A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF COMPOSITE PRESTRESSED RAHMEN BRIDGE
The present invention relates to a method of constructing a composite prestressed rahmen bridge, capable of forming an optimal cross section for a bridge stand and a girder by applying prestress to the bridge stand and the girder at the same time during the procedure of a rahmen bridge which is strongly coupled with the bridge stand and the girder to which vertical and horizontal loads are applied at the same time. The method includes the following steps of: (S1) manufacturing a girder on a manufacture table; (S2) building a bridge stand; (S3) simply placing the girder on the bridge stand; (S4) applying prestress to the bridge stand and the girder at the same time; strongly coupling the girder with the bridge stand; and (S6) filling the rear side of the bridge stand. A first reaction unit is mounted on the girder manufactured through the S1 step, a second reaction unit is mounted on the bridge stand built through the S2 step, and a gap between the first and second reaction units is opened through an extending unit in the S4 step. Therefore, prestress responding to a vertical load produced by an upper static load and a live load is applied to the girder, and prestress responding to a horizontal load produced by rear earth pressure is applied to the bridge stand.
본 발명은 수직하중과 수평하중이 동시에 작용하는 교대와 거더가 강결합되는 라멘교량의 시공 과정중 프리스트레스를 도입시켜 교대와 거더에 동시에 프리스트레스가 도입되게 함으로써 교대 및 거더에 대한 최적의 단면이 구현될 수 있도록 하는 복합 프리스트레스트 라멘교량의 시공방법에 관한 것으로서, 제작대에서 거더를 제작하는 단계(S1), 교대를 구축하는 단계(S2), 거더를 교대에 단순 거치시키는 단계(S3), 교대와 거더에 프리스트레스를 동시에 도입하는 단계(S4), 거더를 교대에 강결합시키는 단계 및, 교대 배면을 뒷채움하는 단계(S6)가 포함되는 것으로서, 상기 S1단계에서 제작되는 거더에는 제1반력대가 설치되고, S2단계에서 구축되는 교대에는 제2반력대가 설치되며, S4단계에서는 신장수단을 이용하여 제1반력대와 제2반력대 사이를 벌려줌으로써, 거더에는 상부 고정하중 및 활하중에 의한 수직하중에 대응하는 프리스트레스가 도입되고, 교대에는 배면토압에 의한 수평하중에 대응하는 프리스트레스가 도입되도록 한다.
CONSTRUCTION METHOD OF COMPOSITE PRESTRESSED RAHMEN BRIDGE
The present invention relates to a method of constructing a composite prestressed rahmen bridge, capable of forming an optimal cross section for a bridge stand and a girder by applying prestress to the bridge stand and the girder at the same time during the procedure of a rahmen bridge which is strongly coupled with the bridge stand and the girder to which vertical and horizontal loads are applied at the same time. The method includes the following steps of: (S1) manufacturing a girder on a manufacture table; (S2) building a bridge stand; (S3) simply placing the girder on the bridge stand; (S4) applying prestress to the bridge stand and the girder at the same time; strongly coupling the girder with the bridge stand; and (S6) filling the rear side of the bridge stand. A first reaction unit is mounted on the girder manufactured through the S1 step, a second reaction unit is mounted on the bridge stand built through the S2 step, and a gap between the first and second reaction units is opened through an extending unit in the S4 step. Therefore, prestress responding to a vertical load produced by an upper static load and a live load is applied to the girder, and prestress responding to a horizontal load produced by rear earth pressure is applied to the bridge stand.
본 발명은 수직하중과 수평하중이 동시에 작용하는 교대와 거더가 강결합되는 라멘교량의 시공 과정중 프리스트레스를 도입시켜 교대와 거더에 동시에 프리스트레스가 도입되게 함으로써 교대 및 거더에 대한 최적의 단면이 구현될 수 있도록 하는 복합 프리스트레스트 라멘교량의 시공방법에 관한 것으로서, 제작대에서 거더를 제작하는 단계(S1), 교대를 구축하는 단계(S2), 거더를 교대에 단순 거치시키는 단계(S3), 교대와 거더에 프리스트레스를 동시에 도입하는 단계(S4), 거더를 교대에 강결합시키는 단계 및, 교대 배면을 뒷채움하는 단계(S6)가 포함되는 것으로서, 상기 S1단계에서 제작되는 거더에는 제1반력대가 설치되고, S2단계에서 구축되는 교대에는 제2반력대가 설치되며, S4단계에서는 신장수단을 이용하여 제1반력대와 제2반력대 사이를 벌려줌으로써, 거더에는 상부 고정하중 및 활하중에 의한 수직하중에 대응하는 프리스트레스가 도입되고, 교대에는 배면토압에 의한 수평하중에 대응하는 프리스트레스가 도입되도록 한다.
CONSTRUCTION METHOD OF COMPOSITE PRESTRESSED RAHMEN BRIDGE
복합 프리스트레스트 라멘교량의 시공방법
JEONG CHANG HYUN (author) / JEONG DONG JUN (author)
2019-10-08
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Method for construction of prestressed steel-concrete composite rahmen bridge
European Patent Office | 2017
|Prestressed steel composite construction method using the same and Rahmen Bridge
European Patent Office | 2017
|CONSTRUCTION METHOD OF PRESTRESSED COMPOSITE GIRDER BRIDGE
European Patent Office | 2015
Construction method of girder composite rahmen bridge and Girder composite rahmen bridge
European Patent Office | 2019
|CONSTRUCTION METHOD OF PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE
European Patent Office | 2016
|