A platform for research: civil engineering, architecture and urbanism
ROOF MATERIAL PLACEMENT METHOD FOR LONG HORIZONTAL ROOFING MODULE ROOF MATERIAL
To solve the problem that in the conventional roof material placement method for long horizontal roofing materials, allocation of roofing materials to a roof surface differs from site to site, making it difficult to allocate, and construction involving the processing of roofing materials at ends of a roof requires the skill and effort of craftsmen.SOLUTION: In the roof material placement method for long horizontal roofing module roof materials of the present invention, in a roof of a building with a pitch, where the roof has a corner ridge or valley, the horizontal projected dimension of the working length of the roof material is an integer fraction of the design unit dimension of the building. The working width dimension of the roof material is an integral multiple of two or more times the horizontal projected dimension of the working length. When arranging the roof material for each level, the integral multiple of the horizontal projected dimension of the working length of the roof material is shifted, so that a standardized shape roof material for the roof edge standardized by the central slope of the standardized slope range is arranged on all the roof edges.SELECTED DRAWING: Figure 1
【課題】従来の長尺横葺き屋根材の配置方法は、屋根面に屋根材を割り付けるのが現場ごとに異なるため割付が難しく、かつ屋根端部での屋根材の加工を伴う施工に職人の技能と手間が掛かるという課題があった。【解決手段】本発明の長尺横葺きモジュール屋根材の配置方法は、勾配を有する建物の屋根であって、屋根は隅棟又は谷を有する屋根において、屋根材の働き長さの水平投影寸法が建物の設計単位寸法の整数分の一であり、屋根材の働き幅寸法が働き長さの水平投影寸法の二倍以上の整数倍であり、屋根材を一段毎に配置する際に屋根材の働き長さの水平投影寸法の整数倍をずらして、全ての屋根端部に規格化勾配範囲の中央勾配で規格化した屋根端部規格化形状屋根材を配置する。【選択図】 図1
ROOF MATERIAL PLACEMENT METHOD FOR LONG HORIZONTAL ROOFING MODULE ROOF MATERIAL
To solve the problem that in the conventional roof material placement method for long horizontal roofing materials, allocation of roofing materials to a roof surface differs from site to site, making it difficult to allocate, and construction involving the processing of roofing materials at ends of a roof requires the skill and effort of craftsmen.SOLUTION: In the roof material placement method for long horizontal roofing module roof materials of the present invention, in a roof of a building with a pitch, where the roof has a corner ridge or valley, the horizontal projected dimension of the working length of the roof material is an integer fraction of the design unit dimension of the building. The working width dimension of the roof material is an integral multiple of two or more times the horizontal projected dimension of the working length. When arranging the roof material for each level, the integral multiple of the horizontal projected dimension of the working length of the roof material is shifted, so that a standardized shape roof material for the roof edge standardized by the central slope of the standardized slope range is arranged on all the roof edges.SELECTED DRAWING: Figure 1
【課題】従来の長尺横葺き屋根材の配置方法は、屋根面に屋根材を割り付けるのが現場ごとに異なるため割付が難しく、かつ屋根端部での屋根材の加工を伴う施工に職人の技能と手間が掛かるという課題があった。【解決手段】本発明の長尺横葺きモジュール屋根材の配置方法は、勾配を有する建物の屋根であって、屋根は隅棟又は谷を有する屋根において、屋根材の働き長さの水平投影寸法が建物の設計単位寸法の整数分の一であり、屋根材の働き幅寸法が働き長さの水平投影寸法の二倍以上の整数倍であり、屋根材を一段毎に配置する際に屋根材の働き長さの水平投影寸法の整数倍をずらして、全ての屋根端部に規格化勾配範囲の中央勾配で規格化した屋根端部規格化形状屋根材を配置する。【選択図】 図1
ROOF MATERIAL PLACEMENT METHOD FOR LONG HORIZONTAL ROOFING MODULE ROOF MATERIAL
長尺横葺きモジュール屋根材の屋根材配置方法
OGURI KAZUHIKO (author)
2022-10-18
Patent
Electronic Resource
Japanese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
ROOF MATERIAL ARRANGEMENT METHOD FOR LONG HORIZONTAL ROOFING MODULE ROOF MATERIAL
European Patent Office | 2021
|European Patent Office | 2020
|European Patent Office | 2020
|ROOFING MATERIAL, AND ROOF SYSTEM INCLUDING THE ROOFING MATERIAL
European Patent Office | 2024
|