CONSTRUCTION METHOD OF OVERHANGING SLAB
To reduce cost and improve workability by properly securing a work traffic line.SOLUTION: A construction method of an overhanging slab fixes a slab member 1 to a structure 2 in a state of outwardly overhanging from the structure 2. A base end side portion of the slab member 1 comprises an upwardly extending rising portion 12. The construction method performs: a temporary fixing step of connecting the rising portion 12 of the slab member 1 and an extension member 31 extending from a support member 21 toward the inside of the structure 2 by a connection material 41 in a state where the base end side portion of the slab member 1 is mounted on the support member 21 at the structure 2 side, to temporarily fix the slab member 1 to the structure 2; and a final fixing step of joining the temporarily fixed slab member 1 and structure 2 side by pouring of concrete, to finally fix the slab member 1.SELECTED DRAWING: Figure 6
【課題】作業動線を適切に確保することができ、コストの低減及び施工性の向上を図ること。【解決手段】スラブ部材1を構造物2から外方側に跳ね出した跳ね出し状態で構造物2に固定する跳ね出しスラブの施工方法において、スラブ部材1の基端側部位には、上方側に延びる立ち上がり部12が備えられ、スラブ部材1の基端側部位を構造物2側の支持部材21に載置させた状態で、スラブ部材1の立ち上がり部12と支持部材21から構造物2の内方側に延びる延設部材31とを連結材41にて連結してスラブ部材1を構造物2に仮固定する仮固定工程と、コンクリートの打設により仮固定されたスラブ材1と構造物2側とを接合してスラブ部材1を本固定する本固定工程とを行う。【選択図】図6
CONSTRUCTION METHOD OF OVERHANGING SLAB
To reduce cost and improve workability by properly securing a work traffic line.SOLUTION: A construction method of an overhanging slab fixes a slab member 1 to a structure 2 in a state of outwardly overhanging from the structure 2. A base end side portion of the slab member 1 comprises an upwardly extending rising portion 12. The construction method performs: a temporary fixing step of connecting the rising portion 12 of the slab member 1 and an extension member 31 extending from a support member 21 toward the inside of the structure 2 by a connection material 41 in a state where the base end side portion of the slab member 1 is mounted on the support member 21 at the structure 2 side, to temporarily fix the slab member 1 to the structure 2; and a final fixing step of joining the temporarily fixed slab member 1 and structure 2 side by pouring of concrete, to finally fix the slab member 1.SELECTED DRAWING: Figure 6
【課題】作業動線を適切に確保することができ、コストの低減及び施工性の向上を図ること。【解決手段】スラブ部材1を構造物2から外方側に跳ね出した跳ね出し状態で構造物2に固定する跳ね出しスラブの施工方法において、スラブ部材1の基端側部位には、上方側に延びる立ち上がり部12が備えられ、スラブ部材1の基端側部位を構造物2側の支持部材21に載置させた状態で、スラブ部材1の立ち上がり部12と支持部材21から構造物2の内方側に延びる延設部材31とを連結材41にて連結してスラブ部材1を構造物2に仮固定する仮固定工程と、コンクリートの打設により仮固定されたスラブ材1と構造物2側とを接合してスラブ部材1を本固定する本固定工程とを行う。【選択図】図6
CONSTRUCTION METHOD OF OVERHANGING SLAB
跳ね出しスラブの施工方法
USUDA YUSAKU (author) / TANAKA KENJI (author) / YAMAMOTO SHUNJI (author) / KOJIMA KAZUTAKA (author) / DOI MASATO (author) / WATADA RYO (author) / YOSHIMURA JUNYA (author) / KIHARA TOMOMI (author) / MORI HIROCHIKA (author)
2021-11-01
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
PRETENSION FLOOR SLAB CONSTRUCTION METHOD BASED ON OVERHANGING CONSTRUCTION
European Patent Office | 2017
|OVERHANGING PANEL UNIT CONSTRUCTION METHOD AND OVERHANGING PANEL STRUCTURE
European Patent Office | 2021
|Overhanging construction method for ultrahigh building and overhanging frame
European Patent Office | 2023
|Fabricated overhanging supporting structure for concrete slab
European Patent Office | 2024
|Hanging construction method for overhanging and downward-hanging type cast-in-place slab
European Patent Office | 2021
|