STEEL PIPE DRIVING METHOD AND POSTURE HOLDING DEVICE
To provide a steel pipe driving method which stabilizes its posture so that a pier panel installed so as to overhang in pier construction does not come off from a design position.SOLUTION: Provided is a steel pipe driving method for constructing a bridge by repeating the steps of: installing a pier panel so as to overhang in a cantilever form; and driving a support pile P by using the pier panel overhanging in the cantilever form. The method firstly installs a new pier panel 1 having a guide part 3 so as to overhang in the cantilever form. Then, the method installs a posture holding device 5 for holding a posture of the pier panel 1 so that the pier panel 1 overhanging in the cantilever form does not come off from a design position when the support pile is driven. In addition, the method installs a support pile driving device 4 on the guide part 3 of the pier panel 1. The method drives the support panel P into the ground by the support pile driving device 4, in a state where the pier panel 1 overhanging in the cantilever form is held on the design position by the posture holding device 4.SELECTED DRAWING: Figure 2E
【課題】桟橋施工において張り出すように設置した桟橋パネルが設計位置から外れないようにその姿勢を安定させる鋼管類打設方法を提供する。【解決手段】本発明の鋼管類打設方法は、片持ち状に張り出すように桟橋パネルを設置する工程と、片持ち状に張り出した桟橋パネルを利用して支持杭Pを打設する工程と、を繰り返して橋梁を構築する方法に関するものである。この方法において、はじめに、ガイド部3を備えた新設の桟橋パネル1を片持ち状に張り出すように設置する。次いで、片持ち状に張り出した桟橋パネル1が支持杭打設時に設計位置から外れないように、当該桟橋パネル1の姿勢を保持するための姿勢保持装置5を設置する。また、桟橋パネル1のガイド部3に支持杭打設装置4を設置する。そして、片持ち状に張り出した桟橋パネル1を、姿勢保持装置4により設計位置に保持した状態で、支持杭Pを支持杭打設装置4により地盤に打設する。【選択図】図2E
STEEL PIPE DRIVING METHOD AND POSTURE HOLDING DEVICE
To provide a steel pipe driving method which stabilizes its posture so that a pier panel installed so as to overhang in pier construction does not come off from a design position.SOLUTION: Provided is a steel pipe driving method for constructing a bridge by repeating the steps of: installing a pier panel so as to overhang in a cantilever form; and driving a support pile P by using the pier panel overhanging in the cantilever form. The method firstly installs a new pier panel 1 having a guide part 3 so as to overhang in the cantilever form. Then, the method installs a posture holding device 5 for holding a posture of the pier panel 1 so that the pier panel 1 overhanging in the cantilever form does not come off from a design position when the support pile is driven. In addition, the method installs a support pile driving device 4 on the guide part 3 of the pier panel 1. The method drives the support panel P into the ground by the support pile driving device 4, in a state where the pier panel 1 overhanging in the cantilever form is held on the design position by the posture holding device 4.SELECTED DRAWING: Figure 2E
【課題】桟橋施工において張り出すように設置した桟橋パネルが設計位置から外れないようにその姿勢を安定させる鋼管類打設方法を提供する。【解決手段】本発明の鋼管類打設方法は、片持ち状に張り出すように桟橋パネルを設置する工程と、片持ち状に張り出した桟橋パネルを利用して支持杭Pを打設する工程と、を繰り返して橋梁を構築する方法に関するものである。この方法において、はじめに、ガイド部3を備えた新設の桟橋パネル1を片持ち状に張り出すように設置する。次いで、片持ち状に張り出した桟橋パネル1が支持杭打設時に設計位置から外れないように、当該桟橋パネル1の姿勢を保持するための姿勢保持装置5を設置する。また、桟橋パネル1のガイド部3に支持杭打設装置4を設置する。そして、片持ち状に張り出した桟橋パネル1を、姿勢保持装置4により設計位置に保持した状態で、支持杭Pを支持杭打設装置4により地盤に打設する。【選択図】図2E
STEEL PIPE DRIVING METHOD AND POSTURE HOLDING DEVICE
鋼管類打設方法、姿勢保持装置
YOKOYAMA HIROSUKE (author)
2024-07-10
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
HOLDING DEVICE FOR ROTATING AND PRESS-FITTING STEEL PIPE AND METHOD FOR HOLDING STEEL PIPE
European Patent Office | 2017
|STEEL PIPE CORRECTION METHOD, STEEL PIPE JOINING METHOD, AND SHAPE HOLDING TOOL
European Patent Office | 2017
|HOLDING DEVICE OF VIBRATION HAMMER, AND INSTALLATION METHOD OF STEEL PIPE PILE
European Patent Office | 2017
|STEEL PIPE PILE DRIVING JIG, AND STEEL PIPE PILE WITH STEEL PIPE PILE DRIVING JIG
European Patent Office | 2024
|