方法の提供。【解決手段】免震上基礎フーチング1とSRC造の免震上基礎梁2をコンクリート4の打設により一体化して構築する免震上基礎梁の構築方法であって、免震上基礎梁2を構成する鉄骨3の下面に支保工取付け用のブラケット8を連設し、ブラケット8の下端部に支保工9を取外し自在に取付けて鉄骨3を支持した状態で、免震上基礎フーチング1と免震上基礎梁2のRC部分にコンクリート4を打設し、RC部分のコンクリート4の硬化後に支保工9を取外して構築する。【選択図】図1
BASE ISOLATION UPPER FOOTING BEAM CONSTRUCTION METHOD
免震上基礎梁の構築方法
AKAHORI TAKUMI (author) / KAWARABAYASHI JUNKO (author) / TSUJI KEIJI (author) / MAKI TATSUYA (author)
2021-06-03
Patent
Electronic Resource
Japanese
REINFORCEMENT, BASE-ISOLATED UPPER FOUNDATION STRUCTURE AND FOOTING STRUCTURE
European Patent Office | 2021
|Cost Economy in Beam-Slab-Column-Footing Construction
British Library Conference Proceedings | 1994
|European Patent Office | 2019
|