A platform for research: civil engineering, architecture and urbanism
BUILDING FOUNDATION, AND CONSTRUCTION METHOD OF BUILDING FOUNDATION
To provide a building foundation that can be provided with a tie beam structure as needed, and a method for constructing the same.SOLUTION: A building foundation 10 comprises: a first foundation portion 13 having a first erected portion 22; a second foundation portion 14 extending parallel to the first foundation portion 13 and having a second erected portion 27; and a foundation tie beam portion 30 connecting the first erected portion 22 to the second erected portion 27. The foundation tie beam portion 30 comprises: a first contact portion 32 that contacts a first outer surface 23 of the first erected portion 22; a second contact portion 33 that contacts a second outer surface 28 of the second erected portion 27; and a connecting member 31 that connects the first contact portion 32 to the second contact portion 33. The connecting member 31 penetrates the first foundation portion 13 and is connected to the first contact portion 32, and penetrates the second foundation portion 14 and is connected to the second contact portion 33.SELECTED DRAWING: Figure 1
【課題】必要に応じて、繋ぎ梁構造を設けることができる建築物の基礎およびその施工方法を提供する。【解決手段】建築物の基礎10は、第1立ち上がり部22を有する第1基礎部13と、第1基礎部13に平行に延びて第2立ち上がり部27を有する第2基礎部14と、第1立ち上がり部22と第2立ち上がり部27とを連結する基礎つなぎ梁部30と、を備える。基礎つなぎ梁部30は、第1立ち上がり部22の第1外面23に接触する第1接触部32と、第2立ち上がり部27の第2外面28に接触する第2接触部33と、第1接触部32と第2接触部33とを連結する連結部材31と、を備える。連結部材31は、第1基礎部13を貫通して第1接触部32に接続し、かつ、第2基礎部14を貫通して第2接触部33に接続する。【選択図】図1
BUILDING FOUNDATION, AND CONSTRUCTION METHOD OF BUILDING FOUNDATION
To provide a building foundation that can be provided with a tie beam structure as needed, and a method for constructing the same.SOLUTION: A building foundation 10 comprises: a first foundation portion 13 having a first erected portion 22; a second foundation portion 14 extending parallel to the first foundation portion 13 and having a second erected portion 27; and a foundation tie beam portion 30 connecting the first erected portion 22 to the second erected portion 27. The foundation tie beam portion 30 comprises: a first contact portion 32 that contacts a first outer surface 23 of the first erected portion 22; a second contact portion 33 that contacts a second outer surface 28 of the second erected portion 27; and a connecting member 31 that connects the first contact portion 32 to the second contact portion 33. The connecting member 31 penetrates the first foundation portion 13 and is connected to the first contact portion 32, and penetrates the second foundation portion 14 and is connected to the second contact portion 33.SELECTED DRAWING: Figure 1
【課題】必要に応じて、繋ぎ梁構造を設けることができる建築物の基礎およびその施工方法を提供する。【解決手段】建築物の基礎10は、第1立ち上がり部22を有する第1基礎部13と、第1基礎部13に平行に延びて第2立ち上がり部27を有する第2基礎部14と、第1立ち上がり部22と第2立ち上がり部27とを連結する基礎つなぎ梁部30と、を備える。基礎つなぎ梁部30は、第1立ち上がり部22の第1外面23に接触する第1接触部32と、第2立ち上がり部27の第2外面28に接触する第2接触部33と、第1接触部32と第2接触部33とを連結する連結部材31と、を備える。連結部材31は、第1基礎部13を貫通して第1接触部32に接続し、かつ、第2基礎部14を貫通して第2接触部33に接続する。【選択図】図1
BUILDING FOUNDATION, AND CONSTRUCTION METHOD OF BUILDING FOUNDATION
建築物の基礎および建築物の基礎の施工方法
SHIMIZU KOSUKE (author) / MATSUBARA YOSHIYUKI (author)
2023-10-05
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Building foundation pit construction equipment and building foundation pit construction method
European Patent Office | 2022
|BUILDING FOUNDATION STRUCTURE AND CONSTRUCTION METHOD FOR BUILDING FOUNDATION STRUCTURE
European Patent Office | 2024
|FOUNDATION CONSTRUCTION METHOD OF BUILDING AND FOUNDATION STRUCTURE OF BUILDING
European Patent Office | 2018
|Building foundation building pouring construction method
European Patent Office | 2021
|