A platform for research: civil engineering, architecture and urbanism
REINFORCEMENT METHOD AND REINFORCEMENT STRUCTURE FOR EXISTING STEEL SHEET PILE
To provide a reinforcement method and a reinforcement structure for an existing steel sheet pile which can reform an existing steel sheet pile without removing the existing steel sheet pile, and is excellent in not only workability and economical efficiency but also certainty and quality (reliability), even in a state where deterioration progresses to the extent that the existing steel sheet pile cannot be repaired.SOLUTION: Wall structures 11 composed of strut materials 1, horizontal beam members 2 and wall materials 3 are constructed each insides of facing existing steel sheet piles 10, the facing wall structures are supported by trim beams 4, and spaces between the existing steel sheet piles and the wall structures are filled with a filler, to be integrated with each other. Furthermore, a decorative panel material 9 is provided in the insides of the wall structures, each of the spaces among the existing steel sheet piles, the wall structures and the decorative panel material is filled with a filler, to be integrated with each other.SELECTED DRAWING: Figure 5
【課題】既設鋼矢板が補修できないくらいに老朽化が進んだ段階であっても、既設鋼矢板を撤去することなく補強できる、施工性、経済性はもとより確実性、品質性(信頼性)に優れた、既設鋼矢板の補強工法および補強構造を提供する。【解決手段】相対峙する既設鋼矢板10の内側にそれぞれ、支柱材1と横梁材2と壁材3とからなる壁構造体11を構築し、相対峙する壁構造体を切梁4で支持すると共に、既設鋼矢板と壁構造体との間に充填材を充填して両者を一体化する。さらに、壁構造体の内側に化粧パネル材9を設け、既設鋼矢板と壁構造体と化粧パネル材との各間に充填材を充填して3者を一体化することもできる。【選択図】図5
REINFORCEMENT METHOD AND REINFORCEMENT STRUCTURE FOR EXISTING STEEL SHEET PILE
To provide a reinforcement method and a reinforcement structure for an existing steel sheet pile which can reform an existing steel sheet pile without removing the existing steel sheet pile, and is excellent in not only workability and economical efficiency but also certainty and quality (reliability), even in a state where deterioration progresses to the extent that the existing steel sheet pile cannot be repaired.SOLUTION: Wall structures 11 composed of strut materials 1, horizontal beam members 2 and wall materials 3 are constructed each insides of facing existing steel sheet piles 10, the facing wall structures are supported by trim beams 4, and spaces between the existing steel sheet piles and the wall structures are filled with a filler, to be integrated with each other. Furthermore, a decorative panel material 9 is provided in the insides of the wall structures, each of the spaces among the existing steel sheet piles, the wall structures and the decorative panel material is filled with a filler, to be integrated with each other.SELECTED DRAWING: Figure 5
【課題】既設鋼矢板が補修できないくらいに老朽化が進んだ段階であっても、既設鋼矢板を撤去することなく補強できる、施工性、経済性はもとより確実性、品質性(信頼性)に優れた、既設鋼矢板の補強工法および補強構造を提供する。【解決手段】相対峙する既設鋼矢板10の内側にそれぞれ、支柱材1と横梁材2と壁材3とからなる壁構造体11を構築し、相対峙する壁構造体を切梁4で支持すると共に、既設鋼矢板と壁構造体との間に充填材を充填して両者を一体化する。さらに、壁構造体の内側に化粧パネル材9を設け、既設鋼矢板と壁構造体と化粧パネル材との各間に充填材を充填して3者を一体化することもできる。【選択図】図5
REINFORCEMENT METHOD AND REINFORCEMENT STRUCTURE FOR EXISTING STEEL SHEET PILE
既設鋼矢板の補強工法および補強構造
HARADA TAKEO (author) / FUJIMOTO YUJI (author)
2021-06-24
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
REINFORCEMENT STRUCTURE AND REINFORCEMENT METHOD OF EXISTING STEEL SHEET PILE WALL
European Patent Office | 2017
|REINFORCEMENT STRUCTURE AND REINFORCEMENT METHOD OF EXISTING STEEL SHEET PILE WALL
European Patent Office | 2017
|REINFORCEMENT STRUCTURE AND REINFORCEMENT METHOD FOR EXISTING STEEL PILE WALL
European Patent Office | 2017
|REINFORCEMENT STRUCTURE AND REINFORCEMENT METHOD FOR EXISTING STEEL PILE WALL
European Patent Office | 2017
|European Patent Office | 2015
|