A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF EARTH RETAINING WALL USING EARTH ANCHOR
The present invention provides a construction method for an anchor type earth retaining wall, capable of improving construction efficiency. According to an embodiment of the present invention, the construction method for an anchor type earth retaining wall includes: a step of arranging multiple H-piles at intervals in a boundary part of a first ground surface and a second ground surface higher than the first ground surface and arranging a soil retaining plate between the H-piles; a step of connecting a furring strip to the H-piles by tilting the furring strip at a design angle to the first ground surface, wherein the furring strip includes a main body unit defining a first guide hole and a wing unit extended from the main body unit to both sides; a step of forming a boring hole tilted at the design angle to the first ground surface below the second ground surface by inserting a drilling device into the first guide hole in a direction from the first ground surface to the second ground surface; a step of arranging steel wire in the boring hole through the first guide hole; and a step of controlling the position of the steel wire on the first guide hole.
본 발명의 일 실시 예에 따른 앵커식 흙막이 가시설의 시공 방법은, 제1 지면 및 상기 제1 지면보다 높은 위치의 제2 지면의 경계 부분에 복수 개의 엄지 말뚝을 이격시켜 배치하고, 상기 엄지 말뚝 사이에 토류판을 배치하는 단계, 제1 가이드홀이 정의된 본체부 및 상기 본체부로부터 양측으로 연장하는 날개부를 포함하는 띠장을 상기 제1 지면에 대해 설계 각도로 기울여 상기 엄지 말뚝들에 연결하는 단계, 상기 제1 지면에서 상기 제2 지면을 향하는 방향으로 상기 제1 가이드홀에 천공 장치를 삽입하여 상기 제2 지면 아래에 상기 제1 지면에 대해상기 설계 각도로 기울여진 천공홀을 형성하는 단계, 상기 제1 가이드홀을 통해 상기 천공홀에 강선을 배치하는 단계, 및 상기 제1 가이드홀 상에서 상기 강선의 위치를 조절하는 단계를 포함한다.
CONSTRUCTION METHOD OF EARTH RETAINING WALL USING EARTH ANCHOR
The present invention provides a construction method for an anchor type earth retaining wall, capable of improving construction efficiency. According to an embodiment of the present invention, the construction method for an anchor type earth retaining wall includes: a step of arranging multiple H-piles at intervals in a boundary part of a first ground surface and a second ground surface higher than the first ground surface and arranging a soil retaining plate between the H-piles; a step of connecting a furring strip to the H-piles by tilting the furring strip at a design angle to the first ground surface, wherein the furring strip includes a main body unit defining a first guide hole and a wing unit extended from the main body unit to both sides; a step of forming a boring hole tilted at the design angle to the first ground surface below the second ground surface by inserting a drilling device into the first guide hole in a direction from the first ground surface to the second ground surface; a step of arranging steel wire in the boring hole through the first guide hole; and a step of controlling the position of the steel wire on the first guide hole.
본 발명의 일 실시 예에 따른 앵커식 흙막이 가시설의 시공 방법은, 제1 지면 및 상기 제1 지면보다 높은 위치의 제2 지면의 경계 부분에 복수 개의 엄지 말뚝을 이격시켜 배치하고, 상기 엄지 말뚝 사이에 토류판을 배치하는 단계, 제1 가이드홀이 정의된 본체부 및 상기 본체부로부터 양측으로 연장하는 날개부를 포함하는 띠장을 상기 제1 지면에 대해 설계 각도로 기울여 상기 엄지 말뚝들에 연결하는 단계, 상기 제1 지면에서 상기 제2 지면을 향하는 방향으로 상기 제1 가이드홀에 천공 장치를 삽입하여 상기 제2 지면 아래에 상기 제1 지면에 대해상기 설계 각도로 기울여진 천공홀을 형성하는 단계, 상기 제1 가이드홀을 통해 상기 천공홀에 강선을 배치하는 단계, 및 상기 제1 가이드홀 상에서 상기 강선의 위치를 조절하는 단계를 포함한다.
CONSTRUCTION METHOD OF EARTH RETAINING WALL USING EARTH ANCHOR
앵커식 흙막이 가시설의 시공 방법
KWON CHANG IN (author) / CHUNG WON KI (author)
2022-10-24
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION METHOD OF EARTH ANCHOR OF EARTH RETAINING WALL
European Patent Office | 2019
|EARTH RETAINING WALL, CONSTRUCTION METHOD OF EARTH RETAINING WALL
European Patent Office | 2019
|Earth retaining wall construction device and earth retaining wall construction method
European Patent Office | 2021
|Construction Method of Earth Retaining Wall Using Earth Anchor Appling Overlap Zone of Wale
European Patent Office | 2023
|CONSTRUCTION METHOD OF EARTH RETAINING WALL WITH ADJUSTABLE ANCHOR ANGLE
European Patent Office | 2024
|