A platform for research: civil engineering, architecture and urbanism
INVERTED CONSTRUCTION PLATFORM SYSTEM AND CONSTRUCTION METHOD
An inverted construction platform system and a construction method using same. The construction platform system comprises an upper platform mechanism (3), a lower platform mechanism (2), a limiting mechanism (1), a power control mechanism (4), and a guide column (7); the upper platform mechanism (3) comprises an upper construction platform and an upper platform horizontal hydraulic telescopic bracket (30) connected to each other; the upper construction platform is connected to the guide column (7) by means of the limiting mechanism (1); the lower platform mechanism (2) comprises a lower construction platform and a lower platform horizontal hydraulic telescopic bracket (24) connected to each other; the lower construction platform is connected to the guide column (7); the limiting mechanism (1) is used for limiting a horizontal offset and a vertical offset of the upper construction platform relative to the guide column (7); and the power control mechanism (4) is used for implementing raising/lowering of the lower platform mechanism (2) and the upper platform mechanism (3). The inverted construction platform system can climb or descend layer by layer in a core tube, thereby shortening the construction period.
L'invention concerne un système de plate-forme de construction inversée et un procédé de construction l'utilisant. Le système de plate-forme de construction comprend un mécanisme de plate-forme supérieure (3), un mécanisme de plate-forme inférieure (2), un mécanisme de butée (1), un mécanisme de commande d'alimentation électrique (4), et une colonne de guidage (7) ; le mécanisme de plate-forme supérieure (3) comprend une plate-forme de construction supérieure et un support télescopique hydraulique horizontal de plate-forme supérieure (30) reliés l'un à l'autre ; la plate-forme de construction supérieure est reliée à la colonne de guidage (7) au moyen du mécanisme de butée (1) ; le mécanisme de plate-forme inférieure (2) comprend une plate-forme de construction inférieure et un support télescopique hydraulique horizontal de plate-forme inférieure (24) reliés l'un à l'autre ; la plate-forme de construction inférieure est reliée à la colonne de guidage (7) ; le mécanisme de butée (1) est utilisé pour limiter un décalage horizontal et un décalage vertical de la plate-forme de construction supérieure par rapport à la colonne de guidage (7) ; et le mécanisme de commande d'alimentation électrique (4) est utilisé pour mettre en œuvre l'élévation/l'abaissement du mécanisme de plate-forme inférieure (2) et du mécanisme de plate-forme supérieure (3). Le système de plate-forme de construction inversée peut monter ou descendre étage par étage dans un tube central, raccourcissant ainsi le temps de construction.
一种倒置式施工平台系统及其施工方法,该施工平台系统包括上平台机构(3)、下平台机构(2)、限位机构(1)、动力控制机构(4)和导向立柱(7);上平台机构(3)包括相连接的上施工平台及上平台水平液压伸缩牛腿(30);上施工平台通过限位机构(1)与导向立柱(7)连接;下平台机构(2)包括相连接的下施工平台及下平台水平液压伸缩牛腿(24);下施工平台与导向立柱(7)连接;限位机构(1)用于限制上施工平台相对于导向立柱(7)的水平偏移量和竖直偏移量;动力控制机构(4)用以实现下平台机构(2)和上平台机构(3)的升降。使用该倒置式施工平台系统可以在核心筒内逐层爬升或下降,缩短施工周期。
INVERTED CONSTRUCTION PLATFORM SYSTEM AND CONSTRUCTION METHOD
An inverted construction platform system and a construction method using same. The construction platform system comprises an upper platform mechanism (3), a lower platform mechanism (2), a limiting mechanism (1), a power control mechanism (4), and a guide column (7); the upper platform mechanism (3) comprises an upper construction platform and an upper platform horizontal hydraulic telescopic bracket (30) connected to each other; the upper construction platform is connected to the guide column (7) by means of the limiting mechanism (1); the lower platform mechanism (2) comprises a lower construction platform and a lower platform horizontal hydraulic telescopic bracket (24) connected to each other; the lower construction platform is connected to the guide column (7); the limiting mechanism (1) is used for limiting a horizontal offset and a vertical offset of the upper construction platform relative to the guide column (7); and the power control mechanism (4) is used for implementing raising/lowering of the lower platform mechanism (2) and the upper platform mechanism (3). The inverted construction platform system can climb or descend layer by layer in a core tube, thereby shortening the construction period.
L'invention concerne un système de plate-forme de construction inversée et un procédé de construction l'utilisant. Le système de plate-forme de construction comprend un mécanisme de plate-forme supérieure (3), un mécanisme de plate-forme inférieure (2), un mécanisme de butée (1), un mécanisme de commande d'alimentation électrique (4), et une colonne de guidage (7) ; le mécanisme de plate-forme supérieure (3) comprend une plate-forme de construction supérieure et un support télescopique hydraulique horizontal de plate-forme supérieure (30) reliés l'un à l'autre ; la plate-forme de construction supérieure est reliée à la colonne de guidage (7) au moyen du mécanisme de butée (1) ; le mécanisme de plate-forme inférieure (2) comprend une plate-forme de construction inférieure et un support télescopique hydraulique horizontal de plate-forme inférieure (24) reliés l'un à l'autre ; la plate-forme de construction inférieure est reliée à la colonne de guidage (7) ; le mécanisme de butée (1) est utilisé pour limiter un décalage horizontal et un décalage vertical de la plate-forme de construction supérieure par rapport à la colonne de guidage (7) ; et le mécanisme de commande d'alimentation électrique (4) est utilisé pour mettre en œuvre l'élévation/l'abaissement du mécanisme de plate-forme inférieure (2) et du mécanisme de plate-forme supérieure (3). Le système de plate-forme de construction inversée peut monter ou descendre étage par étage dans un tube central, raccourcissant ainsi le temps de construction.
一种倒置式施工平台系统及其施工方法,该施工平台系统包括上平台机构(3)、下平台机构(2)、限位机构(1)、动力控制机构(4)和导向立柱(7);上平台机构(3)包括相连接的上施工平台及上平台水平液压伸缩牛腿(30);上施工平台通过限位机构(1)与导向立柱(7)连接;下平台机构(2)包括相连接的下施工平台及下平台水平液压伸缩牛腿(24);下施工平台与导向立柱(7)连接;限位机构(1)用于限制上施工平台相对于导向立柱(7)的水平偏移量和竖直偏移量;动力控制机构(4)用以实现下平台机构(2)和上平台机构(3)的升降。使用该倒置式施工平台系统可以在核心筒内逐层爬升或下降,缩短施工周期。
INVERTED CONSTRUCTION PLATFORM SYSTEM AND CONSTRUCTION METHOD
SYSTÈME DE PLATE-FORME DE CONSTRUCTION INVERSÉE ET PROCÉDÉ DE CONSTRUCTION
一种倒置式施工平台系统及施工方法
LI WENRUI (author) / DU JUNZI (author) / CHEN BO (author) / XUE YU (author) / ZENG YUTING (author) / DENG XIANG (author)
2022-06-30
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Inverted filter construction device and inverted filter construction method
European Patent Office | 2024
|CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE BY INVERTED CONSTRUCTION METHOD
European Patent Office | 2016
|Inverted siphon inlet gate construction node and construction method
European Patent Office | 2023
|