A platform for research: civil engineering, architecture and urbanism
Installation method of steel sheet pile
The invention provides an installation method of a steel sheet pile. The installation method comprises the following steps that slope excavation is conducted around a preset cofferdam area, and the steel sheet pile is put down in an inserting and driving mode; the steel sheet pile is inserted and driven to a corner pile for folding, and the size of a folding opening of the steel sheet pile is adjusted; and the steel sheet pile is inserted, driven and folded to complete installation of a steel sheet pile cofferdam. The installation method of the steel sheet pile is convenient to operate, the perpendicularity and position precision of the steel sheet pile are easy to control, the construction period is short, it is ensured that a project is safe and smooth to implement, construction is completed according to the target construction period, and good social benefits and economic benefits are achieved.
本申请提供一种钢板桩的安装方法,包括以下步骤:在预设的围堰区域周围放坡开挖并以插打方式下放钢板桩;插打钢板桩至角桩处进行合拢,并调节钢板桩合拢口的尺寸;插打合拢钢板桩以完成钢板桩围堰的安装。本申请的钢板桩的安装方法的操作方便,且钢板桩的垂直度和位置精度控制容易,施工周期短,该钢板桩的安装方法确保项目安全、顺利实施和并按目标工期完工,具有良好的社会效益和经济效益。
Installation method of steel sheet pile
The invention provides an installation method of a steel sheet pile. The installation method comprises the following steps that slope excavation is conducted around a preset cofferdam area, and the steel sheet pile is put down in an inserting and driving mode; the steel sheet pile is inserted and driven to a corner pile for folding, and the size of a folding opening of the steel sheet pile is adjusted; and the steel sheet pile is inserted, driven and folded to complete installation of a steel sheet pile cofferdam. The installation method of the steel sheet pile is convenient to operate, the perpendicularity and position precision of the steel sheet pile are easy to control, the construction period is short, it is ensured that a project is safe and smooth to implement, construction is completed according to the target construction period, and good social benefits and economic benefits are achieved.
本申请提供一种钢板桩的安装方法,包括以下步骤:在预设的围堰区域周围放坡开挖并以插打方式下放钢板桩;插打钢板桩至角桩处进行合拢,并调节钢板桩合拢口的尺寸;插打合拢钢板桩以完成钢板桩围堰的安装。本申请的钢板桩的安装方法的操作方便,且钢板桩的垂直度和位置精度控制容易,施工周期短,该钢板桩的安装方法确保项目安全、顺利实施和并按目标工期完工,具有良好的社会效益和经济效益。
Installation method of steel sheet pile
钢板桩的安装方法
CHAI WEI (author) / XIONG JIANXING (author) / XU SHAOHUA (author) / WU MINGHUAN (author) / CHEN GUANGTENG (author)
2021-11-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE SHEET PILE AND INSTALLATION METHOD OF STEEL PIPE SHEET PILE
European Patent Office | 2020
|European Patent Office | 2015
|STEEL PIPE SHEET PILE AND INSTALLATION AUXILIARY IMPLEMENT OF STEEL PIPE SHEET PILE
European Patent Office | 2015
|