A platform for research: civil engineering, architecture and urbanism
INVERTED CONSTRUCTION METHOD
To provide an inverted construction method for suppressing floating-up of an in-service underground.SOLUTION: In an inverted construction method, a structure 20 is constructed inside an earth-retaining wall 32 adjacent to an in-service underground structure 16 in plan view. A structural body 40 for a base having a floor part 40A arranged on the in-service underground structure 16 side in relation to the earth-retaining wall 32 is connected to a ground structural body 20B of the structure 20 supported by permanent steel columns 22 inside the earth-retaining wall 32 by a temporary diagonal beam 70, and soil 12 under an underground structural body 20A is excavated, while suppressing floating-up of the structural body 40 for the base by using a reaction force to the ground structural body 20B.SELECTED DRAWING: Figure 4
【課題】本発明は、供用中地下構造物の浮き上がりを抑制することを目的とする。【解決手段】逆打ち工法は、平面視にて供用中地下構造物16と隣り合う山留め壁32の内側に構造物20を施工する逆打ち工法であって、山留め壁32に対して供用中地下構造物16側に配置された床部40Aを有するベース用構造体40と、山留め壁32の内側で構真柱22に支持された構造物20の地上構造体20Bとを仮設斜梁70によって連結し、地上構造体20Bに反力を取ってベース用構造体40の浮き上がりを抑制しながら、地地下構造体20Aの下の地盤12を掘削する。【選択図】図4
INVERTED CONSTRUCTION METHOD
To provide an inverted construction method for suppressing floating-up of an in-service underground.SOLUTION: In an inverted construction method, a structure 20 is constructed inside an earth-retaining wall 32 adjacent to an in-service underground structure 16 in plan view. A structural body 40 for a base having a floor part 40A arranged on the in-service underground structure 16 side in relation to the earth-retaining wall 32 is connected to a ground structural body 20B of the structure 20 supported by permanent steel columns 22 inside the earth-retaining wall 32 by a temporary diagonal beam 70, and soil 12 under an underground structural body 20A is excavated, while suppressing floating-up of the structural body 40 for the base by using a reaction force to the ground structural body 20B.SELECTED DRAWING: Figure 4
【課題】本発明は、供用中地下構造物の浮き上がりを抑制することを目的とする。【解決手段】逆打ち工法は、平面視にて供用中地下構造物16と隣り合う山留め壁32の内側に構造物20を施工する逆打ち工法であって、山留め壁32に対して供用中地下構造物16側に配置された床部40Aを有するベース用構造体40と、山留め壁32の内側で構真柱22に支持された構造物20の地上構造体20Bとを仮設斜梁70によって連結し、地上構造体20Bに反力を取ってベース用構造体40の浮き上がりを抑制しながら、地地下構造体20Aの下の地盤12を掘削する。【選択図】図4
INVERTED CONSTRUCTION METHOD
逆打ち工法
AOKI MASAMICHI (author) / KONO TAKAO (author) / KUMAGAI HIROTO (author) / KATADA KIMIAKI (author) / YAMAKAWA SHOJI (author) / OKABASHI MINORU (author) / SATO SHUNSUKE (author)
2022-02-14
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Inverted filter construction device and inverted filter construction method
European Patent Office | 2024
|INVERTED CONSTRUCTION PLATFORM SYSTEM AND CONSTRUCTION METHOD
European Patent Office | 2022
|Large standing tower inverted installation device and inverted construction method
European Patent Office | 2020
|