PRECAST PILE AND CONSTRUCTION METHOD FOR UNDERGROUND WATERTIGHT WALL USING THE SAME
The present invention provides a precast auxiliary pile (20) for constructing an underground cutoff wall and a construction method for an underground cutoff wall using the same, wherein the precast auxiliary pile (20) for constructing an underground cutoff wall includes: a body part (21) manufactured by a precast method and lengthily formed along a vertical direction so as to be embedded in the ground; and groove parts (22) formed on both sides of the body part (21) so as to prevent a collision with cylindrical main piles (10) installed adjacent to both sides. Therefore, the precast auxiliary pile (20) for constructing an underground cutoff wall can use only one kind of casing to have excellent constructability and enable perfect cutoff with respect to a water passing part between the auxiliary pile and the main piles.
본 발명은 프리캐스트 방식에 의해 제조됨과 아울러, 지중에 근입되도록 상하방향을 따라 길게 형성된 몸통부(21); 양측에 인접하여 설치되는 원통형 구조의 주말뚝(10)과의 저촉을 방지하도록, 상기 몸통부(21)의 양측에 형성된 홈부(22);를 포함하는 것을 특징으로 하는 지중 차수벽 시공용 프리캐스트 보조말뚝(20) 및 이를 이용한 지중 차수벽 시공방법을 제시함으로써, 한 종류의 케이싱만을 사용하도록 하여 시공성이 우수하면서도, 보조말뚝와 주말뚝 사이의 통수부에 대한 완전한 차수를 가능하게 한다.
PRECAST PILE AND CONSTRUCTION METHOD FOR UNDERGROUND WATERTIGHT WALL USING THE SAME
The present invention provides a precast auxiliary pile (20) for constructing an underground cutoff wall and a construction method for an underground cutoff wall using the same, wherein the precast auxiliary pile (20) for constructing an underground cutoff wall includes: a body part (21) manufactured by a precast method and lengthily formed along a vertical direction so as to be embedded in the ground; and groove parts (22) formed on both sides of the body part (21) so as to prevent a collision with cylindrical main piles (10) installed adjacent to both sides. Therefore, the precast auxiliary pile (20) for constructing an underground cutoff wall can use only one kind of casing to have excellent constructability and enable perfect cutoff with respect to a water passing part between the auxiliary pile and the main piles.
본 발명은 프리캐스트 방식에 의해 제조됨과 아울러, 지중에 근입되도록 상하방향을 따라 길게 형성된 몸통부(21); 양측에 인접하여 설치되는 원통형 구조의 주말뚝(10)과의 저촉을 방지하도록, 상기 몸통부(21)의 양측에 형성된 홈부(22);를 포함하는 것을 특징으로 하는 지중 차수벽 시공용 프리캐스트 보조말뚝(20) 및 이를 이용한 지중 차수벽 시공방법을 제시함으로써, 한 종류의 케이싱만을 사용하도록 하여 시공성이 우수하면서도, 보조말뚝와 주말뚝 사이의 통수부에 대한 완전한 차수를 가능하게 한다.
PRECAST PILE AND CONSTRUCTION METHOD FOR UNDERGROUND WATERTIGHT WALL USING THE SAME
프리캐스트 보조말뚝 및 이를 이용한 지중 차수벽 시공방법
PARK JEONG TAE (author)
2020-12-07
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2015
|Construction equipment and construction method of underground watertight wall
European Patent Office | 2017
|STEEL PIPE ASSEMBLY AND CONSTRUCTION METHOD FOR UNDERGROUND WATERTIGHT WALL USING THE SAME
European Patent Office | 2024
|