CONSTRUCTION METHOD FOR UNDERGROUND WATERTIGHT WALL
The present invention relates to a method to construct an underground cutoff wall, capable of completely blocking water with respect to a water passing part between a sub wall and a main wall. According to the present invention, the method to construct an underground cutoff wall comprises: a main casing preparation step; a sub casing preparation step; a sub through-hole perforation step; a temporary main casing installation step of temporarily installing a main casing in a sub through-hole (2); a sub casing insertion step of inserting and installing a sub casing in the main casing; a sub casing outer side filling step of filling a cutoff material in a space between the main and sub casings, wherein a first cutoff material filling part (3) is formed outside the front and rear sides of the sub casing; a temporary main casing removing step; a sub wall forming step of depositing concrete in the sub casing to form a sub wall; a sub casing removing step; a main through-hole perforation step; a main casing installation step of installing the main casing in a main through-hole; and a main wall forming step of depositing concrete in the main casing to form a main wall, and removing the main casing to block the water passing part between the sub and main walls with the first cutoff material filling part (3).
본 발명은 복수의 주케이싱(100) 및 복수의 보조케이싱(200)을 번갈아 설치하여 지중 차수벽을 형성하는 지중 차수벽 시공방법에 관한 것으로서, 원통형 구조인 상기 주케이싱(100)을 준비하는 주케이싱 준비단계; 인접하여 설치되는 상기 주케이싱(100)과의 저촉을 방지하도록 상기 보조케이싱(200)의 양측에 홈부(210)가 형성되고, 상기 보조케이싱(200)의 전후방을 둘러 제1 차수재 충전부(3)가 형성되도록, 상기 보조케이싱(200)의 전후방향의 외경이 상기 주케이싱(100)의 내경에 비해 작게 형성된 상기 보조케이싱(200)을 준비하는 보조케이싱 준비단계; 상기 보조케이싱(200)이 설치될 지반을 천공하여 보조천공홀(2)을 형성하는 보조천공홀 천공단계; 상기 주케이싱(100)을 임시로 상기 보조천공홀(2)에 설치하는 임시 주케이싱 설치단계; 상기 주케이싱(100) 내부에 상기 보조케이싱(200)을 삽입하여 설치하는 보조케이싱 삽입단계; 상기 주케이싱(100)과 상기 보조케이싱(200)의 사이공간을 차수재에 의해 충전하되, 상기 보조케이싱(200)의 전후방 외측에 상기 제1 차수재 충전부(3)가 형성되도록 하는 보조케이싱 외부 충전단계; 상기 제1 차수재 충전부(3)의 차수재가 굳기 전, 상기 주케이싱(100)을 제거하는 임시 주케이싱 제거단계; 상기 보조케이싱(200) 내부에 콘크리트를 타설하여 보조벽체(20)를 형성하는 보조벽체 형성단계; 상기 보조벽체 콘크리트가 굳기 전, 상기 보조케이싱(200)을 제거하는 보조케이싱 제거단계; 상기 복수의 보조벽체(20)의 사이 영역을 천공하되, 상기 보조벽체(20)의 홈부(21)에 충전된 차수재가 굴착되도록 하여, 상기 주케이싱(100)이 설치될 주천공홀(1)을 형성하는 주천공홀 천공단계; 상기 주천공홀(1)에 상기 주케이싱(100)을 설치하는 주케이싱 설치단계; 상기 주케이싱(100) 내부에 콘크리트를 타설하여 주벽체(10)를 형성하고, 상기 주케이싱(100)을 제거하여, 상기 보조벽체(20)와 상기 주벽체(10) 사이의 통수부(a)가 상기 제1 차수재 충전부(3)에 의해 폐쇄되도록 하는 주벽체 형성단계;를 포함하는 것을 특징으로 하는 지중 차수벽 시공방법을 제시함으로써, 보조벽체와 주벽체 사이의 통수부에 대한 완전한 차수를 가능하게 한다.
