A platform for research: civil engineering, architecture and urbanism
REINFORCEMENT INSERTION JIG AND REINFORCEMENT ASSEMBLY METHOD
To smoothly penetrate a reinforcement into a horizontal through-hole.SOLUTION: A reinforcement insertion jig 1 includes: a mounting part 10 which can be attached to/detached from a tip 102 side of the insertion direction side of a reinforcement 100 which is inserted into a horizontal and linear through-hole 202 provided at a column material (precast column 200); and a holding part 20 which is in contact with an inner peripheral surface (for example, an inner peripheral surface 214 of a sheath pipe 210) of the through-hole 202 further on the insertion direction side than the tip 102 of the reinforcement 100 to which the mounting part 10 is attached and lower than a lower end of a peripheral surface 104 of the reinforcement 100, and in which at least a contact surface 34 coming into contact with the inner peripheral surface of the through-hole 202 has an R shape.SELECTED DRAWING: Figure 5
【課題】水平な貫通孔に円滑に鉄筋を貫通させること。【解決手段】鉄筋挿通治具1は、柱材(プレキャスト柱200)に設けられた水平かつ直線的な貫通孔202に挿通される鉄筋100の挿入方向側の先端102側に着脱可能な装着部10と、装着部10が装着する鉄筋100の先端102より挿入方向側かつ鉄筋100の周面104の下端より下方で貫通孔202の内周面(例えば、シース管210の内周面214)に接地し、少なくとも貫通孔202の内周面に接地する接地面34がR形状である保持部20と、を備える。【選択図】図5
REINFORCEMENT INSERTION JIG AND REINFORCEMENT ASSEMBLY METHOD
To smoothly penetrate a reinforcement into a horizontal through-hole.SOLUTION: A reinforcement insertion jig 1 includes: a mounting part 10 which can be attached to/detached from a tip 102 side of the insertion direction side of a reinforcement 100 which is inserted into a horizontal and linear through-hole 202 provided at a column material (precast column 200); and a holding part 20 which is in contact with an inner peripheral surface (for example, an inner peripheral surface 214 of a sheath pipe 210) of the through-hole 202 further on the insertion direction side than the tip 102 of the reinforcement 100 to which the mounting part 10 is attached and lower than a lower end of a peripheral surface 104 of the reinforcement 100, and in which at least a contact surface 34 coming into contact with the inner peripheral surface of the through-hole 202 has an R shape.SELECTED DRAWING: Figure 5
【課題】水平な貫通孔に円滑に鉄筋を貫通させること。【解決手段】鉄筋挿通治具1は、柱材(プレキャスト柱200)に設けられた水平かつ直線的な貫通孔202に挿通される鉄筋100の挿入方向側の先端102側に着脱可能な装着部10と、装着部10が装着する鉄筋100の先端102より挿入方向側かつ鉄筋100の周面104の下端より下方で貫通孔202の内周面(例えば、シース管210の内周面214)に接地し、少なくとも貫通孔202の内周面に接地する接地面34がR形状である保持部20と、を備える。【選択図】図5
REINFORCEMENT INSERTION JIG AND REINFORCEMENT ASSEMBLY METHOD
鉄筋挿通治具及び鉄筋の組立方法
TSUKAMOTO YASUYOSHI (author) / TANAKA RYOICHI (author) / TOSAUCHI YUSUKE (author) / KOMATSUBARA TOMOMASA (author) / SAKURAI IKUTO (author)
2022-09-26
Patent
Electronic Resource
Japanese
INSERTION METHOD OF COMPRESSED NET-LIKE REINFORCEMENT WITH MOUTH REINFORCEMENT PIPE
European Patent Office | 2021
|REINFORCEMENT SUPPORT DEVICE AND REINFORCEMENT ASSEMBLY METHOD
European Patent Office | 2017
|STEEL REINFORCEMENT COUPLER ENABLE TO CHECK INSERTION DEPTH OF STEEL REINFORCEMENT
European Patent Office | 2018
|