A platform for research: civil engineering, architecture and urbanism
Earthquake resistant diaphragm wall and method for construction thereof
According to one embodiment of the present invention, a method for constructing an earthquake-proof continuous wall comprises: a first step of preparing a first unit rebar net; a second step of preparing a second unit rebar net; a third step of forming a first build space; a fourth step of preparing a first mold block; a fifth step of arranging the first mold block in the first build space; a sixth step of arranging the first unit rebar net in the first build space; a seventh step of obtaining the first unit block; an eighth step of forming a second build space; a ninth step of enabling a first unit protruding part of the first unit block to be exposed to the outside; a tenth step of preparing a second mold block; an eleventh step of arranging the second mold block in the second build space; a twelfth step of arranging the second unit rebar net in the second build space; and a thirteenth step of pouring concrete into the second build space to obtain the second unit block, wherein the first unit rebar net and the second unit rebar net have at least one region overlapping in the width direction of the ground to be constructed.
본 발명의 일 실시예에 따른 내진 연속벽 시공방법은, 제1 단위철근망을 준비하는 제1 단계, 제2 단위철근망을 준비하는 제2 단계, 제1 빌드공간을 형성하는 제3 단계, 제1 몰드블록을 준비하는 제4 단계, 상기 제1 몰드블록을 상기 제1 빌드공간에 배치하는 제5 단계, 상기 제1 빌드공간에 상기 제1 단위철근망을 배치하는 제6 단계, 상기 제1 단위블록을 획득하는 제7 단계, 제2 빌드공간을 형성하는 제8 단계, 상기 제1 단위블록의 제1 단위돌출부가 외부로 노출되도록 하는 제9 단계, 제2 몰드블록을 준비하는 제10 단계, 상기 제2 몰드블록을 상기 제2 빌드공간에 배치하는 제11 단계, 제2 빌드공간에 상기 제2 단위철근망을 배치하는 제12 단계 및 상기 제2 빌드공간에 콘크리트를 타설하여, 상기 제2 단위블록을 획득하는 제13 단계를 포함하며, 상기 제1 단위철근망과 상기 제2 단위철근망은, 구축지반의 폭방향으로 중첩되는 영역이 적어도 하나일 수 있다.
Earthquake resistant diaphragm wall and method for construction thereof
According to one embodiment of the present invention, a method for constructing an earthquake-proof continuous wall comprises: a first step of preparing a first unit rebar net; a second step of preparing a second unit rebar net; a third step of forming a first build space; a fourth step of preparing a first mold block; a fifth step of arranging the first mold block in the first build space; a sixth step of arranging the first unit rebar net in the first build space; a seventh step of obtaining the first unit block; an eighth step of forming a second build space; a ninth step of enabling a first unit protruding part of the first unit block to be exposed to the outside; a tenth step of preparing a second mold block; an eleventh step of arranging the second mold block in the second build space; a twelfth step of arranging the second unit rebar net in the second build space; and a thirteenth step of pouring concrete into the second build space to obtain the second unit block, wherein the first unit rebar net and the second unit rebar net have at least one region overlapping in the width direction of the ground to be constructed.
본 발명의 일 실시예에 따른 내진 연속벽 시공방법은, 제1 단위철근망을 준비하는 제1 단계, 제2 단위철근망을 준비하는 제2 단계, 제1 빌드공간을 형성하는 제3 단계, 제1 몰드블록을 준비하는 제4 단계, 상기 제1 몰드블록을 상기 제1 빌드공간에 배치하는 제5 단계, 상기 제1 빌드공간에 상기 제1 단위철근망을 배치하는 제6 단계, 상기 제1 단위블록을 획득하는 제7 단계, 제2 빌드공간을 형성하는 제8 단계, 상기 제1 단위블록의 제1 단위돌출부가 외부로 노출되도록 하는 제9 단계, 제2 몰드블록을 준비하는 제10 단계, 상기 제2 몰드블록을 상기 제2 빌드공간에 배치하는 제11 단계, 제2 빌드공간에 상기 제2 단위철근망을 배치하는 제12 단계 및 상기 제2 빌드공간에 콘크리트를 타설하여, 상기 제2 단위블록을 획득하는 제13 단계를 포함하며, 상기 제1 단위철근망과 상기 제2 단위철근망은, 구축지반의 폭방향으로 중첩되는 영역이 적어도 하나일 수 있다.
Earthquake resistant diaphragm wall and method for construction thereof
내진 연속벽 및 이의 시공방법
KIM PYEONG HWA (author)
2020-12-24
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|EARTHQUAKE RESISTANT WALL AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2023
|Diaphragm wall and Construction method for diaphragm wall
European Patent Office | 2020
|