CONSTRUCTION METHOD OF RUBBLE MOUND
To calculate an appropriate height for dropping a weight during leveling construction of a rubble mound.SOLUTION: Measured value acquisition means 111 acquires a measured value of a height of a top surface 30 of a rubble mound 3 before tamping, and a measured value of the displacement amount of the height of the rubble mound 3 after tamping. Teacher data generating means 112 generates first teacher data 121 by specifying or calculating an explanatory variable and a target variable from the conditions of the executed tamping and the acquired measurement values. Learning model construction means 113 uses the generated first teacher data 121 to calculate a group of parameters for deriving the objective variable from the explanatory variables, and constructs a first learning model 122 using these. Fall height estimating means 114 estimates, based on the constructed first learning model 122, the height at which the weight 212 should be lifted and dropped in the next instructed tamping. Display control means 115 instructs a display unit 15 to display an estimated value of a fall height.SELECTED DRAWING: Figure 11
【課題】捨石マウンドの均し施工において重錘を落下させる適切な高さを算出する。【解決手段】計測値取得手段111は、打突前の捨石マウンド3の天端面30の高さの計測値と、打突後の捨石マウンド3の高さの変位量の計測値とを取得する。教師データ生成手段112は、実行した打突の条件と取得した計測値とから、説明変数、及び目的変数を特定、又は算出して第1教師データ121を生成する。学習モデル構築手段113は、生成された第1教師データ121を用いて、その説明変数から目的変数が導かれるためのパラメータ群等を算出し、これらを用いて第1学習モデル122を構築する。落下高さ推定手段114は、構築された第1学習モデル122に基づいて、次に指示する打突の際に重錘212を吊り上げて落下させるべき高さを推定する。表示制御手段115は、表示部15に対し、落下高さの推定値を表示する指示を行う。【選択図】図11
CONSTRUCTION METHOD OF RUBBLE MOUND
To calculate an appropriate height for dropping a weight during leveling construction of a rubble mound.SOLUTION: Measured value acquisition means 111 acquires a measured value of a height of a top surface 30 of a rubble mound 3 before tamping, and a measured value of the displacement amount of the height of the rubble mound 3 after tamping. Teacher data generating means 112 generates first teacher data 121 by specifying or calculating an explanatory variable and a target variable from the conditions of the executed tamping and the acquired measurement values. Learning model construction means 113 uses the generated first teacher data 121 to calculate a group of parameters for deriving the objective variable from the explanatory variables, and constructs a first learning model 122 using these. Fall height estimating means 114 estimates, based on the constructed first learning model 122, the height at which the weight 212 should be lifted and dropped in the next instructed tamping. Display control means 115 instructs a display unit 15 to display an estimated value of a fall height.SELECTED DRAWING: Figure 11
【課題】捨石マウンドの均し施工において重錘を落下させる適切な高さを算出する。【解決手段】計測値取得手段111は、打突前の捨石マウンド3の天端面30の高さの計測値と、打突後の捨石マウンド3の高さの変位量の計測値とを取得する。教師データ生成手段112は、実行した打突の条件と取得した計測値とから、説明変数、及び目的変数を特定、又は算出して第1教師データ121を生成する。学習モデル構築手段113は、生成された第1教師データ121を用いて、その説明変数から目的変数が導かれるためのパラメータ群等を算出し、これらを用いて第1学習モデル122を構築する。落下高さ推定手段114は、構築された第1学習モデル122に基づいて、次に指示する打突の際に重錘212を吊り上げて落下させるべき高さを推定する。表示制御手段115は、表示部15に対し、落下高さの推定値を表示する指示を行う。【選択図】図11
CONSTRUCTION METHOD OF RUBBLE MOUND
捨石マウンドの施工方法
YAMANOI AKIRA (author) / BABA TEPPEI (author) / MIKI TAKAYUKI (author)
2023-10-16
Patent
Electronic Resource
Japanese
RUBBLE MOUND CONSTRUCTION SYSTEM AND RUBBLE MOUND CONSTRUCTION METHOD
European Patent Office | 2021
|RUBBLE MOUND LEVELING SYSTEM AND RUBBLE MOUND LEVELING METHOD
European Patent Office | 2023
|RUBBLE MOUND LEVELING SYSTEM AND RUBBLE MOUND LEVELING METHOD
European Patent Office | 2023
|RUBBLE-MOUND BREAKWATER CONSTRUCTION SIMULATION
TIBKAT | 2020
|Design of rubble mound breakwaters
Engineering Index Backfile | 1963
|