CONSTRUCTION METHOD OF BUILDING HAVING RC STRUCTURAL SKELETON
To provide a construction method of a building allowing a construction period to be shortened as well as allowing aseismatic performance of the building to be secured and a dead space to be prevented from being created.SOLUTION: A construction method of a building comprises a step of preparing a plurality of outer peripheral column members 16A, a plurality of inner column members 16B, a plurality of first beam members 17 (17A, 17B), and a plurality of second beam members 19 (19A, 19B) made of PCa concrete. The method includes a step of preparing a plurality of interior units 12 defining a room 6. The interior units 12 is placed on a constructed part of a skeleton 2 in a way one end part 12a of the interior unit 12 is inserted in an outer peripheral frame part 18 constructed by connecting a pair of the outer peripheral column members 16A adjacent to each other with the use of the first beam member 17. The inner space of the outer peripheral frame part 18 is utilized as the room 6.SELECTED DRAWING: Figure 5
【課題】工期を短縮可能であり、且つ、建物の耐震性能を確保すると共にデッドスペースの発生を抑制できる建物の構築方法を提供する。【解決手段】それぞれPCaコンクリートからなる複数の外周柱部材16A、複数の内部柱部材16B、複数の第1梁部材17(17A、17B)及び複数の第2梁部材19(19A、19B)を用意する。また、室6を画定する複数の内装ユニット12を用意する。互いに隣接する1対の外周柱部材16Aを第1梁部材17によって連結して構築した外周架構部18の内部に内装ユニット12の一端部12aが進入するように、躯体2の構築済み部分の上に内装ユニット12を配置する。外周架構部18の内部は室6として利用される。【選択図】図5
CONSTRUCTION METHOD OF BUILDING HAVING RC STRUCTURAL SKELETON
To provide a construction method of a building allowing a construction period to be shortened as well as allowing aseismatic performance of the building to be secured and a dead space to be prevented from being created.SOLUTION: A construction method of a building comprises a step of preparing a plurality of outer peripheral column members 16A, a plurality of inner column members 16B, a plurality of first beam members 17 (17A, 17B), and a plurality of second beam members 19 (19A, 19B) made of PCa concrete. The method includes a step of preparing a plurality of interior units 12 defining a room 6. The interior units 12 is placed on a constructed part of a skeleton 2 in a way one end part 12a of the interior unit 12 is inserted in an outer peripheral frame part 18 constructed by connecting a pair of the outer peripheral column members 16A adjacent to each other with the use of the first beam member 17. The inner space of the outer peripheral frame part 18 is utilized as the room 6.SELECTED DRAWING: Figure 5
【課題】工期を短縮可能であり、且つ、建物の耐震性能を確保すると共にデッドスペースの発生を抑制できる建物の構築方法を提供する。【解決手段】それぞれPCaコンクリートからなる複数の外周柱部材16A、複数の内部柱部材16B、複数の第1梁部材17(17A、17B)及び複数の第2梁部材19(19A、19B)を用意する。また、室6を画定する複数の内装ユニット12を用意する。互いに隣接する1対の外周柱部材16Aを第1梁部材17によって連結して構築した外周架構部18の内部に内装ユニット12の一端部12aが進入するように、躯体2の構築済み部分の上に内装ユニット12を配置する。外周架構部18の内部は室6として利用される。【選択図】図5
CONSTRUCTION METHOD OF BUILDING HAVING RC STRUCTURAL SKELETON
RC造の躯体を有する建物の構築方法
HASUO KOICHI (author) / TOKURA KENTARO (author) / IWAMOTO TAKESHI (author) / SUGAYA KAZUTO (author) / KAWAI KEITA (author)
2021-09-13
Patent
Electronic Resource
Japanese