REMOVAL METHOD OF EXISTING CONCRETE PILE
To remove an existing concrete pile more easily.SOLUTION: In a removal method of an existing concrete pile 1 embedded in the underground E, in a tubular shape forming process, while leaving an outer peripheral portion 4 of the existing concrete pile 1, an inside 5 of the existing concrete pile 1 is hollowed to make the existing concrete pile 1 tubular. In a dividing process, the existing concrete pile 1 formed into a tubular shape in the tubular shape forming process is cut into round slices, and the existing concrete pile 1 is vertically divided. In a casing pressing-in process, after the dividing process, a casing 9 is pressed into the underground and the existing concrete pile 1 vertically divided in the dividing process is surrounded by the casing 9 pressed into the underground. In a removal process, the existing concrete pile 1 surrounded by the casing 9 pressed-in in the casing pressing-in process is removed. The tubular shape forming process, the dividing process, the casing pressing-in process and the removal process can be performed by a civil engineering machine with a relatively simple structure. Thus, the existing concrete pile 1 is removed more easily.SELECTED DRAWING: Figure 1
【課題】既設コンクリート杭の撤去をより容易にする。【解決手段】地中Eに埋設された既設コンクリート杭1の撤去方法で、管状化工程により、既設コンクリート杭1の外周部4が残されつつ、既設コンクリート杭1の内側5がくり抜かれ、既設コンクリート杭1が管状にされる。分割工程により、管状化工程で管状にされた既設コンクリート杭1が輪切りにされ、既設コンクリート杭1が上下方向に分割される。ケーシング圧入工程により、分割工程後に地中にケーシング9が圧入され、分割工程で上下方向に分割された既設コンクリート杭1が地中Eに圧入されたケーシング9で囲繞される。撤去工程により、ケーシング圧入工程で圧入されたケーシング9で囲繞された既設コンクリート杭1が撤去される。管状化工程、分割工程、ケーシング圧入工程及び撤去工程は、比較的に単純な構造の土木機械で行える。したがって、既設コンクリート杭1の撤去がより容易になる。【選択図】図1
REMOVAL METHOD OF EXISTING CONCRETE PILE
To remove an existing concrete pile more easily.SOLUTION: In a removal method of an existing concrete pile 1 embedded in the underground E, in a tubular shape forming process, while leaving an outer peripheral portion 4 of the existing concrete pile 1, an inside 5 of the existing concrete pile 1 is hollowed to make the existing concrete pile 1 tubular. In a dividing process, the existing concrete pile 1 formed into a tubular shape in the tubular shape forming process is cut into round slices, and the existing concrete pile 1 is vertically divided. In a casing pressing-in process, after the dividing process, a casing 9 is pressed into the underground and the existing concrete pile 1 vertically divided in the dividing process is surrounded by the casing 9 pressed into the underground. In a removal process, the existing concrete pile 1 surrounded by the casing 9 pressed-in in the casing pressing-in process is removed. The tubular shape forming process, the dividing process, the casing pressing-in process and the removal process can be performed by a civil engineering machine with a relatively simple structure. Thus, the existing concrete pile 1 is removed more easily.SELECTED DRAWING: Figure 1
【課題】既設コンクリート杭の撤去をより容易にする。【解決手段】地中Eに埋設された既設コンクリート杭1の撤去方法で、管状化工程により、既設コンクリート杭1の外周部4が残されつつ、既設コンクリート杭1の内側5がくり抜かれ、既設コンクリート杭1が管状にされる。分割工程により、管状化工程で管状にされた既設コンクリート杭1が輪切りにされ、既設コンクリート杭1が上下方向に分割される。ケーシング圧入工程により、分割工程後に地中にケーシング9が圧入され、分割工程で上下方向に分割された既設コンクリート杭1が地中Eに圧入されたケーシング9で囲繞される。撤去工程により、ケーシング圧入工程で圧入されたケーシング9で囲繞された既設コンクリート杭1が撤去される。管状化工程、分割工程、ケーシング圧入工程及び撤去工程は、比較的に単純な構造の土木機械で行える。したがって、既設コンクリート杭1の撤去がより容易になる。【選択図】図1
REMOVAL METHOD OF EXISTING CONCRETE PILE
既設コンクリート杭の撤去方法
HAYAKAWA HIROHISA (author) / SAKAI NOBUHIKO (author) / ONAKA TAKAFUMI (author) / MATSUMOTO ROTA (author) / IKEMOTO TAKASHI (author)
2022-09-06
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
EXISTING PILE REMOVAL DEVICE AND EXISTING PILE REMOVAL METHOD
European Patent Office | 2022
|EXISTING PILE REMOVAL DEVICE AND EXISTING PILE REMOVAL METHOD
European Patent Office | 2022
|EXISTING PILE REMOVAL DEVICE AND EXISTING PILE REMOVAL METHOD
European Patent Office | 2022
|CHISEL HAMMER FOR PILE REMOVAL, AND REMOVAL METHOD FOR EXISTING CONCRETE PILE USING THE SAME
European Patent Office | 2016
|