A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR REPLACING BRIDGE BEARING WITHOUT DAMAGING OF LOWER STRUCTURE
The present invention relates to a bridge bearing constructed between a lower structure and an upper structure of a bridge. In case a deteriorating existing bridge bearing is replaced with a new bridge bearing, a side reinforcing plate and a side anchor bolt are installed on both surfaces of a coping unit of the lower structure. The new bridge bearing is not jointed with an existing anchor bolt and is jointed with a bearing upper plate. So, the construction of the new bridge bearing without concrete breaking in an existing method is possible. Also, the new bridge bearing is replaced without concrete curing and the concrete breaking such that construction periods can be shortened and installation processes in a site can be minimized. Moreover, the bearing upper plate, which is a reinforcing material manufactured in advance in a factory, is used for the replacement of the new bridge bearing to enable an installation work to be carried out. Therefore, the replacement of the new bridge bearing and reinforcement of the coping unit can be performed at the same time.
교량의 하부구조물 및 상부구조물 사이에 설치되는 교량받침에 있어서, 열화된 기존 교량받침을 신규 교량받침으로 교체할 경우, 측면 보강판 및 측면 앵커볼트를 하부구조물 코핑부 양 측면에 설치하고, 신규 교량받침을 기존의 앵커볼트와 접합시키지 않고 지압 상판과 접합시킴으로써 기존의 콘크리트 깨기 없이 신규 교량받침의 설치가 가능하며, 또한, 콘크리트 깨기와 콘크리트 양생 없이 신규 교량받침을 교체함으로써 공기를 단축시킬 수 있고, 현장에서의 설치 공정을 최소화할 수 있으며, 또한, 신규 교량받침의 교체시 공장에서 사전에 제작된 보강재인 지압 상판을 이용하여 설치작업을 진행함으로써 신규 교량받침의 교체와 동시에 별도의 작업 없이 코핑부 보강이 가능한, 하부구조물의 손상 없이 교량받침을 교체하는 공법이 제공된다.
CONSTRUCTION METHOD FOR REPLACING BRIDGE BEARING WITHOUT DAMAGING OF LOWER STRUCTURE
The present invention relates to a bridge bearing constructed between a lower structure and an upper structure of a bridge. In case a deteriorating existing bridge bearing is replaced with a new bridge bearing, a side reinforcing plate and a side anchor bolt are installed on both surfaces of a coping unit of the lower structure. The new bridge bearing is not jointed with an existing anchor bolt and is jointed with a bearing upper plate. So, the construction of the new bridge bearing without concrete breaking in an existing method is possible. Also, the new bridge bearing is replaced without concrete curing and the concrete breaking such that construction periods can be shortened and installation processes in a site can be minimized. Moreover, the bearing upper plate, which is a reinforcing material manufactured in advance in a factory, is used for the replacement of the new bridge bearing to enable an installation work to be carried out. Therefore, the replacement of the new bridge bearing and reinforcement of the coping unit can be performed at the same time.
교량의 하부구조물 및 상부구조물 사이에 설치되는 교량받침에 있어서, 열화된 기존 교량받침을 신규 교량받침으로 교체할 경우, 측면 보강판 및 측면 앵커볼트를 하부구조물 코핑부 양 측면에 설치하고, 신규 교량받침을 기존의 앵커볼트와 접합시키지 않고 지압 상판과 접합시킴으로써 기존의 콘크리트 깨기 없이 신규 교량받침의 설치가 가능하며, 또한, 콘크리트 깨기와 콘크리트 양생 없이 신규 교량받침을 교체함으로써 공기를 단축시킬 수 있고, 현장에서의 설치 공정을 최소화할 수 있으며, 또한, 신규 교량받침의 교체시 공장에서 사전에 제작된 보강재인 지압 상판을 이용하여 설치작업을 진행함으로써 신규 교량받침의 교체와 동시에 별도의 작업 없이 코핑부 보강이 가능한, 하부구조물의 손상 없이 교량받침을 교체하는 공법이 제공된다.
CONSTRUCTION METHOD FOR REPLACING BRIDGE BEARING WITHOUT DAMAGING OF LOWER STRUCTURE
하부구조물의 손상 없이 교량받침을 교체하는 공법
JEON SEONG HO (author) / KONG CHUN SUK (author) / LEE YOUNG JOO (author)
2015-11-02
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Method of Replacing Bearing for Bridge and Bearing Structure
European Patent Office | 2020
Method of Replacing Bearing for Bridge and Bearing Structure
European Patent Office | 2019
|Wall bearing replacing device and wall bearing replacing construction method
European Patent Office | 2020
|