PARTIALLY PREFABRICATED BUILDING AND METHOD OF ITS ERECTION
FIELD: construction.SUBSTANCE: invention relates to erection of prefabricated construction structures. Proposed process comprises the steps that follow. Concreting the floor (3) on soil (2). Hoisting means (4) are installed at floor (2), at corners of roof (3). Walls (1) and roof (3) are moulded at floor (2) at fitting at floor (2) of walls form (30) and roof form (31). After assembly of forms (30, 31) the latter are filled with concrete to be hardened. Note here that walls (1) and roof (3) are connected by connector (7) that makes semi-stiff connections there between. Roof (3) and walls (1) are hoisted simultaneously by said hoisting means (4) provided with fixed part (8) arranged at floor (2) and moving part (9) displacing relative to the latter and connected with roof (3). Walls (1) and roof (3) are simultaneously hoisted and turned and displaced relative to bottom edge from initial position whereat walls (1) and roof (3) rest on floor (2) to final position owing to the weight of walls and said semi-stiff connection (7). Note here that roof (3) and walls (1) are hoisted with the help of beams (32) arranged parallel with the sides of roof (3), nearby its ends. Note also that beams (32) are equipped with extending bars (34) at the ends of beams (32) to be pushed off by second discs (13) secured to hoisting means moving parts (9). Walls (1) are bundled and bonded together. Walls (1) are bonded with roof (3) and hoisting means (4) is removed.EFFECT: accelerated and simplified erection.5 cl, 10 dwg
Изобретение относится к способам возведения сборных строительных конструкций. Способ строительства частично сборного здания включает:- бетонирование пола (3) на грунте (2);- установку на полу (2), в углах кровли (3), подъемного средства (4);- формование стен (1) и кровли (3) на полу (2) с установкой на полу (2) опалубки (30) стен и опалубки (31) кровли и после сборки опалубки (30, 31) заполнение опалубки (30, 31) бетоном и затвердевание бетона, при этом стены (1) и кровлю (3) соединяют соединительным средством (7), создающим полужесткие соединения между стенами (1) и кровлей (3);- совместный подъем кровли (3) и стен (1) с помощью синхронизированного приведения в движение подъемного средства (4), установленного в углах кровли (3), содержащего неподвижно закрепленную часть (8), установленную на полу (2), и подвижную часть (9), перемещающуюся относительно неподвижно закрепленной части (8) и соединенную с кровлей (3);- совместный подъем стен (1) с кровлей (3) с поворотом и перемещением относительно нижней кромки из исходного положения, в котором стены (1) и кровля (3) опираются на пол (2), в конечное положение благодаря весу стен и полужестким соединениям, созданным с помощью соединительного средства (7); при этом подъем кровли (3) и стен (1) содержит обеспечение балок (32), параллельных сторонам кровли (3) и расположенных вблизи концов кровли (3), причем балки (32) оборудуют в своей верхней части выступающими брусками (34) на концах балок (32) для выталкивания вторыми дисками (13), прикрепленными к подвижным частям (9) подъемного средства;- обвязку и закрепление стен (1);- соединение стен (1) вместе;- соединение стен (1) с кровлей (3);- удаление подъемного средства (4).Изобретение позволяет ус
PARTIALLY PREFABRICATED BUILDING AND METHOD OF ITS ERECTION
FIELD: construction.SUBSTANCE: invention relates to erection of prefabricated construction structures. Proposed process comprises the steps that follow. Concreting the floor (3) on soil (2). Hoisting means (4) are installed at floor (2), at corners of roof (3). Walls (1) and roof (3) are moulded at floor (2) at fitting at floor (2) of walls form (30) and roof form (31). After assembly of forms (30, 31) the latter are filled with concrete to be hardened. Note here that walls (1) and roof (3) are connected by connector (7) that makes semi-stiff connections there between. Roof (3) and walls (1) are hoisted simultaneously by said hoisting means (4) provided with fixed part (8) arranged at floor (2) and moving part (9) displacing relative to the latter and connected with roof (3). Walls (1) and roof (3) are simultaneously hoisted and turned and displaced relative to bottom edge from initial position whereat walls (1) and roof (3) rest on floor (2) to final position owing to the weight of walls and said semi-stiff connection (7). Note here that roof (3) and walls (1) are hoisted with the help of beams (32) arranged parallel with the sides of roof (3), nearby its ends. Note also that beams (32) are equipped with extending bars (34) at the ends of beams (32) to be pushed off by second discs (13) secured to hoisting means moving parts (9). Walls (1) are bundled and bonded together. Walls (1) are bonded with roof (3) and hoisting means (4) is removed.EFFECT: accelerated and simplified erection.5 cl, 10 dwg
Изобретение относится к способам возведения сборных строительных конструкций. Способ строительства частично сборного здания включает:- бетонирование пола (3) на грунте (2);- установку на полу (2), в углах кровли (3), подъемного средства (4);- формование стен (1) и кровли (3) на полу (2) с установкой на полу (2) опалубки (30) стен и опалубки (31) кровли и после сборки опалубки (30, 31) заполнение опалубки (30, 31) бетоном и затвердевание бетона, при этом стены (1) и кровлю (3) соединяют соединительным средством (7), создающим полужесткие соединения между стенами (1) и кровлей (3);- совместный подъем кровли (3) и стен (1) с помощью синхронизированного приведения в движение подъемного средства (4), установленного в углах кровли (3), содержащего неподвижно закрепленную часть (8), установленную на полу (2), и подвижную часть (9), перемещающуюся относительно неподвижно закрепленной части (8) и соединенную с кровлей (3);- совместный подъем стен (1) с кровлей (3) с поворотом и перемещением относительно нижней кромки из исходного положения, в котором стены (1) и кровля (3) опираются на пол (2), в конечное положение благодаря весу стен и полужестким соединениям, созданным с помощью соединительного средства (7); при этом подъем кровли (3) и стен (1) содержит обеспечение балок (32), параллельных сторонам кровли (3) и расположенных вблизи концов кровли (3), причем балки (32) оборудуют в своей верхней части выступающими брусками (34) на концах балок (32) для выталкивания вторыми дисками (13), прикрепленными к подвижным частям (9) подъемного средства;- обвязку и закрепление стен (1);- соединение стен (1) вместе;- соединение стен (1) с кровлей (3);- удаление подъемного средства (4).Изобретение позволяет ус
PARTIALLY PREFABRICATED BUILDING AND METHOD OF ITS ERECTION
ЧАСТИЧНО СБОРНОЕ ЗДАНИЕ И СПОСОБ ЕГО ВОЗВЕДЕНИЯ
BENGOA SAEHS DE KORTASAR DOMINGO (author)
2015-07-27
Patent
Electronic Resource
Russian
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
SYSTEM FOR PREFABRICATED BUILDINGS AND A BUILDING ERECTION METHOD
European Patent Office | 2025
|Lateral prefabricated yard girder erection construction method
European Patent Office | 2023
|