FLOOR SLAB REPLACEMENT METHOD AND GUARD FENCE FOR FLOOR SLAB REPLACEMENT CONSTRUCTION
To safely share another traffic lane when performing floor slab replacement construction on one traffic lane at a time.SOLUTION: Mobile guard fences 30 are disposed in a travel direction backward area of a floor slab removal machine 10, a travel direction forward area of a floor slab installation machine 20, or an area between the floor slab removal machine 10 and the floor slab installation machine 20, and along a boundary of a shared traffic lane adjacent thereof. The mobile guard fence 30 includes front and rear carriages 31, 32, a guard rail 34 bridged and supported on the carriages 31, 32, and connection members 35, 36 of the floor slab removal machine 10 and the floor slab installation machine 20.SELECTED DRAWING: Figure 2
【課題】 床版架け替え工事を1車線ずつ行う場合に、他の車線の供用を安全に行わせる。【解決手段】 床版撤去機10の進行方向後方エリア、床版架設機20の進行方向前方エリア、又は、床版撤去機10と床版架設機20との間のエリアと、これに隣接する供用中の車線との境界に沿って、移動式防護柵30を配置する。移動式防護柵30は、前後の台車31、32と、これらの台車31、32に架け渡されて支持されるガードレール34と、床版撤去機10及び床版架設機20との連結部材35、36とを含む。【選択図】 図2
FLOOR SLAB REPLACEMENT METHOD AND GUARD FENCE FOR FLOOR SLAB REPLACEMENT CONSTRUCTION
To safely share another traffic lane when performing floor slab replacement construction on one traffic lane at a time.SOLUTION: Mobile guard fences 30 are disposed in a travel direction backward area of a floor slab removal machine 10, a travel direction forward area of a floor slab installation machine 20, or an area between the floor slab removal machine 10 and the floor slab installation machine 20, and along a boundary of a shared traffic lane adjacent thereof. The mobile guard fence 30 includes front and rear carriages 31, 32, a guard rail 34 bridged and supported on the carriages 31, 32, and connection members 35, 36 of the floor slab removal machine 10 and the floor slab installation machine 20.SELECTED DRAWING: Figure 2
【課題】 床版架け替え工事を1車線ずつ行う場合に、他の車線の供用を安全に行わせる。【解決手段】 床版撤去機10の進行方向後方エリア、床版架設機20の進行方向前方エリア、又は、床版撤去機10と床版架設機20との間のエリアと、これに隣接する供用中の車線との境界に沿って、移動式防護柵30を配置する。移動式防護柵30は、前後の台車31、32と、これらの台車31、32に架け渡されて支持されるガードレール34と、床版撤去機10及び床版架設機20との連結部材35、36とを含む。【選択図】 図2
FLOOR SLAB REPLACEMENT METHOD AND GUARD FENCE FOR FLOOR SLAB REPLACEMENT CONSTRUCTION
床版架け替え方法、及び、床版架け替え工事用の防護柵
MIMURO KEIJI (author) / MURASE RYOSUKE (author) / ITO MASARU (author) / YAMANAKA HIROYUKI (author) / YAMADA YASUSHI (author) / KOBAYASHI KATSUYA (author)
2022-05-16
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
FLOOR SLAB REPLACEMENT STRUCTURE AND FLOOR SLAB REPLACEMENT METHOD
European Patent Office | 2018
|FLOOR SLAB REPLACEMENT STRUCTURE AND FLOOR SLAB REPLACEMENT METHOD
European Patent Office | 2023
|FLOOR SLAB REPLACEMENT APPARATUS AND FLOOR SLAB REPLACEMENT METHOD
European Patent Office | 2018
|FLOOR SLAB REPLACEMENT STRUCTURE AND FLOOR SLAB REPLACEMENT METHOD
European Patent Office | 2018
|FLOOR SLAB REPLACEMENT STRUCTURE AND FLOOR SLAB REPLACEMENT METHOD
European Patent Office | 2021
|