CONSTRUCTION METHOD OF LEVELING MATERIAL AND MIXING TANK OF LEVELING MATERIAL
To provide a construction method of leveling materials with which leveling materials do not have to be carried by human labor and can be easily poured into target locations and workability can be improved.SOLUTION: In a construction method of leveling materials 4 in which a flat surface 4a is formed without unevenness on the upper side of a base 3 by pouring the leveling materials 4 into the upper surface 3a of the base 3 and curing them, when the leveling materials 4 are pouring into the upper surface 3a of the base 3, by lifting in the air a leveling material mixing tank 10 for mixing the leveling materials 4 and pulling a leveling material take-out pipe line 6 connected to the bottom of the leveling material mixing tank 10 to target locations, the leveling materials 4 inside the leveling material mixing tank 10 are allowed to naturally flow down to the target positions.SELECTED DRAWING: Figure 1
【課題】レベリング材を人為的に運搬することなく目的場所に容易に流し込むことができ、作業性を向上させることのできるレベリング材の施工方法を提供する。【解決手段】下地3の上面3aにレベリング材4を流し込んで硬化させることで、下地3の上側に不陸のない平坦面4aを形成するレベリング材4の施工方法において、下地3の上面3aにレベリング材4を流し込む際に、レベリング材4を攪拌するためのレベリング材攪拌槽10を宙吊りにし、レベリング材攪拌槽10の底部に接続したレベリング材取出管路6を目的場所まで引くことによって、レベリング材攪拌槽10の内部のレベリング材4が目的箇所まで自然流下するようにした。【選択図】 図1
CONSTRUCTION METHOD OF LEVELING MATERIAL AND MIXING TANK OF LEVELING MATERIAL
To provide a construction method of leveling materials with which leveling materials do not have to be carried by human labor and can be easily poured into target locations and workability can be improved.SOLUTION: In a construction method of leveling materials 4 in which a flat surface 4a is formed without unevenness on the upper side of a base 3 by pouring the leveling materials 4 into the upper surface 3a of the base 3 and curing them, when the leveling materials 4 are pouring into the upper surface 3a of the base 3, by lifting in the air a leveling material mixing tank 10 for mixing the leveling materials 4 and pulling a leveling material take-out pipe line 6 connected to the bottom of the leveling material mixing tank 10 to target locations, the leveling materials 4 inside the leveling material mixing tank 10 are allowed to naturally flow down to the target positions.SELECTED DRAWING: Figure 1
【課題】レベリング材を人為的に運搬することなく目的場所に容易に流し込むことができ、作業性を向上させることのできるレベリング材の施工方法を提供する。【解決手段】下地3の上面3aにレベリング材4を流し込んで硬化させることで、下地3の上側に不陸のない平坦面4aを形成するレベリング材4の施工方法において、下地3の上面3aにレベリング材4を流し込む際に、レベリング材4を攪拌するためのレベリング材攪拌槽10を宙吊りにし、レベリング材攪拌槽10の底部に接続したレベリング材取出管路6を目的場所まで引くことによって、レベリング材攪拌槽10の内部のレベリング材4が目的箇所まで自然流下するようにした。【選択図】 図1
CONSTRUCTION METHOD OF LEVELING MATERIAL AND MIXING TANK OF LEVELING MATERIAL
レベリング材の施工方法及びレベリング材攪拌槽
TANAKA KEIZO (author)
2021-12-27
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
FLOW PATH TYPE LEVELING MATERIAL AGITATOR AND LEVELING MATERIAL CONSTRUCTION METHOD
European Patent Office | 2022
|Turnover type leveling device, leveling ship and leveling construction method of leveling ship
European Patent Office | 2023
|Leveling device, leveling robot and construction method of leveling device
European Patent Office | 2022
|LEVELING APPARATUS, LEVELING ROBOT AND METHOD FOR CONSTRUCTION USING LEVELING APPARATUS
European Patent Office | 2022
|