A platform for research: civil engineering, architecture and urbanism
COFFERDAM STRUCTURE, AND CONSTRUCTION METHOD OF CONSTRUCTION WORK IN RIVER USING COFFERDAM STRUCTURE
To provide a cofferdam structure capable of improving workability, economical efficiency, and safety.SOLUTION: A cofferdam structure comprises: a fixed cofferdam structural body 1 constituted so as to extend from a water bottom Wb to a water surface Ws side; and a detachable cofferdam structural body 2 detachably attached to the fixed cofferdam structural body 1 via an attachment/detachment device 3. The detachable cofferdam structural body 2 includes: a water cut-off wall 20; and a reinforcement portion 21 reinforcing the water cut-off wall 20. The reinforcement portion 21 is attached to one wall face 20a of the water cut-off wall 20.SELECTED DRAWING: Figure 1
【課題】施工性、経済性、安全性を向上できる仮締切構造物等を提供する。【解決手段】水底Wbから水面Ws側に延長するように構成された固定仮締切構造体1と、当該固定仮締切構造体1上に着脱装置3を介して着脱可能に取付けられた着脱式仮締切構造体2とを備え、着脱式仮締切構造体2は、止水壁20と、止水壁20を補強する補強部21とを備え、補強部21が止水壁20の一方の壁面20aに取付けられている。【選択図】図1
COFFERDAM STRUCTURE, AND CONSTRUCTION METHOD OF CONSTRUCTION WORK IN RIVER USING COFFERDAM STRUCTURE
To provide a cofferdam structure capable of improving workability, economical efficiency, and safety.SOLUTION: A cofferdam structure comprises: a fixed cofferdam structural body 1 constituted so as to extend from a water bottom Wb to a water surface Ws side; and a detachable cofferdam structural body 2 detachably attached to the fixed cofferdam structural body 1 via an attachment/detachment device 3. The detachable cofferdam structural body 2 includes: a water cut-off wall 20; and a reinforcement portion 21 reinforcing the water cut-off wall 20. The reinforcement portion 21 is attached to one wall face 20a of the water cut-off wall 20.SELECTED DRAWING: Figure 1
【課題】施工性、経済性、安全性を向上できる仮締切構造物等を提供する。【解決手段】水底Wbから水面Ws側に延長するように構成された固定仮締切構造体1と、当該固定仮締切構造体1上に着脱装置3を介して着脱可能に取付けられた着脱式仮締切構造体2とを備え、着脱式仮締切構造体2は、止水壁20と、止水壁20を補強する補強部21とを備え、補強部21が止水壁20の一方の壁面20aに取付けられている。【選択図】図1
COFFERDAM STRUCTURE, AND CONSTRUCTION METHOD OF CONSTRUCTION WORK IN RIVER USING COFFERDAM STRUCTURE
仮締切構造物及び仮締切構造物を用いた河川内工事の施工方法
NAKAJIMA SHUSAKU (author) / NOZAWA JUNICHIRO (author) / ERA KOICHI (author) / TORIYAMA TSUYOSHI (author) / SHIKI TSUNEKAZU (author) / TOYOSHIMA MIKIHIRO (author)
2022-04-13
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Adjustable cofferdam structure and cofferdam construction method
European Patent Office | 2023
|CONSTRUCTION METHOD FOR COFFERDAM STRUCTURE AND COFFERDAM STRUCTURE
European Patent Office | 2022
|Fabricated cofferdam structure and cofferdam construction method
European Patent Office | 2023
|Wall protection structure of cofferdam, cofferdam and construction method
European Patent Office | 2024
|