A platform for research: civil engineering, architecture and urbanism
A Top Down Method of deploying Underground Structures
The present invention relates to a method for constructing an underground structure using a top-down construction method and, more specifically, relates to a method for constructing an underground structure using a top-down construction method capable of rapidly executing a construction by executing a construction for installing a ground structure on the ground and a construction for installing the underground structure underground at the same time. The method for constructing the underground structure using the top-down construction method includes: (1) a step of flattening the ground; (2) a step of forming a frame structure (100) having columns and beams on the flat ground; (3) a step of connecting a central column (210) of an underground floor to the central column of the frame structure (100); (4) a step of connecting outer columns (220) of the underground floor to the outer columns of the frame structure (100); (5) a step of forming a retaining wall connection unit (300); (6) a step of forming a retaining wall (400); (7) a step of waterproofing an inner surface (inner parts of a building) of the retaining wall (400) by connecting a waterproof fabric; and (8) a step of forming an outer wall of the underground floor.
본 발명은 탑다운 공법의 지하구조물 구축방법에 관한 것으로서, 보다 상세하게는, 해당 부지의 지면을 경계로 하여 지상에는 지상구조부 공사를 진행함과 동시에, 그 경계 하부의 지중에는 지하구조부 공사를전체적인 건축공사를 신속하게 진행시킬 수 있도록 한 탑다운 공법의 지하구조물 구축방법에 있어서, (1) 해당 부지의 지면을 평탄화 하는 평탄화단계; (2) 상기 단계(1)에서 평탄화 된 지면의 지상에 기둥과 보를 가지는 틀구조체(100)를 형성하는 단계; (3) 상기 단계(2)에서 형성된 틀구조체(100) 중앙부 기둥의 하부 지반을 하방향으로 굴착하여 중앙부 지하층 기둥(210)을 상기 틀구조체(100)의 중앙부 기둥에 연결하는 단계; (4) 상기 단계(2)에서 형성된 틀구조체(100)의 외곽 기둥 각각의 하부 지반을 하방향으로 순차적으로 굴착하여을 상기 틀구조체(100)의 외곽 기둥과 연결하는 단계; (5) 상기 단계(4)에서 형성된과 플레이트를 연결하여 흙막이벽연결부(300)를 형성하는 단계; (6) 상기 단계(5)에서 형성된 흙막이벽연결부(300)를 외부측 플레이트로 연결하여 흙막이벽(400)을 형성하는 단계; (7) 상기 단계(6)에서 형성된 흙막이벽(400)의방수포를 연결하여 방수하는 단계; 및 (8) 상기 단계(7)의 방수단계가 종료된 흙막이벽(400)의측에 철근을 배근 하고, 배근된 철근을 덮는 내부측 플레이트를, 상기상기 내부측 플레이트 사이의 철근이 배근된 공간에 콘크리트를 타설하여 지하층 외벽을 형성하는 단계;를 포함한다. 본 발명에 의한 탑다운 공법의 지하구조물 구축방법은 다음과 같은 효과가 있다.첫째, 종래 합성벽체와 지층슬라브 자중에 의한 무리한 수직하중을 받게되는 합성기둥이 좌굴되거나 침하되어 지하구조부 시공중에 붕괴사고가 발생될 염려가 있는 문제점이 있었으나, 본 발명은 구조적으로 필요한 기둥이 시공 초기부터 존재하므로 종래 무리한 하중에 의한 합성기둥의 붕괴사고 발생 위험을 방지할 수 있다.둘째, 지반의 하방향으로 플레이트 세로 폭만큼 굴착한 후 연결하는 방식의 흙막이벽 설치를 통해 굴토작업량을 줄일 수 있으므로, 그에 따른 공사 비용과 시공시간을 절약할 수 있어 효율적이다.셋째, 기둥의 연결작업 각각마다 수직도를 판단할 수 있어 설계면적 내부로 침범함으로써 발생하는 지하공간의 협소 문제점을 배제할 수 있다.넷째, 종래의 굴착기(포크레인)를 이용하여 기둥 연결과 흙막이벽 설치를 위한 굴착이 가능하므로 깊은 굴착을 위한 별도의 장비가 필요치 않아 그 비용과 장비동원 측면에서 효율적이다.다섯째, 지하층 기둥과 흙막이벽을 일체화 하고, 흙막이벽을 외벽의 외면으로 하면서, 내부에 철근 배근과 콘크리트 양생으로 외벽과 지하층 기둥을 일체화 할 수 있어 구조적 안정을 기할 수 있다.
