A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE WALL
The present invention relates to a construction method of an underground structure wall and, specifically, to a construction method of an underground structure wall, which forms an insertion hole in a ground and installs a plurality of panels in the ground in a continuous manner to construct an underground structure wall of an underground roadway or the like. According to the present invention, the construction method, which is a method for constructing a wall of an underground structure by continuously installing a plurality of panels in a ground, comprises: a step of forming guide walls separated from each other on the ground; a step of forming an insertion hole by excavating a gap between the guide walls separated from each other; a step of inserting a support plate along both inner walls of the insertion hole; a step of further inserting the support plate downward after further excavating the lower part of the insertion hole; a step of inserting and connecting multiple panels into the insertion hole through a space between the facing support plates; a step of placing concrete in a space formed between the panels connected to each other; a step of filling a filling material between the panel and the support plate or between the inner wall of the insertion hole and the support plate; and a step of removing the support plate from the insertion hole.
본 발명은 지하구조물 벽체의 시공방법에 관한 것으로서, 특히 지면에 근입공을 형성하고 여기에 다수개의 패널을 지중에 연속으로 설치하여 지하차도 등의 지하구조물 벽체를 시공하는 지하구조물 벽체의 시공방법에 관한 것이다. 본 발명의 지하구조물 벽체의 시공방법은, 다수개의 패널을 지중에 연속으로 설치하여 지하구조물의 벽체를 시공하는 방법에 있어서, 지면에 상호 이격된 안내벽을 형성하는 단계와; 상호 이격되어 있는 상기 안내벽 사이를 굴착하여 근입공을 형성하는 단계와; 상기 근입공의 양쪽 내측벽을 따라 지지판을 삽입하는 단계와; 상기 근입공의 하부를 더 굴착한 후 상기 지지판을 하방향으로 더 삽입하는 단계와; 마주보는 상기 지지판 사이를 통해 상기 근입공에 다수개의 패널을 삽입하여 연결하는 단계와; 상호 연결된 다수개의 패널 사이에 형성된 공간에 콘크리트를 타설하는 단계와; 상기 패널과 지지판 사이 또는 상기 지지판과 근입공의 내측벽 사이에 메움재를 채우는 단계와; 상기 지지판을 상기 근입공으로부터 제거하는 단계;를 포함하여 이루어진다.
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE WALL
The present invention relates to a construction method of an underground structure wall and, specifically, to a construction method of an underground structure wall, which forms an insertion hole in a ground and installs a plurality of panels in the ground in a continuous manner to construct an underground structure wall of an underground roadway or the like. According to the present invention, the construction method, which is a method for constructing a wall of an underground structure by continuously installing a plurality of panels in a ground, comprises: a step of forming guide walls separated from each other on the ground; a step of forming an insertion hole by excavating a gap between the guide walls separated from each other; a step of inserting a support plate along both inner walls of the insertion hole; a step of further inserting the support plate downward after further excavating the lower part of the insertion hole; a step of inserting and connecting multiple panels into the insertion hole through a space between the facing support plates; a step of placing concrete in a space formed between the panels connected to each other; a step of filling a filling material between the panel and the support plate or between the inner wall of the insertion hole and the support plate; and a step of removing the support plate from the insertion hole.
본 발명은 지하구조물 벽체의 시공방법에 관한 것으로서, 특히 지면에 근입공을 형성하고 여기에 다수개의 패널을 지중에 연속으로 설치하여 지하차도 등의 지하구조물 벽체를 시공하는 지하구조물 벽체의 시공방법에 관한 것이다. 본 발명의 지하구조물 벽체의 시공방법은, 다수개의 패널을 지중에 연속으로 설치하여 지하구조물의 벽체를 시공하는 방법에 있어서, 지면에 상호 이격된 안내벽을 형성하는 단계와; 상호 이격되어 있는 상기 안내벽 사이를 굴착하여 근입공을 형성하는 단계와; 상기 근입공의 양쪽 내측벽을 따라 지지판을 삽입하는 단계와; 상기 근입공의 하부를 더 굴착한 후 상기 지지판을 하방향으로 더 삽입하는 단계와; 마주보는 상기 지지판 사이를 통해 상기 근입공에 다수개의 패널을 삽입하여 연결하는 단계와; 상호 연결된 다수개의 패널 사이에 형성된 공간에 콘크리트를 타설하는 단계와; 상기 패널과 지지판 사이 또는 상기 지지판과 근입공의 내측벽 사이에 메움재를 채우는 단계와; 상기 지지판을 상기 근입공으로부터 제거하는 단계;를 포함하여 이루어진다.
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE WALL
지하구조물 벽체의 시공방법
YOON HAK SU (author)
2018-07-16
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE WALL AND UNDERGROUND STRUCTURE
European Patent Office | 2018
|European Patent Office | 2020
|Underground structure construction method using existing underground diaphragm wall
European Patent Office | 2024
|