ERECTION METHOD OF DRIVEN PILE
FIELD: construction.SUBSTANCE: oscillations are obtained by means of a vibrator installed on a column of a screw shell. Essence of the invention consists in the fact that an erection method of a driven pile, which involves formation of a well by rotation of the screw shell at its being loaded by pressure, compaction of the well walls at reverse rotation of the screw shell, supply of working material through the well head along outer surface of the screw shell at reverse rotation with further compaction of working material, removal of the screw shell at its being loaded by pressure by pulling the screw shell out of the well by compacted working material; before the working material is supplied, it is moistened till humidity is 27-32%, thus bringing its consistency to soft and plastic. A vibration mode is activated at reverse rotation of the screw shell.EFFECT: increasing density of working material of a pile due to high-frequency oscillations.7 cl, 7 dwg
Изобретение относится к строительству, а именно к областям промышленного, транспортного, гражданского, военного, гидротехнического, сельскохозяйственного, коммерческого строительства. Техническим результатом заявляемого способа является повышение плотности рабочего материала сваи за счет высокочастотных колебаний. Данные колебания получают с помощью вибратора, установленного на колонну шнекового снаряда. Сущность изобретения состоит в том, что способ возведения буронабивной сваи, включающий формирование скважины вращением шнекового снаряда при нагрузке его давлением, уплотнение стенок скважины при обратном вращении шнекового снаряда, подачу рабочего материала через устье скважины по внешней поверхности шнекового снаряда при обратном вращении с последующим уплотнением рабочего материала, извлечение шнекового снаряда при нагрузке его давлением путем выталкивания шнекового снаряда из скважины уплотненным рабочим материалом, перед подачей рабочий материал увлажняют либо высушивают до влажности 27-32%, доводя его консистенцию до мягкопластичной. При обратном вращении шнекового снаряда включают режим вибрации. 6 з.п. ф-лы, 7 ил.
ERECTION METHOD OF DRIVEN PILE
FIELD: construction.SUBSTANCE: oscillations are obtained by means of a vibrator installed on a column of a screw shell. Essence of the invention consists in the fact that an erection method of a driven pile, which involves formation of a well by rotation of the screw shell at its being loaded by pressure, compaction of the well walls at reverse rotation of the screw shell, supply of working material through the well head along outer surface of the screw shell at reverse rotation with further compaction of working material, removal of the screw shell at its being loaded by pressure by pulling the screw shell out of the well by compacted working material; before the working material is supplied, it is moistened till humidity is 27-32%, thus bringing its consistency to soft and plastic. A vibration mode is activated at reverse rotation of the screw shell.EFFECT: increasing density of working material of a pile due to high-frequency oscillations.7 cl, 7 dwg
Изобретение относится к строительству, а именно к областям промышленного, транспортного, гражданского, военного, гидротехнического, сельскохозяйственного, коммерческого строительства. Техническим результатом заявляемого способа является повышение плотности рабочего материала сваи за счет высокочастотных колебаний. Данные колебания получают с помощью вибратора, установленного на колонну шнекового снаряда. Сущность изобретения состоит в том, что способ возведения буронабивной сваи, включающий формирование скважины вращением шнекового снаряда при нагрузке его давлением, уплотнение стенок скважины при обратном вращении шнекового снаряда, подачу рабочего материала через устье скважины по внешней поверхности шнекового снаряда при обратном вращении с последующим уплотнением рабочего материала, извлечение шнекового снаряда при нагрузке его давлением путем выталкивания шнекового снаряда из скважины уплотненным рабочим материалом, перед подачей рабочий материал увлажняют либо высушивают до влажности 27-32%, доводя его консистенцию до мягкопластичной. При обратном вращении шнекового снаряда включают режим вибрации. 6 з.п. ф-лы, 7 ил.
ERECTION METHOD OF DRIVEN PILE
СПОСОБ ВОЗВЕДЕНИЯ БУРОНАБИВНОЙ СВАИ
MAL TSEV NIKOLAJ VASIL EVICH (author)
2015-08-20
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD
European Patent Office | 2018
|REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION
European Patent Office | 2018
|METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING
European Patent Office | 2020
|