CONSTRUCTION METHOD FOR UNDERGROUND WATERTIGHT WALL
The present invention relates to a method to construct an underground cutoff wall, capable of completely blocking water with respect to a water passing part between a sub wall and a main wall. According to the present invention, the method to construct an underground cutoff wall comprises: a main casing preparation step; a sub casing preparation step; a sub through-hole perforation step; a temporary main casing installation step of temporarily installing a main casing in a sub through-hole (2); a sub casing insertion step of inserting and installing a sub casing in the main casing; a sub casing outer side filling step of filling a cutoff material in a space between the main and sub casings, wherein a first cutoff material filling part (3) is formed outside the front and rear sides of the sub casing; a temporary main casing removing step; a sub wall forming step of depositing concrete in the sub casing to form a sub wall; a sub casing removing step; a main through-hole perforation step; a main casing installation step of installing the main casing in a main through-hole; and a main wall forming step of depositing concrete in the main casing to form a main wall, and removing the main casing to block the water passing part between the sub and main walls with the first cutoff material filling part (3).
본 발명은 복수의 주케이싱(100) 및 복수의 보조케이싱(200)을 번갈아 설치하여 지중 차수벽을 형성하는 지중 차수벽 시공방법에 관한 것으로서, 원통형 구조인 상기 주케이싱(100)을 준비하는 주케이싱 준비단계; 인접하여 설치되는 상기 주케이싱(100)과의 저촉을 방지하도록 상기 보조케이싱(200)의 양측에 홈부(210)가 형성되고, 상기 보조케이싱(200)의 전후방을 둘러 제1 차수재 충전부(3)가 형성되도록, 상기 보조케이싱(200)의 전후방향의 외경이 상기 주케이싱(100)의 내경에 비해 작게 형성된 상기 보조케이싱(200)을 준비하는 보조케이싱 준비단계; 상기 보조케이싱(200)이 설치될 지반을 천공하여 보조천공홀(2)을 형성하는 보조천공홀 천공단계; 상기 주케이싱(100)을 임시로 상기 보조천공홀(2)에 설치하는 임시 주케이싱 설치단계; 상기 주케이싱(100) 내부에 상기 보조케이싱(200)을 삽입하여 설치하는 보조케이싱 삽입단계; 상기 주케이싱(100)과 상기 보조케이싱(200)의 사이공간을 차수재에 의해 충전하되, 상기 보조케이싱(200)의 전후방 외측에 상기 제1 차수재 충전부(3)가 형성되도록 하는 보조케이싱 외부 충전단계; 상기 제1 차수재 충전부(3)의 차수재가 굳기 전, 상기 주케이싱(100)을 제거하는 임시 주케이싱 제거단계; 상기 보조케이싱(200) 내부에 콘크리트를 타설하여 보조벽체(20)를 형성하는 보조벽체 형성단계; 상기 보조벽체 콘크리트가 굳기 전, 상기 보조케이싱(200)을 제거하는 보조케이싱 제거단계; 상기 복수의 보조벽체(20)의 사이 영역을 천공하되, 상기 보조벽체(20)의 홈부(21)에 충전된 차수재가 굴착되도록 하여, 상기 주케이싱(100)이 설치될 주천공홀(1)을 형성하는 주천공홀 천공단계; 상기 주천공홀(1)에 상기 주케이싱(100)을 설치하는 주케이싱 설치단계; 상기 주케이싱(100) 내부에 콘크리트를 타설하여 주벽체(10)를 형성하고, 상기 주케이싱(100)을 제거하여, 상기 보조벽체(20)와 상기 주벽체(10) 사이의 통수부(a)가 상기 제1 차수재 충전부(3)에 의해 폐쇄되도록 하는 주벽체 형성단계;를 포함하는 것을 특징으로 하는 지중 차수벽 시공방법을 제시함으로써, 보조벽체와 주벽체 사이의 통수부에 대한 완전한 차수를 가능하게 한다.
CONSTRUCTION METHOD FOR UNDERGROUND WATERTIGHT WALL
지중 차수벽 시공방법
PARK JEONG TAE (author)
2018-08-20
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction equipment and construction method of underground watertight wall
European Patent Office | 2017
|underground watertight wall construction method for prevention of brittle fracture
European Patent Office | 2025
PRECAST PILE AND CONSTRUCTION METHOD FOR UNDERGROUND WATERTIGHT WALL USING THE SAME
European Patent Office | 2020
|