A platform for research: civil engineering, architecture and urbanism
Ground restoration method for the subsidence section of the railway
The present invention relates to a method for reinforcing and restoring the ground at a subsidence section, and more specifically, to a method for reinforcing the ground and restoring the ground at a subsidence section of a railway, wherein a subsidence portion of a railway is perforated and a double pipe is inserted through the perforated hole in order to inject grout before injecting a hardening agent. Here, the same can be injected only in one direction to minimize unnecessary injection, and to shorten the construction period. To this end, the method for reinforcing the ground and restoring the ground at a subsidence section of a railway according to one embodiment of the present invention comprises: a ground perforating step of perforating a perforation hole to perform grouting at a subsidence ground or a weak ground; an injection pipe insertion step of inserting a grout injection pipe into the perforation hole perforated in the ground perforating step; and a unidirectional grouting step of injecting grout into the ground to be grouted, while injecting the grout and the hardening agent in one direction from the side surface of the subsidence ground towards the subsidence ground in order to restore the subsidence ground and form reinforcement grouting.
본 발명은 침하 구간의 지반을 강화하며 복원하는 방법에 관한 것으로, 보다 상세하게는 철로의 침하 부위를 천공하고 천공된 구멍을 통해 2중관을 삽입하여 그라우트를 주입한 후 경화제를 주입하되, 일측 방향으로만 주입하여 불필요한 주입을 최소화하고, 시공 시간을 단축할 수 있는 지반 보강 및 철로의 침하구간 지반 복원 방법에 관한 것이다. 이를 위해 본 발명의 일실시예에 따른 지반 보강 및 철로의 침하구간 지반 복원 방법은, 침하 지반이나 연약 지반에 그라우팅을 할 수 있는 천공홀을 천공하는 지반 천공 단계, 상기 지반 천공 단계에서 천공된 천공홀로 그라우트 주입관을 삽입하는 주입관 삽입 단계, 그라우팅 하고자 하는 지반에 그라우트를 주입하되 침하 지반의 측면에서 침하 지반 측으로 일방향으로 그라우트와 경화제를 주입하여 침하 지반을 복원시키면서 보강 그라우팅을 형성하는 일방향 그라우팅 단계를 포함한다.
Ground restoration method for the subsidence section of the railway
The present invention relates to a method for reinforcing and restoring the ground at a subsidence section, and more specifically, to a method for reinforcing the ground and restoring the ground at a subsidence section of a railway, wherein a subsidence portion of a railway is perforated and a double pipe is inserted through the perforated hole in order to inject grout before injecting a hardening agent. Here, the same can be injected only in one direction to minimize unnecessary injection, and to shorten the construction period. To this end, the method for reinforcing the ground and restoring the ground at a subsidence section of a railway according to one embodiment of the present invention comprises: a ground perforating step of perforating a perforation hole to perform grouting at a subsidence ground or a weak ground; an injection pipe insertion step of inserting a grout injection pipe into the perforation hole perforated in the ground perforating step; and a unidirectional grouting step of injecting grout into the ground to be grouted, while injecting the grout and the hardening agent in one direction from the side surface of the subsidence ground towards the subsidence ground in order to restore the subsidence ground and form reinforcement grouting.
본 발명은 침하 구간의 지반을 강화하며 복원하는 방법에 관한 것으로, 보다 상세하게는 철로의 침하 부위를 천공하고 천공된 구멍을 통해 2중관을 삽입하여 그라우트를 주입한 후 경화제를 주입하되, 일측 방향으로만 주입하여 불필요한 주입을 최소화하고, 시공 시간을 단축할 수 있는 지반 보강 및 철로의 침하구간 지반 복원 방법에 관한 것이다. 이를 위해 본 발명의 일실시예에 따른 지반 보강 및 철로의 침하구간 지반 복원 방법은, 침하 지반이나 연약 지반에 그라우팅을 할 수 있는 천공홀을 천공하는 지반 천공 단계, 상기 지반 천공 단계에서 천공된 천공홀로 그라우트 주입관을 삽입하는 주입관 삽입 단계, 그라우팅 하고자 하는 지반에 그라우트를 주입하되 침하 지반의 측면에서 침하 지반 측으로 일방향으로 그라우트와 경화제를 주입하여 침하 지반을 복원시키면서 보강 그라우팅을 형성하는 일방향 그라우팅 단계를 포함한다.
Ground restoration method for the subsidence section of the railway
지반 보강 및 철로의 침하구간 지반 복원 방법
KO YOUNG SUNG (author)
2021-10-29
Patent
Electronic Resource
Korean
GROUND SUBSIDENCE RESTORATION EQUIPMENT AND RECLAMATION METHOD OF GROUND SUBSIDENCE USING THE SAME
European Patent Office | 2018
|European Patent Office | 2018
|Subsidence restoration apparatus for buildings and subsidence restoration method using the same
European Patent Office | 2023
|TIBKAT | 1989
|TIBKAT | 1977
|