A platform for research: civil engineering, architecture and urbanism
METHOD FOR CONSTRUCTING EMBEDDED RAIL TRACK
The present invention relates to a method for constructing a rail-embedded track. The method for constructing a rail-embedded track includes the following steps of: constructing foundation concrete along the rail-embedded track to be constructed; installing a reinforced structure by reinforcing a reinforcing bar on the foundation concrete; installing a mold for molding a main body so as to form a slab main body having rail grooves on the foundation concrete; constructing the slab main body having the two rail grooves by placing the concrete into the mold for molding a main body; positioning each rail on the rail grooves of the slab main body; installing a rail position adjusting jig adjusting positions of the rails positioned on the rail grooves of the slab main body, respectively, on the slab main body; adjusting the positions of the rails by the rail position adjusting jig to temporarily fix the same; elastically fixing the rails by firstly placing rail fixing resins into the rail grooves of the slab main body, respectively; removing the rail position adjusting jig from the slab main body; and secondarily placing the rail fixing resins into the rail grooves of the slab main body, respectively. According to the present invention, the method for constructing a rail-embedded track can simply construct the rail-embedded track in which the rails are embedded, allow the rails to be exactly embedded in a set position, and absorb vibration and impact generated on the rails to minimize transfer of vibration and impact to the outside.
본 발명은 레일매립궤도 시공방법에 관한 것으로, 본 발명은 시공될 레일매립궤도에 따라 기초콘크리트를 시공하는 단계; 상기 기초콘크리트 위에 철근을 배근하여 철근구조물을 설치하는 단계; 상기 기초콘크리트에, 레일홈들이 구비된 슬래브본체를 형성하기 위하여 본체성형용 거푸집을 설치하는 단계; 상기 본체성형용 거푸집에 콘크리트를 타설하여 두 개의 레일홈이 구비된 슬래브본체를 시공하는 단계; 상기 슬래브본체의 레일홈들에 각각 레일을 위치시키는 단계; 상기 슬래브본체의 레일홈들에 각각 위치한 레일들의 위치를 조절하는 레일위치조절지그를 상기 슬래브본체에 설치하는 단계; 상기 레일위치조절지그로 상기 레일들의 위치를 조절하여 가고정하는 단계; 상기 슬래브본체의 레일홈들에 각각 1차로 레일고정수지를 타설하여 레일을 탄성 고정하는 단계; 상기 레일위치조절지그를 슬래브본체로부터 제거하는 단계; 상기 슬래브본체의 레일홈들에 각각 2차로 레일고정수지를 타설하는 단계;를 포함한다. 본 발명에 따르면, 레일이 매립되는 레일매립형 궤도의 시공이 간단하고 레일을 설정된 위치에 정확하게 매립하게 되며 레일에 발생되는 진동 및 충격을 흡수하여 외부로 전달되는 것을 최소화한다.
METHOD FOR CONSTRUCTING EMBEDDED RAIL TRACK
The present invention relates to a method for constructing a rail-embedded track. The method for constructing a rail-embedded track includes the following steps of: constructing foundation concrete along the rail-embedded track to be constructed; installing a reinforced structure by reinforcing a reinforcing bar on the foundation concrete; installing a mold for molding a main body so as to form a slab main body having rail grooves on the foundation concrete; constructing the slab main body having the two rail grooves by placing the concrete into the mold for molding a main body; positioning each rail on the rail grooves of the slab main body; installing a rail position adjusting jig adjusting positions of the rails positioned on the rail grooves of the slab main body, respectively, on the slab main body; adjusting the positions of the rails by the rail position adjusting jig to temporarily fix the same; elastically fixing the rails by firstly placing rail fixing resins into the rail grooves of the slab main body, respectively; removing the rail position adjusting jig from the slab main body; and secondarily placing the rail fixing resins into the rail grooves of the slab main body, respectively. According to the present invention, the method for constructing a rail-embedded track can simply construct the rail-embedded track in which the rails are embedded, allow the rails to be exactly embedded in a set position, and absorb vibration and impact generated on the rails to minimize transfer of vibration and impact to the outside.
본 발명은 레일매립궤도 시공방법에 관한 것으로, 본 발명은 시공될 레일매립궤도에 따라 기초콘크리트를 시공하는 단계; 상기 기초콘크리트 위에 철근을 배근하여 철근구조물을 설치하는 단계; 상기 기초콘크리트에, 레일홈들이 구비된 슬래브본체를 형성하기 위하여 본체성형용 거푸집을 설치하는 단계; 상기 본체성형용 거푸집에 콘크리트를 타설하여 두 개의 레일홈이 구비된 슬래브본체를 시공하는 단계; 상기 슬래브본체의 레일홈들에 각각 레일을 위치시키는 단계; 상기 슬래브본체의 레일홈들에 각각 위치한 레일들의 위치를 조절하는 레일위치조절지그를 상기 슬래브본체에 설치하는 단계; 상기 레일위치조절지그로 상기 레일들의 위치를 조절하여 가고정하는 단계; 상기 슬래브본체의 레일홈들에 각각 1차로 레일고정수지를 타설하여 레일을 탄성 고정하는 단계; 상기 레일위치조절지그를 슬래브본체로부터 제거하는 단계; 상기 슬래브본체의 레일홈들에 각각 2차로 레일고정수지를 타설하는 단계;를 포함한다. 본 발명에 따르면, 레일이 매립되는 레일매립형 궤도의 시공이 간단하고 레일을 설정된 위치에 정확하게 매립하게 되며 레일에 발생되는 진동 및 충격을 흡수하여 외부로 전달되는 것을 최소화한다.
METHOD FOR CONSTRUCTING EMBEDDED RAIL TRACK
레일매립궤도 시공방법
HYOUNG JUNG SUB (author) / PARK JEUNG GEUN (author)
2020-09-21
Patent
Electronic Resource
Korean
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau