Construction method for earthquake resistant diaphragm wall and earthquake resistant diaphragm wall manufactured by thereof
According to one embodiment of the present invention, an earthquake-proof diaphragm wall construction method includes: a first step of preparing a first rebar unit; a second step of preparing a second rebar unit; a third step of preparing a first water stop unit; a fourth step of forming a first excavation space; a fifth step of placing the first water stop unit on one side of the first excavation space; a sixth step of placing the first rebar unit; a seventh step of obtaining a first block by placing concrete in the first excavation space; an eighth step of forming a second excavation space; a ninth step of removing the first water stop unit from the first block; a tenth step of preparing a second water stop unit; an eleventh step of placing the second water stop unit; a twelfth step of placing the second rebar unit in the second excavation space; and a thirteenth step of obtaining a second block. The first water stop unit includes: a first body part formed in a size corresponding to one side of the first excavation space; a first protruding part protruding from one side of the first body part; a first water stop part mounted on one side of the first body part; and a first protruding cover part covering the first protruding part. The first protruding cover part separates the first block and the first water stop unit, while placed between the first block and the first water stop unit, thereby facilitating the removal of the first water stop unit from the first block. Therefore, the present invention is capable of maximizing a water stop effect between blocks.
본 발명의 일 실시예에 따른 내진 연속벽의 시공방법은, 제1 철근유닛을 준비하는 제1 단계, 제2 철근유닛을 준비하는 제2 단계, 제1 지수유닛을 준비하는 제3 단계, 제1 굴착공간을 형성하는 제4 단계, 상기 제1 지수유닛을 상기 제1 굴착공간의 일측면에 배치하는 제5 단계, 상기 제1 철근유닛을 배치하는 제6 단계, 상기 제1 굴착공간에 콘크리트를 타설하여, 제1 블록을 획득하는 제7 단계, 제2 굴착공간을 형성하는 제8 단계, 상기 제1 지수유닛을 상기 제1 블록으로부터 제거하는 제9 단계, 제2 지수유닛을 준비하는 제10 단계, 상기 제2 지수유닛을 배치하는 제11 단계, 상기 제2 굴착공간에 상기 제2 철근유닛을 배치하는 제12 단계 및 제2 블록을 획득하는 제13 단계를 포함하며, 상기 제1 지수유닛은, 상기 제1 굴착공간의 일측면과 대응되는 크기로 형성되는 제1 본체부, 상기 제1 본체부의 일측면으로부터 돌출되는 제1 돌출부, 상기 제1 본체부의 일측면에 장착되는 제1 지수부 및 상기 제1 돌출부를 커버하는 제1 돌출커버부를 구비하며, 상기 제1 돌출커버부는, 상기 제1 블록과 상기 제1 지수유닛 사이에 배치된 채, 상기 제1 블록과 상기 제1 지수유닛이 이격되도록 하여, 상기 제1 지수유닛의 상기 제1 블록으로부터의 제거가 용이하도록 할 수 있다.
Construction method for earthquake resistant diaphragm wall and earthquake resistant diaphragm wall manufactured by thereof
According to one embodiment of the present invention, an earthquake-proof diaphragm wall construction method includes: a first step of preparing a first rebar unit; a second step of preparing a second rebar unit; a third step of preparing a first water stop unit; a fourth step of forming a first excavation space; a fifth step of placing the first water stop unit on one side of the first excavation space; a sixth step of placing the first rebar unit; a seventh step of obtaining a first block by placing concrete in the first excavation space; an eighth step of forming a second excavation space; a ninth step of removing the first water stop unit from the first block; a tenth step of preparing a second water stop unit; an eleventh step of placing the second water stop unit; a twelfth step of placing the second rebar unit in the second excavation space; and a thirteenth step of obtaining a second block. The first water stop unit includes: a first body part formed in a size corresponding to one side of the first excavation space; a first protruding part protruding from one side of the first body part; a first water stop part mounted on one side of the first body part; and a first protruding cover part covering the first protruding part. The first protruding cover part separates the first block and the first water stop unit, while placed between the first block and the first water stop unit, thereby facilitating the removal of the first water stop unit from the first block. Therefore, the present invention is capable of maximizing a water stop effect between blocks.
본 발명의 일 실시예에 따른 내진 연속벽의 시공방법은, 제1 철근유닛을 준비하는 제1 단계, 제2 철근유닛을 준비하는 제2 단계, 제1 지수유닛을 준비하는 제3 단계, 제1 굴착공간을 형성하는 제4 단계, 상기 제1 지수유닛을 상기 제1 굴착공간의 일측면에 배치하는 제5 단계, 상기 제1 철근유닛을 배치하는 제6 단계, 상기 제1 굴착공간에 콘크리트를 타설하여, 제1 블록을 획득하는 제7 단계, 제2 굴착공간을 형성하는 제8 단계, 상기 제1 지수유닛을 상기 제1 블록으로부터 제거하는 제9 단계, 제2 지수유닛을 준비하는 제10 단계, 상기 제2 지수유닛을 배치하는 제11 단계, 상기 제2 굴착공간에 상기 제2 철근유닛을 배치하는 제12 단계 및 제2 블록을 획득하는 제13 단계를 포함하며, 상기 제1 지수유닛은, 상기 제1 굴착공간의 일측면과 대응되는 크기로 형성되는 제1 본체부, 상기 제1 본체부의 일측면으로부터 돌출되는 제1 돌출부, 상기 제1 본체부의 일측면에 장착되는 제1 지수부 및 상기 제1 돌출부를 커버하는 제1 돌출커버부를 구비하며, 상기 제1 돌출커버부는, 상기 제1 블록과 상기 제1 지수유닛 사이에 배치된 채, 상기 제1 블록과 상기 제1 지수유닛이 이격되도록 하여, 상기 제1 지수유닛의 상기 제1 블록으로부터의 제거가 용이하도록 할 수 있다.
Construction method for earthquake resistant diaphragm wall and earthquake resistant diaphragm wall manufactured by thereof
내진 연속벽의 시공방법 및 이에 따라 시공된 내진 연속벽
KIM PYEONG HWA (author) / KIM BYUNG HYUN (author) / KIM JONG HO (author) / JUNG KYOUNG SIK (author) / KIM SUNG HAN (author)
2021-03-11
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Earthquake resistant diaphragm wall and method for construction thereof
European Patent Office | 2020
|EARTHQUAKE RESISTANT WALL AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2023
|