METHOD FOR CONSTRUCTING UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE
To provide a method for constructing an underground structure and an underground structure which are capable of shortening the construction period and suppressing the impact on surrounding infrastructure and buildings.SOLUTION: A method for constructing an underground structure comprises an earth retaining wall construction step in which an earth retaining wall 11 is constructed in the ground so as to surround a construction area of the underground structure, a support pile driving step of driving support piles 5 into an outer peripheral portion 3 within the construction area, a sheathing wall construction step of constructing a sheathing wall 22 at a boundary between an outer peripheral portion and an inner peripheral portion 4 surrounded by the inner peripheral side of the outer peripheral portion, an outer peripheral underground structure construction step of constructing an outer peripheral underground structure 7A in the outer peripheral portion, and an inner peripheral underground structure construction step of constructing an inner peripheral underground structure 7B in the inner peripheral portion. A high strength support pile 5A is used as at least a part of the support pile, an inverted driving method is used in the outer peripheral underground structure construction step, and a forward driving method is used in the inner peripheral underground structure construction step.SELECTED DRAWING: Figure 9
【課題】工期を短縮できるとともに、周辺のインフラや建物への影響も抑制することができる地下構造物の施工方法および地下構造物を提供する。【解決手段】地下構造物の構築領域を囲むように地盤に土留壁11を構築する土留壁構築工程と、構築領域内における外周部分3に支持杭5を打設する支持杭打設工程と、外周部分と、該外周部分の内周側に囲まれた内周部分4と、の境界に山留壁22を構築する山留壁構築工程と、外周部分に外周地下構造物7Aを構築する外周地下構造物構築工程と、内周部分に内周地下構造物7Bを構築する内周地下構造物構築工程と、を有し、支持杭の少なくとも一部に高耐力支持杭5Aが用いられ、外周地下構造物構築工程は、逆打工法が用いられ、内周地下構造物構築工程は、順打工法が用いられる。【選択図】図9
METHOD FOR CONSTRUCTING UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE
To provide a method for constructing an underground structure and an underground structure which are capable of shortening the construction period and suppressing the impact on surrounding infrastructure and buildings.SOLUTION: A method for constructing an underground structure comprises an earth retaining wall construction step in which an earth retaining wall 11 is constructed in the ground so as to surround a construction area of the underground structure, a support pile driving step of driving support piles 5 into an outer peripheral portion 3 within the construction area, a sheathing wall construction step of constructing a sheathing wall 22 at a boundary between an outer peripheral portion and an inner peripheral portion 4 surrounded by the inner peripheral side of the outer peripheral portion, an outer peripheral underground structure construction step of constructing an outer peripheral underground structure 7A in the outer peripheral portion, and an inner peripheral underground structure construction step of constructing an inner peripheral underground structure 7B in the inner peripheral portion. A high strength support pile 5A is used as at least a part of the support pile, an inverted driving method is used in the outer peripheral underground structure construction step, and a forward driving method is used in the inner peripheral underground structure construction step.SELECTED DRAWING: Figure 9
【課題】工期を短縮できるとともに、周辺のインフラや建物への影響も抑制することができる地下構造物の施工方法および地下構造物を提供する。【解決手段】地下構造物の構築領域を囲むように地盤に土留壁11を構築する土留壁構築工程と、構築領域内における外周部分3に支持杭5を打設する支持杭打設工程と、外周部分と、該外周部分の内周側に囲まれた内周部分4と、の境界に山留壁22を構築する山留壁構築工程と、外周部分に外周地下構造物7Aを構築する外周地下構造物構築工程と、内周部分に内周地下構造物7Bを構築する内周地下構造物構築工程と、を有し、支持杭の少なくとも一部に高耐力支持杭5Aが用いられ、外周地下構造物構築工程は、逆打工法が用いられ、内周地下構造物構築工程は、順打工法が用いられる。【選択図】図9
METHOD FOR CONSTRUCTING UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE
地下構造物の施工方法および地下構造物
MIYAZAKI HIROMITSU (author) / NAKABAYASHI KIYOFUMI (author) / SHIBUYA TOSHIYASU (author)
2024-01-24
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|UNDERGROUND STRUCTURE AND METHOD OF CONSTRUCTING UNDERGROUND STRUCTURE
European Patent Office | 2018
|METHOD OF CONSTRUCTING UNDERGROUND STRUCTURE, FORM AND UNDERGROUND STRUCTURE
European Patent Office | 2018
|UNDERGROUND STRUCTURE, BUILDING AND METHOD FOR CONSTRUCTING UNDERGROUND STRUCTURE
European Patent Office | 2020
|UNDERGROUND SPACE STRUCTURE AND METHOD FOR CONSTRUCTING UNDERGROUND SPACE STRUCTURE
European Patent Office | 2015
|