INSTALLATION MANAGEMENT SYSTEM AND INSTALLATION MANAGING METHOD
To provide an installation management system and an installation management method allowing standardization of recognition of a next construction step among workers, and allowing smooth switching of the construction steps.SOLUTION: An installation management device 40 has: an advanced input receiving part 51 receiving information of a cast-in-place concrete pile as advanced information; a step structuring part 52 structuring construction steps by receiving simulation of pulling-out work of a tremie pipe 1 and a casing 2 and by combining a sensor setting step, a concrete installation step, a tremie pipe pulling-out step, a sensor recovery step, and a casing pulling-out step; and a construction management part 53 displaying on a display part 42 a step checking screen having check columns for every construction step structure by the step structuring part 52.SELECTED DRAWING: Figure 3
【課題】作業者間で次の施工工程の認識を統一することができ、施工工程の切り換えをスムーズに行うことができる打設管理システム及び打設管理方法を提供する。【解決手段】打設管理装置40は、場所打ちコンクリート杭の情報を事前情報として受け付ける事前入力受付部51と、トレミー管1及びケーシング2の引抜作業のシミュレーションを受け付けて、センサー設置工程、コンクリート打設工程、トレミー管引抜工程、センサー回収工程、及びケーシング引抜工程を組み合わせた施工工程を構築する工程構築部52と、工程構築部52によって構築された施工工程の工程毎にチェック欄が設けられた工程チェック画面を表示部42に表示させる施工管理部53とを備えている。【選択図】図3
INSTALLATION MANAGEMENT SYSTEM AND INSTALLATION MANAGING METHOD
To provide an installation management system and an installation management method allowing standardization of recognition of a next construction step among workers, and allowing smooth switching of the construction steps.SOLUTION: An installation management device 40 has: an advanced input receiving part 51 receiving information of a cast-in-place concrete pile as advanced information; a step structuring part 52 structuring construction steps by receiving simulation of pulling-out work of a tremie pipe 1 and a casing 2 and by combining a sensor setting step, a concrete installation step, a tremie pipe pulling-out step, a sensor recovery step, and a casing pulling-out step; and a construction management part 53 displaying on a display part 42 a step checking screen having check columns for every construction step structure by the step structuring part 52.SELECTED DRAWING: Figure 3
【課題】作業者間で次の施工工程の認識を統一することができ、施工工程の切り換えをスムーズに行うことができる打設管理システム及び打設管理方法を提供する。【解決手段】打設管理装置40は、場所打ちコンクリート杭の情報を事前情報として受け付ける事前入力受付部51と、トレミー管1及びケーシング2の引抜作業のシミュレーションを受け付けて、センサー設置工程、コンクリート打設工程、トレミー管引抜工程、センサー回収工程、及びケーシング引抜工程を組み合わせた施工工程を構築する工程構築部52と、工程構築部52によって構築された施工工程の工程毎にチェック欄が設けられた工程チェック画面を表示部42に表示させる施工管理部53とを備えている。【選択図】図3
INSTALLATION MANAGEMENT SYSTEM AND INSTALLATION MANAGING METHOD
打設管理システム及び打設管理方法
KASUYA YUKI (author)
2021-11-25
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2022
|INSTALLATION MANAGEMENT DEVICE, INSTALLATION MANAGEMENT METHOD, AND INSTALLATION MANAGEMENT PROGRAM
European Patent Office | 2018
|INSTALLATION HEIGHT MANAGEMENT SYSTEM AND INSTALLATION HEIGHT MANAGEMENT METHOD
European Patent Office | 2020
|SYSTEM, METHOD FOR MANAGING WATER-SUPPLY INSTALLATION AND MANAGEMENT DEVICE
European Patent Office | 2019
|