A platform for research: civil engineering, architecture and urbanism
ROOF WALL MATERIAL AND INSTALLATION METHOD OF ROOF WALL MATERIAL
To provide roof wall material and an installation method of the roof wall material eliminating removal of indoor facilities and the like upon work and capable of operating the indoor facilities during a work period.SOLUTION: The roof wall material is provided with: a plate-like substrate; a first sandwich plate sandwiching a part of a roof between the substrate and itself, which is installed on a first end part at one side in a specific direction of a first surface of the substrate, and connected on the substrate with a first bolt and a first nut; and a second sandwich plate sandwiching a part of a surrounding roof between the substrate and itself, installed on a second end part side of the other side in a specific direction of a second surface of a rear surface side of the first surface of the substrate apart from the second end part and connected on the substrate with a second bolt and a second nut.SELECTED DRAWING: Figure 1
【課題】作業を行う際に屋内設備等を撤去する必要が無く、作業期間において屋内設備を稼働することが可能な屋根壁材及び屋根壁材の設定方法を提供する。【解決手段】屋根壁材は、板状の基材と、基材の第1面のうち所定方向の一方側の第1端部に配置され、第1ボルト及び第1ナットにより基材に連結され、基材との間で屋根の一部を挟み込む第1挟み込み板と、基材の第1面の裏面側である第2面のうち所定方向の他方側の第2端部側に当該第2端部とは間隔を空けて配置され、第2ボルト及び第2ナットにより基材に連結され、基材との間で周囲の屋根の一部を挟み込む第2挟み込み板とを備える。【選択図】図1
ROOF WALL MATERIAL AND INSTALLATION METHOD OF ROOF WALL MATERIAL
To provide roof wall material and an installation method of the roof wall material eliminating removal of indoor facilities and the like upon work and capable of operating the indoor facilities during a work period.SOLUTION: The roof wall material is provided with: a plate-like substrate; a first sandwich plate sandwiching a part of a roof between the substrate and itself, which is installed on a first end part at one side in a specific direction of a first surface of the substrate, and connected on the substrate with a first bolt and a first nut; and a second sandwich plate sandwiching a part of a surrounding roof between the substrate and itself, installed on a second end part side of the other side in a specific direction of a second surface of a rear surface side of the first surface of the substrate apart from the second end part and connected on the substrate with a second bolt and a second nut.SELECTED DRAWING: Figure 1
【課題】作業を行う際に屋内設備等を撤去する必要が無く、作業期間において屋内設備を稼働することが可能な屋根壁材及び屋根壁材の設定方法を提供する。【解決手段】屋根壁材は、板状の基材と、基材の第1面のうち所定方向の一方側の第1端部に配置され、第1ボルト及び第1ナットにより基材に連結され、基材との間で屋根の一部を挟み込む第1挟み込み板と、基材の第1面の裏面側である第2面のうち所定方向の他方側の第2端部側に当該第2端部とは間隔を空けて配置され、第2ボルト及び第2ナットにより基材に連結され、基材との間で周囲の屋根の一部を挟み込む第2挟み込み板とを備える。【選択図】図1
ROOF WALL MATERIAL AND INSTALLATION METHOD OF ROOF WALL MATERIAL
屋根壁材及び屋根壁材の設置方法
YAMASHIRO TAKANORI (author) / SUGIURA ATSUSHI (author) / SHIBATA MASARU (author)
2024-10-18
Patent
Electronic Resource
Japanese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
European Patent Office | 2022
|