CEILING BOARD CONSTRUCTION ROBOT
To place a ceiling board to a frame body by using a ceiling board construction robot.SOLUTION: A ceiling board construction robot 100 to place ceiling boards 8 onto frame bodies 6 supported by a ceiling slab 1 comprises: a truck part 10 movable on a floor surface 2; an elevation part 21 placed on the truck part 10; an arm part 30 extending towards the frame body 6 from the elevation part 21; a holding part 40 provided at a tip side of the arm part 30 and capable of holding the ceiling board 8; state detection parts 51, 52 capable of detecting a frame body state regarding the shape of the frame body 6; and a control part 50 for controlling the actuation of the arm part 30. The control part 50 makes the arm part 30 actuate on the basis of the frame body state so that the ceiling board 8 supported by the holding part 40 is placed onto the frame bodies 6 by being dropped from above the frame bodies 6.SELECTED DRAWING: Figure 1
【課題】天井ボードを天井ボード施工ロボットによって枠体に載置する。【解決手段】天井スラブ1により支持された枠体6に天井ボード8を載置する天井ボード施工ロボット100は、床面2を移動可能な台車部10と、台車部10上に載置される昇降部21と、昇降部21から枠体6に向かって延びるアーム部30と、アーム部30の先端側に設けられ天井ボード8を保持可能な保持部40と、枠体6の形状に関する枠体状態を検知可能な状態検知部51,52と、アーム部30の作動を制御する制御部50と、を備え、制御部50は、保持部40によって保持された天井ボード8が枠体6の上方から落とし込まれることにより枠体6に載置されるように、枠体状態に基づいてアーム部30を作動させる。【選択図】図1
CEILING BOARD CONSTRUCTION ROBOT
To place a ceiling board to a frame body by using a ceiling board construction robot.SOLUTION: A ceiling board construction robot 100 to place ceiling boards 8 onto frame bodies 6 supported by a ceiling slab 1 comprises: a truck part 10 movable on a floor surface 2; an elevation part 21 placed on the truck part 10; an arm part 30 extending towards the frame body 6 from the elevation part 21; a holding part 40 provided at a tip side of the arm part 30 and capable of holding the ceiling board 8; state detection parts 51, 52 capable of detecting a frame body state regarding the shape of the frame body 6; and a control part 50 for controlling the actuation of the arm part 30. The control part 50 makes the arm part 30 actuate on the basis of the frame body state so that the ceiling board 8 supported by the holding part 40 is placed onto the frame bodies 6 by being dropped from above the frame bodies 6.SELECTED DRAWING: Figure 1
【課題】天井ボードを天井ボード施工ロボットによって枠体に載置する。【解決手段】天井スラブ1により支持された枠体6に天井ボード8を載置する天井ボード施工ロボット100は、床面2を移動可能な台車部10と、台車部10上に載置される昇降部21と、昇降部21から枠体6に向かって延びるアーム部30と、アーム部30の先端側に設けられ天井ボード8を保持可能な保持部40と、枠体6の形状に関する枠体状態を検知可能な状態検知部51,52と、アーム部30の作動を制御する制御部50と、を備え、制御部50は、保持部40によって保持された天井ボード8が枠体6の上方から落とし込まれることにより枠体6に載置されるように、枠体状態に基づいてアーム部30を作動させる。【選択図】図1
CEILING BOARD CONSTRUCTION ROBOT
天井ボード施工ロボット
YANAGIDA KATSUMI (author) / KOMATSU ATSUSHI (author) / OKA NAOTO (author) / HASEGAWA YOSHIHIDE (author) / TEJIMA NORIO (author) / ITO MAKOTO (author) / MIMURO KEIJI (author) / KATO YOSUKE (author) / TAKAMOTO YOICHI (author) / KAWAKUBO YUJI (author)
2023-07-10
Patent
Electronic Resource
Japanese
CEILING STRUCTURE, CEILING BOARD INSTALLATION COMPONENT AND CONSTRUCTION METHOD OF CEILING STRUCTURE
European Patent Office | 2018
|CEILING BOARD SUPPORT, CEILING STRUCTURE, AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2021
|