A platform for research: civil engineering, architecture and urbanism
SUCTION FOUNDATION
To improve the stability of a suction foundation.SOLUTION: A suction foundation 100 comprises a ceiling wall 11, a side peripheral wall 12 extending downward from the ceiling wall 11, a partition wall 13 that divides an upper space S defined by the ceiling wall 11, the side peripheral wall 12, and the ground G into a first space S1 and a second space S2 in a state in which the side peripheral wall 12 is penetrated into the underwater ground G. The second space S2 is formed along the side peripheral wall 12. A filling pipe 21 for filling the second space S2 with the filler 5 is connected to the second space S2. A drainage part 3 is provided in the second space S2 for discharging water from the second space S2 when the filler 5 is filled in the second space S2.SELECTED DRAWING: Figure 1
【課題】サクション基礎の安定性を向上させる。【解決手段】サクション基礎100は、天井壁11と、天井壁11から下方に延びる側周壁12と、側周壁12が水中の地盤Gに貫入された状態において天井壁11、側周壁12及び地盤Gによって区画される上部空間Sを第1空間S1と第2空間S2とに仕切る隔壁13とを備えている。第2空間S2は、側周壁12に沿って形成されている。第2空間S2には、第2空間S2に充填材5を充填する充填管21が接続されると共に、第2空間S2に充填材5が充填されるときに第2空間S2から水を排出する排水部3が設けられている。【選択図】図1
SUCTION FOUNDATION
To improve the stability of a suction foundation.SOLUTION: A suction foundation 100 comprises a ceiling wall 11, a side peripheral wall 12 extending downward from the ceiling wall 11, a partition wall 13 that divides an upper space S defined by the ceiling wall 11, the side peripheral wall 12, and the ground G into a first space S1 and a second space S2 in a state in which the side peripheral wall 12 is penetrated into the underwater ground G. The second space S2 is formed along the side peripheral wall 12. A filling pipe 21 for filling the second space S2 with the filler 5 is connected to the second space S2. A drainage part 3 is provided in the second space S2 for discharging water from the second space S2 when the filler 5 is filled in the second space S2.SELECTED DRAWING: Figure 1
【課題】サクション基礎の安定性を向上させる。【解決手段】サクション基礎100は、天井壁11と、天井壁11から下方に延びる側周壁12と、側周壁12が水中の地盤Gに貫入された状態において天井壁11、側周壁12及び地盤Gによって区画される上部空間Sを第1空間S1と第2空間S2とに仕切る隔壁13とを備えている。第2空間S2は、側周壁12に沿って形成されている。第2空間S2には、第2空間S2に充填材5を充填する充填管21が接続されると共に、第2空間S2に充填材5が充填されるときに第2空間S2から水を排出する排水部3が設けられている。【選択図】図1
SUCTION FOUNDATION
サクション基礎
KIMURA YUICHIRO (author) / HIGASHIYA OSAMU (author) / OKAMURA TAKETOSHI (author)
2022-09-14
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Floating suction barrel foundation construction method and floating suction barrel foundation
European Patent Office | 2021
|