A Top Down Method of deploying Underground Structures
The present invention relates to a method for constructing an underground structure using a top-down construction method and, more specifically, relates to a method for constructing an underground structure using a top-down construction method capable of rapidly executing a construction by executing a construction for installing a ground structure on the ground and a construction for installing the underground structure underground at the same time. The method for constructing the underground structure using the top-down construction method includes: (1) a step of flattening the ground; (2) a step of forming a frame structure (100) having columns and beams on the flat ground; (3) a step of connecting a central column (210) of an underground floor to the central column of the frame structure (100); (4) a step of connecting outer columns (220) of the underground floor to the outer columns of the frame structure (100); (5) a step of forming a retaining wall connection unit (300); (6) a step of forming a retaining wall (400); (7) a step of waterproofing an inner surface (inner parts of a building) of the retaining wall (400) by connecting a waterproof fabric; and (8) a step of forming an outer wall of the underground floor.
본 발명은 탑다운 공법의 지하구조물 구축방법에 관한 것으로서, 보다 상세하게는, 해당 부지의 지면을 경계로 하여 지상에는 지상구조부 공사를 진행함과 동시에, 그 경계 하부의 지중에는 지하구조부 공사를전체적인 건축공사를 신속하게 진행시킬 수 있도록 한 탑다운 공법의 지하구조물 구축방법에 있어서, (1) 해당 부지의 지면을 평탄화 하는 평탄화단계; (2) 상기 단계(1)에서 평탄화 된 지면의 지상에 기둥과 보를 가지는 틀구조체(100)를 형성하는 단계; (3) 상기 단계(2)에서 형성된 틀구조체(100) 중앙부 기둥의 하부 지반을 하방향으로 굴착하여 중앙부 지하층 기둥(210)을 상기 틀구조체(100)의 중앙부 기둥에 연결하는 단계; (4) 상기 단계(2)에서 형성된 틀구조체(100)의 외곽 기둥 각각의 하부 지반을 하방향으로 순차적으로 굴착하여을 상기 틀구조체(100)의 외곽 기둥과 연결하는 단계; (5) 상기 단계(4)에서 형성된과 플레이트를 연결하여 흙막이벽연결부(300)를 형성하는 단계; (6) 상기 단계(5)에서 형성된 흙막이벽연결부(300)를 외부측 플레이트로 연결하여 흙막이벽(400)을 형성하는 단계; (7) 상기 단계(6)에서 형성된 흙막이벽(400)의방수포를 연결하여 방수하는 단계; 및 (8) 상기 단계(7)의 방수단계가 종료된 흙막이벽(400)의측에 철근을 배근 하고, 배근된 철근을 덮는 내부측 플레이트를, 상기상기 내부측 플레이트 사이의 철근이 배근된 공간에 콘크리트를 타설하여 지하층 외벽을 형성하는 단계;를 포함한다. 본 발명에 의한 탑다운 공법의 지하구조물 구축방법은 다음과 같은 효과가 있다.첫째, 종래 합성벽체와 지층슬라브 자중에 의한 무리한 수직하중을 받게되는 합성기둥이 좌굴되거나 침하되어 지하구조부 시공중에 붕괴사고가 발생될 염려가 있는 문제점이 있었으나, 본 발명은 구조적으로 필요한 기둥이 시공 초기부터 존재하므로 종래 무리한 하중에 의한 합성기둥의 붕괴사고 발생 위험을 방지할 수 있다.둘째, 지반의 하방향으로 플레이트 세로 폭만큼 굴착한 후 연결하는 방식의 흙막이벽 설치를 통해 굴토작업량을 줄일 수 있으므로, 그에 따른 공사 비용과 시공시간을 절약할 수 있어 효율적이다.셋째, 기둥의 연결작업 각각마다 수직도를 판단할 수 있어 설계면적 내부로 침범함으로써 발생하는 지하공간의 협소 문제점을 배제할 수 있다.넷째, 종래의 굴착기(포크레인)를 이용하여 기둥 연결과 흙막이벽 설치를 위한 굴착이 가능하므로 깊은 굴착을 위한 별도의 장비가 필요치 않아 그 비용과 장비동원 측면에서 효율적이다.다섯째, 지하층 기둥과 흙막이벽을 일체화 하고, 흙막이벽을 외벽의 외면으로 하면서, 내부에 철근 배근과 콘크리트 양생으로 외벽과 지하층 기둥을 일체화 할 수 있어 구조적 안정을 기할 수 있다.
A Top Down Method of deploying Underground Structures
탑다운 공법의 지하구조물 구축방법
LEE HAI RANG (author) / KIM TAE JIN (author)
2017-09-28
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
PARTIAL TOP-DOWN CONSTRUCTION METHOD FOR BUILDING UNDERGROUND STRUCTURES
European Patent Office | 2016
|Structural Optimization of Deploying Structures Composed of Linkages
British Library Online Contents | 2014
|