PRECAST BRIDGE CONSTRUCTION METHOD USING PILE AND PRECAST COPING
The present invention relates to a precast bridge construction method using piles and precast coping parts, allowing the piles to be installed in a stream or a sea and allowing the precast coping parts and girders to be simply and continuously constructed on head parts of the piles. The precast bridge construction method comprises: (a) a step of partially constructing the piles having each precast bracket installed on the upper end of a bridge start part in the direction of the bridge being extended; (b) a step of inserting and installing each coping part on the upper surface of the precast bracket installed on the upper end of each pile constructed from the bridge start point, the coping part having a pile head supporter formed on a center of a pile insertion groove; the pile head supporter having a supported lower surface; (c) a step of installing girders to be in contact in a transverse direction in order to form a point part in such a manner that ends of the girders are spaced from each other and supported between upper surfaces of the installed coping parts; (d) a step of installing temporary bottom plates on upper surfaces of the installed girders, installing temporary point part grid bottom surfaces on the upper part of the point part between the temporary bottom plates, and installing piles, precast coping parts, and girders to be constructed by a lift device moving on upper surfaces of the temporary bottom surfaces and the temporary point part grid bottom surfaces; and (e) a step of placing concrete for the point part and a slab to the point part positioned between the precast coping part and the both girders and to upper surfaces of the installed girders.
하천, 해상에 있어 파일을 설치하고, 파일 두부에 프리캐스트코핑부와 거더를 간단하게 연속적으로 시공할 수 있는 파일과 프리캐스트코핑부를 이용한 급속 교량 시공방법에 관한 것으로서, 상기 시공방법은 (a) 교량시점부에서 상단에 프리캐스트 브라켓이 설치된 파일을 교량연장방향으로 일부 시공하고, (b) 교량시점부로부터 시공된 파일 상단의 프리캐스트 브라켓의 상면에 저면이 지지되는 파일두부지지대가 파일삽입홈 중간에 형성된 프리캐스트 코핑부를 각각 삽입설치하고, (c) 상기 삽입 설치된 프리캐스트 코핑부 상면 사이에 거더의 양 단부가 서로 이격되어 지지되어 지점부가 형성되도록 거치하되 거더가 횡방향으로 서로 접하도록 설치하고, (d) 상기 설치된 거더 상면에 임시바닥판을 설치함과 더불어 임시바닥판 사이의 지점부 상부에 위치하는 임시지점부 격자바닥판을 함께 설치하여 인양장치가 상기 임시바닥판과 임시지점부 격자바닥판 상면을 이동하면서 추가로 시공되어야 할 파일, 프리캐스트 코핑부 및 거더를 설치하고, (e) 상기 프리캐스트 코핑부와 양 거더가 거치된 사이의 지점부와 설치된 거더 상면에 지점부 및 슬래브콘크리트를 타설하는 단계를 포함한다.
PRECAST BRIDGE CONSTRUCTION METHOD USING PILE AND PRECAST COPING
The present invention relates to a precast bridge construction method using piles and precast coping parts, allowing the piles to be installed in a stream or a sea and allowing the precast coping parts and girders to be simply and continuously constructed on head parts of the piles. The precast bridge construction method comprises: (a) a step of partially constructing the piles having each precast bracket installed on the upper end of a bridge start part in the direction of the bridge being extended; (b) a step of inserting and installing each coping part on the upper surface of the precast bracket installed on the upper end of each pile constructed from the bridge start point, the coping part having a pile head supporter formed on a center of a pile insertion groove; the pile head supporter having a supported lower surface; (c) a step of installing girders to be in contact in a transverse direction in order to form a point part in such a manner that ends of the girders are spaced from each other and supported between upper surfaces of the installed coping parts; (d) a step of installing temporary bottom plates on upper surfaces of the installed girders, installing temporary point part grid bottom surfaces on the upper part of the point part between the temporary bottom plates, and installing piles, precast coping parts, and girders to be constructed by a lift device moving on upper surfaces of the temporary bottom surfaces and the temporary point part grid bottom surfaces; and (e) a step of placing concrete for the point part and a slab to the point part positioned between the precast coping part and the both girders and to upper surfaces of the installed girders.
하천, 해상에 있어 파일을 설치하고, 파일 두부에 프리캐스트코핑부와 거더를 간단하게 연속적으로 시공할 수 있는 파일과 프리캐스트코핑부를 이용한 급속 교량 시공방법에 관한 것으로서, 상기 시공방법은 (a) 교량시점부에서 상단에 프리캐스트 브라켓이 설치된 파일을 교량연장방향으로 일부 시공하고, (b) 교량시점부로부터 시공된 파일 상단의 프리캐스트 브라켓의 상면에 저면이 지지되는 파일두부지지대가 파일삽입홈 중간에 형성된 프리캐스트 코핑부를 각각 삽입설치하고, (c) 상기 삽입 설치된 프리캐스트 코핑부 상면 사이에 거더의 양 단부가 서로 이격되어 지지되어 지점부가 형성되도록 거치하되 거더가 횡방향으로 서로 접하도록 설치하고, (d) 상기 설치된 거더 상면에 임시바닥판을 설치함과 더불어 임시바닥판 사이의 지점부 상부에 위치하는 임시지점부 격자바닥판을 함께 설치하여 인양장치가 상기 임시바닥판과 임시지점부 격자바닥판 상면을 이동하면서 추가로 시공되어야 할 파일, 프리캐스트 코핑부 및 거더를 설치하고, (e) 상기 프리캐스트 코핑부와 양 거더가 거치된 사이의 지점부와 설치된 거더 상면에 지점부 및 슬래브콘크리트를 타설하는 단계를 포함한다.
PRECAST BRIDGE CONSTRUCTION METHOD USING PILE AND PRECAST COPING
파일과 프리캐스트코핑부를 이용한 급속 교량 시공방법
SHIM TAE MOO (author) / CHO SANG KYU (author)
2015-10-14
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Precast pile construction method and precast pile construction equipment
European Patent Office | 2021
|Precast coping construction method using anchorage of pile head
European Patent Office | 2021
|Precast pile with pile cap and construction method of precast pile
European Patent Office | 2023
|Construction method of precast pile foundation and precast pile foundation
European Patent Office | 2024
|