A platform for research: civil engineering, architecture and urbanism
FOUNDATION STRUCTURE, METHOD FOR CONSTRUCTING FOUNDATION STRUCTURE, AND CONSOLIDATION SUPPORT MEMBER
PROBLEM TO BE SOLVED: To provide a foundation structure, a method for constructing a foundation structure, and a consolidation support member, which make it possible to more efficiently and effectively prevent the unequal settlement of a building.SOLUTION: A foundation structure comprises a consolidation support member 2 disposed to penetrate downward from a bottom portion 1a of a drilling hole 1 formed by drilling the ground G, a consolidation portion 3 compacted and formed in the ground G while penetrating the consolidation support member 2 into the ground G and pressing downward the ground G from the bottom 1a of the drilling hole 1, and a foundation body 5 formed by casting foundation concrete on the consolidation support member 2. The consolidation support member 2 includes a penetration portion 2a penetrating the ground G and a pressure receiving portion 2d attached to the penetration portion 2a and extending in the transverse direction T2 and abutting against the bottom portion 1a of the drilling hole 1.SELECTED DRAWING: Figure 1
【課題】より効率的且つ効果的に建物の不同沈下を防止することを可能にする基礎構造及び基礎構造の施工方法、並びに圧密支持部材を提供する。【解決手段】地盤Gを掘削して形成した掘削孔1の底部1aから下方に貫入して配設される圧密支持部材2と、圧密支持部材2を地盤Gに貫入しつつ掘削孔1の底部1aから下方の地盤Gを押圧し、地盤Gに圧密形成される圧密部3と、圧密支持部材2の上に基礎コンクリートを打設して形成される基礎本体5とを備える。圧密支持部材2は、地盤Gに貫入する貫入部2aと、貫入部2aに取り付けられるとともに横方向T2に延設されて掘削孔1の底部1aに当接する受圧部2dとを備えて構成する。【選択図】図1
FOUNDATION STRUCTURE, METHOD FOR CONSTRUCTING FOUNDATION STRUCTURE, AND CONSOLIDATION SUPPORT MEMBER
PROBLEM TO BE SOLVED: To provide a foundation structure, a method for constructing a foundation structure, and a consolidation support member, which make it possible to more efficiently and effectively prevent the unequal settlement of a building.SOLUTION: A foundation structure comprises a consolidation support member 2 disposed to penetrate downward from a bottom portion 1a of a drilling hole 1 formed by drilling the ground G, a consolidation portion 3 compacted and formed in the ground G while penetrating the consolidation support member 2 into the ground G and pressing downward the ground G from the bottom 1a of the drilling hole 1, and a foundation body 5 formed by casting foundation concrete on the consolidation support member 2. The consolidation support member 2 includes a penetration portion 2a penetrating the ground G and a pressure receiving portion 2d attached to the penetration portion 2a and extending in the transverse direction T2 and abutting against the bottom portion 1a of the drilling hole 1.SELECTED DRAWING: Figure 1
【課題】より効率的且つ効果的に建物の不同沈下を防止することを可能にする基礎構造及び基礎構造の施工方法、並びに圧密支持部材を提供する。【解決手段】地盤Gを掘削して形成した掘削孔1の底部1aから下方に貫入して配設される圧密支持部材2と、圧密支持部材2を地盤Gに貫入しつつ掘削孔1の底部1aから下方の地盤Gを押圧し、地盤Gに圧密形成される圧密部3と、圧密支持部材2の上に基礎コンクリートを打設して形成される基礎本体5とを備える。圧密支持部材2は、地盤Gに貫入する貫入部2aと、貫入部2aに取り付けられるとともに横方向T2に延設されて掘削孔1の底部1aに当接する受圧部2dとを備えて構成する。【選択図】図1
FOUNDATION STRUCTURE, METHOD FOR CONSTRUCTING FOUNDATION STRUCTURE, AND CONSOLIDATION SUPPORT MEMBER
基礎構造及び基礎構造の施工方法、並びに圧密支持部材
TAKEDA MASAHARU (author)
2018-07-12
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
FOUNDATION CONSOLIDATION STRUCTURE OF SEABED AND FOUNDATION CONSOLIDATION METHOD
European Patent Office | 2022
|METHOD FOR CONSTRUCTING FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE
European Patent Office | 2024
|FOUNDATION STRUCTURE, AND METHOD FOR CONSTRUCTING FOUNDATION STRUCTURE
European Patent Office | 2019
|FOUNDATION STRUCTURE AND METHOD OF CONSTRUCTING FOUNDATION
European Patent Office | 2021
|FOUNDATION STRUCTURE AND METHOD OF CONSTRUCTING FOUNDATION
European Patent Office | 2021
|