STEEL GIRDER AND MANUFACTURING METHOD THEREOF
Disclosed are a steel girder and a manufacturing method thereof. The steel girder includes: a pair of steel members (100) having upper flanges (110) and abdomen parts (120); a floor beam (200) combined with the steel members so that the abdomen parts (120) are spaced apart from each other; and a retaining member (300) combined with lower surfaces of the steel members (100). The manufacturing method of a steel girder (A) includes: a steel member preparing step of preparing a pair of steel members (100); a floor beam combining step of combining the steel members (100) by a floor beam (200); a precompression load introduction step of introducing a downward precompression load (P) to the steel members (100) combined with each other by the floor beam (200); a restraining member combining step of combining a restraining member (300) with the lower surface of the steel members (100) in the state where the precompression load (P) is introduced; and a precompression load removing step of removing the precompression load (P) and introducing compression power to the restraining member (300). The downward precompression load (P) is applied to the steel member (100), and the restraining member (300) is combined in the state where the precompression load (P) is introduced. After combining the restraining member (300), even though the precompression load (P) is removed, stress generated by the precompression load (P) exists at the steel member (100) and the restraining member (300) by the restraining effect of the restraining member (300). Therefore, the present invention can introduce the precompression load just by the steel girder manufacturing process even though a tension member (a steel strand or a steel bar) is not additionally mounted.
본 발명은 상부플랜지(110)와 복부(120)를 구비한 한 쌍의 강 부재(100); 기 한 쌍의 강 부재(100)의 복부(120)가 상호 이격되도록 결합시키는 가로보(200); 한 쌍의 강 부재(100) 하면에 공통으로 결합되는 구속부재(300);를 포함하는 강재거더(A) 제작방법으로서, 한 쌍의 강 부재(100)를 준비하는 강 부재준비단계; 한 쌍의 강 부재(100)를 가로보(200)로 상호 결합시키는 가로보결합단계; 가로보(200)에 의해 상호 결합된 강 부재(100)에 하향의 선행하중(P)을 도입하는 선행하중 도입단계; 선행하중(P)이 도입된 상태에서 한 쌍의 강 부재(100) 하면에 구속부재(300)를 결합하는 구속부재결합단계; 선행하중(P)을 제거하여 구속부재(300)에 압축력을 도입하는 선행하중 제거단계;를 포함한다.도 6과 같이 강 부재(100)에 하향의 선행하중(P)을 가하고, 선행하중(P)이 도입된 상태에서 도9와 같이 구속부재(300)를 결합한다.구속부재(300) 결합 이후, 선행하중(P)이 제거되어도 구속부재(300)의 구속효과에 의해 선행하중(P)에 의해 발생된 응력이 강 부재(100)와 구속부재(300)에 존재하게 된다.따라서 인장부재(강연선 또는 강봉 등)의 추가적인 설치 없이도, 강재거더 제작공정 만으로 선행하중을 도입할 수 있다.
STEEL GIRDER AND MANUFACTURING METHOD THEREOF
Disclosed are a steel girder and a manufacturing method thereof. The steel girder includes: a pair of steel members (100) having upper flanges (110) and abdomen parts (120); a floor beam (200) combined with the steel members so that the abdomen parts (120) are spaced apart from each other; and a retaining member (300) combined with lower surfaces of the steel members (100). The manufacturing method of a steel girder (A) includes: a steel member preparing step of preparing a pair of steel members (100); a floor beam combining step of combining the steel members (100) by a floor beam (200); a precompression load introduction step of introducing a downward precompression load (P) to the steel members (100) combined with each other by the floor beam (200); a restraining member combining step of combining a restraining member (300) with the lower surface of the steel members (100) in the state where the precompression load (P) is introduced; and a precompression load removing step of removing the precompression load (P) and introducing compression power to the restraining member (300). The downward precompression load (P) is applied to the steel member (100), and the restraining member (300) is combined in the state where the precompression load (P) is introduced. After combining the restraining member (300), even though the precompression load (P) is removed, stress generated by the precompression load (P) exists at the steel member (100) and the restraining member (300) by the restraining effect of the restraining member (300). Therefore, the present invention can introduce the precompression load just by the steel girder manufacturing process even though a tension member (a steel strand or a steel bar) is not additionally mounted.
본 발명은 상부플랜지(110)와 복부(120)를 구비한 한 쌍의 강 부재(100); 기 한 쌍의 강 부재(100)의 복부(120)가 상호 이격되도록 결합시키는 가로보(200); 한 쌍의 강 부재(100) 하면에 공통으로 결합되는 구속부재(300);를 포함하는 강재거더(A) 제작방법으로서, 한 쌍의 강 부재(100)를 준비하는 강 부재준비단계; 한 쌍의 강 부재(100)를 가로보(200)로 상호 결합시키는 가로보결합단계; 가로보(200)에 의해 상호 결합된 강 부재(100)에 하향의 선행하중(P)을 도입하는 선행하중 도입단계; 선행하중(P)이 도입된 상태에서 한 쌍의 강 부재(100) 하면에 구속부재(300)를 결합하는 구속부재결합단계; 선행하중(P)을 제거하여 구속부재(300)에 압축력을 도입하는 선행하중 제거단계;를 포함한다.도 6과 같이 강 부재(100)에 하향의 선행하중(P)을 가하고, 선행하중(P)이 도입된 상태에서 도9와 같이 구속부재(300)를 결합한다.구속부재(300) 결합 이후, 선행하중(P)이 제거되어도 구속부재(300)의 구속효과에 의해 선행하중(P)에 의해 발생된 응력이 강 부재(100)와 구속부재(300)에 존재하게 된다.따라서 인장부재(강연선 또는 강봉 등)의 추가적인 설치 없이도, 강재거더 제작공정 만으로 선행하중을 도입할 수 있다.
STEEL GIRDER AND MANUFACTURING METHOD THEREOF
강재거더 및 그 제작방법
MAH SEONG HO (author)
2019-03-14
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
PRESTRESSED STEEL GIRDER AND MANUFACTURING METHOD THEREOF
European Patent Office | 2018
|preflex steel girder manufacturing apparatus and preflex steel girder manufacturing method
European Patent Office | 2017
|Steel composite Girder and Manufacturing method of girder
European Patent Office | 2018
|