Prestressed steel circular tube girder with partial filled concrete and structure construction method by using it
The present invention relates to a prestressed circular steel tube girder with partially filled concrete to reduce material costs of steel members, and a structure construction method using the same. According to the present invention, the prestressed circular steel tube girder with partially filled concrete comprises: a first steel pipe (10a) having an anchoring block part (20) formed at one end and having a fixed block part (20) formed at the other end; a second steel pipe (10b) continuously coupled to the first steel pipe (10a); and a third steel pipe (10c) continuously coupled to the second steel pipe (10b), having a fixed block (30) formed at one end, and having an anchoring block part (20) formed at the other end. Moreover, the structure construction method using the same sequentially couples the first to third steel pipes (10a, 10b, 10c) in a longitudinal direction and passes a PC steel wire (21) through the first to third steel pipes (10a, 10b, 10c) to apply tension, thereby integrally applying prestress to the first to third steel pipes (10a, 10b, 10c).
본 발명에 따른 프리스트레스가 도입된 콘크리트 부분 충전 원형강관 거더 및 이를 이용한 구조물의 시공방법은, 일단에 정착블록부(20)가 형성되어 있고, 그 타단에는 고정블록부(30)가 형성되어 있는 제1강관(10a)과, 제1강관(10a)에 연속적으로 접합되는 제2강관(10b)과, 제2강관(10b)에 연속적으로 접합되며, 그 일단에는 고정블록부(30)가 형성되어 있고, 그 타단에는 정착블록부(20)가 형성되어 있는 제3강관(10c)으로 구성된 것을 특징으로 한다. 한편, 본 발명에 따른 프리스트레스가 도입된 콘크리트 부분 충전 원형강관 거더 및 이를 이용한 구조물의 시공방법은 제1강관(10a), 제2강관(10b) 및 제3강관(10c)을 순차적으로 길이방향으로 접합시킨 이후 그 내부에 PC강선(21)을 통과시켜 긴장함으로써 제1강관(10a), 제2강관(10b) 및 제3강관(10c)에 일체적으로 프리스트레스가 도입되는 것을 특징으로 하는 것이다.
Prestressed steel circular tube girder with partial filled concrete and structure construction method by using it
The present invention relates to a prestressed circular steel tube girder with partially filled concrete to reduce material costs of steel members, and a structure construction method using the same. According to the present invention, the prestressed circular steel tube girder with partially filled concrete comprises: a first steel pipe (10a) having an anchoring block part (20) formed at one end and having a fixed block part (20) formed at the other end; a second steel pipe (10b) continuously coupled to the first steel pipe (10a); and a third steel pipe (10c) continuously coupled to the second steel pipe (10b), having a fixed block (30) formed at one end, and having an anchoring block part (20) formed at the other end. Moreover, the structure construction method using the same sequentially couples the first to third steel pipes (10a, 10b, 10c) in a longitudinal direction and passes a PC steel wire (21) through the first to third steel pipes (10a, 10b, 10c) to apply tension, thereby integrally applying prestress to the first to third steel pipes (10a, 10b, 10c).
본 발명에 따른 프리스트레스가 도입된 콘크리트 부분 충전 원형강관 거더 및 이를 이용한 구조물의 시공방법은, 일단에 정착블록부(20)가 형성되어 있고, 그 타단에는 고정블록부(30)가 형성되어 있는 제1강관(10a)과, 제1강관(10a)에 연속적으로 접합되는 제2강관(10b)과, 제2강관(10b)에 연속적으로 접합되며, 그 일단에는 고정블록부(30)가 형성되어 있고, 그 타단에는 정착블록부(20)가 형성되어 있는 제3강관(10c)으로 구성된 것을 특징으로 한다. 한편, 본 발명에 따른 프리스트레스가 도입된 콘크리트 부분 충전 원형강관 거더 및 이를 이용한 구조물의 시공방법은 제1강관(10a), 제2강관(10b) 및 제3강관(10c)을 순차적으로 길이방향으로 접합시킨 이후 그 내부에 PC강선(21)을 통과시켜 긴장함으로써 제1강관(10a), 제2강관(10b) 및 제3강관(10c)에 일체적으로 프리스트레스가 도입되는 것을 특징으로 하는 것이다.
Prestressed steel circular tube girder with partial filled concrete and structure construction method by using it
프리스트레스가 도입된 콘크리트 부분 충전 원형강관 거더 및 이를 이용한 구조물의 시공방법
KIM TAE KYUN (author)
2018-06-25
Patent
Electronic Resource
Korean
Construction method of steel box girder using concrete filled steel tube
European Patent Office | 2023
|Construction method of steel box girder using concrete filled steel tube
European Patent Office | 2023
European Patent Office | 2018
European Patent Office | 2018
|