A platform for research: civil engineering, architecture and urbanism
SCAFFOLD DISASSEMBLING METHOD
To provide a scaffold disassembling method which can efficiently disassemble a scaffold while securing safety.SOLUTION: A scaffold disassembling method of a hood scaffold 1 having a plurality of support members 20, and a floor plate 40 which is bridged between the two different support members 20 and is fixed to the support members 20 through bolts 7 inserted into through holes 8 penetrating through themselves and the support members 20 includes: an insertion step of pulling out the bolts 7 from the through holes 8, and inserting pins 80 into the through holes 8 instead of the pulled out bolts 7; a connection step of connecting the pins 80 inserted into the through holes 8 to a suspension tool 9 for suspending the floor plate 40; and a suspension step of operating the suspension tool 9 to suspend the floor plate 40 together with the pins 80, thereby removing the floor plate 40 from the support members 20.SELECTED DRAWING: Figure 6D
【課題】安全性を担保しつつ、効率的に足場を解体できる足場解体方法を提供すること。【解決手段】足場解体方法は、複数の支持部材20と、異なる2つの支持部材20の間に掛け渡され、自身と支持部材20とを貫通する貫通孔8に挿通されているボルト7を介して支持部材20に固定される床板40と、を備える陣笠足場1の足場解体方法であって、貫通孔8からボルト7を抜き、抜いたボルト7の代わりに該貫通孔8にピン80を挿入する挿入工程と、床板40を吊り上げる吊り上げ具9に貫通孔8に挿入したピン80を連結させる連結工程と、吊り上げ具9を操作してピン80とともに床板40を吊り上げることで支持部材20から床板40を取り外す吊上工程と、を含む。【選択図】図6D
SCAFFOLD DISASSEMBLING METHOD
To provide a scaffold disassembling method which can efficiently disassemble a scaffold while securing safety.SOLUTION: A scaffold disassembling method of a hood scaffold 1 having a plurality of support members 20, and a floor plate 40 which is bridged between the two different support members 20 and is fixed to the support members 20 through bolts 7 inserted into through holes 8 penetrating through themselves and the support members 20 includes: an insertion step of pulling out the bolts 7 from the through holes 8, and inserting pins 80 into the through holes 8 instead of the pulled out bolts 7; a connection step of connecting the pins 80 inserted into the through holes 8 to a suspension tool 9 for suspending the floor plate 40; and a suspension step of operating the suspension tool 9 to suspend the floor plate 40 together with the pins 80, thereby removing the floor plate 40 from the support members 20.SELECTED DRAWING: Figure 6D
【課題】安全性を担保しつつ、効率的に足場を解体できる足場解体方法を提供すること。【解決手段】足場解体方法は、複数の支持部材20と、異なる2つの支持部材20の間に掛け渡され、自身と支持部材20とを貫通する貫通孔8に挿通されているボルト7を介して支持部材20に固定される床板40と、を備える陣笠足場1の足場解体方法であって、貫通孔8からボルト7を抜き、抜いたボルト7の代わりに該貫通孔8にピン80を挿入する挿入工程と、床板40を吊り上げる吊り上げ具9に貫通孔8に挿入したピン80を連結させる連結工程と、吊り上げ具9を操作してピン80とともに床板40を吊り上げることで支持部材20から床板40を取り外す吊上工程と、を含む。【選択図】図6D
SCAFFOLD DISASSEMBLING METHOD
足場解体方法
TANGE HIROSHI (author) / HARANO MITSUO (author)
2024-11-28
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Fabricated scaffold and assembling and disassembling method thereof
European Patent Office | 2023
|Connecting component facilitating assembling and disassembling of scaffold
European Patent Office | 2015
|Method for erecting and disassembling scaffold for single-pile conical section
European Patent Office | 2021
|