A platform for research: civil engineering, architecture and urbanism
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION
FIELD: construction.SUBSTANCE: invention relates to construction, namely to the bearing elements and buildings and structures pile foundations erecting methods on type II soils by subsidence. Reinforced-concrete drilling pile is designed for erection on subsidence soils, includes frame from the upper part, located in the subsidence soil and the lower part, placed in non-subsidence soil, the frame is made with the subsidence compensating elements, made with a gap filled with solid material. Pile is made with the upper support part embedding into the lower foundation part within the subsidence soils thickness. Compensating element is made in the form of a compensating shell, with its embedding into the non-subsidence layer roof, with possibility of the compensation element independent vertical displacement and settling relative to the pile frame outer surface, with horizontal insulating and vertical compensating clearances. Horizontal insulating clearance with size of at least 0.3 D mm is filled with rolled, particles of solid material of the same diameter from the 3–50 mm fraction, where D is the pile frame outer surface diameter.EFFECT: technical result consists in ensuring the unloading processes stabilization from the bearing frame “parasitic” loads, caused by negative frictional forces along the pile side surface within the subsidence soils thickness, increase in the drilled piles useful bearing capacity for loads directly from buildings and structures.10 cl, 6 dwg
Изобретение относится к строительству, а именно к несущим элементам и способам возведения свайных фундаментов для зданий и сооружений на грунтах II типа по просадочности. Свая железобетонная буровая выполнена для возведения на просадочных грунтах, включает остов из верхней части, размещаемой в просадочном грунте и нижней части, размещаемой в непросадочном грунте, остов выполнен с компенсационными элементамим просадочных явлений, выполнен с зазором, заполненным твердым материалом. Свая выполнена с заделкой верхней опорной части в нижнюю фундаментную часть в пределах толщи просадочных грунтов. Компенсационный элемент выполнен в виде компенсирующей оболочки, с ее заделкой в кровле непросадочной толщи, с возможностью независимого вертикального смещения и осадки компенсационного элемента по отношению к наружной поверхности остова сваи, с горизонтальным изолирующим и вертикальным компенсирующим зазорами. Горизонтальный изолирующий зазор размером не менее 0,3 D мм выполнен с засыпкой окатанными, из твердого материала частицами одинакового диаметра из фракции 3-50 мм, где D - диаметр наружной поверхности остова сваи. Технический результат состоит в обеспечении стабилизации процессов разгрузки от «паразитных» нагрузок несущего остова, обусловленных отрицательными силами трения по боковой поверхности сваи в пределах толщи просадочных грунтов, повышении полезной несущей способность буровых свай на нагрузки непосредственно от зданий и сооружений. 2 н. и 8 з.п. ф-лы, 6 ил.
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION
FIELD: construction.SUBSTANCE: invention relates to construction, namely to the bearing elements and buildings and structures pile foundations erecting methods on type II soils by subsidence. Reinforced-concrete drilling pile is designed for erection on subsidence soils, includes frame from the upper part, located in the subsidence soil and the lower part, placed in non-subsidence soil, the frame is made with the subsidence compensating elements, made with a gap filled with solid material. Pile is made with the upper support part embedding into the lower foundation part within the subsidence soils thickness. Compensating element is made in the form of a compensating shell, with its embedding into the non-subsidence layer roof, with possibility of the compensation element independent vertical displacement and settling relative to the pile frame outer surface, with horizontal insulating and vertical compensating clearances. Horizontal insulating clearance with size of at least 0.3 D mm is filled with rolled, particles of solid material of the same diameter from the 3–50 mm fraction, where D is the pile frame outer surface diameter.EFFECT: technical result consists in ensuring the unloading processes stabilization from the bearing frame “parasitic” loads, caused by negative frictional forces along the pile side surface within the subsidence soils thickness, increase in the drilled piles useful bearing capacity for loads directly from buildings and structures.10 cl, 6 dwg
Изобретение относится к строительству, а именно к несущим элементам и способам возведения свайных фундаментов для зданий и сооружений на грунтах II типа по просадочности. Свая железобетонная буровая выполнена для возведения на просадочных грунтах, включает остов из верхней части, размещаемой в просадочном грунте и нижней части, размещаемой в непросадочном грунте, остов выполнен с компенсационными элементамим просадочных явлений, выполнен с зазором, заполненным твердым материалом. Свая выполнена с заделкой верхней опорной части в нижнюю фундаментную часть в пределах толщи просадочных грунтов. Компенсационный элемент выполнен в виде компенсирующей оболочки, с ее заделкой в кровле непросадочной толщи, с возможностью независимого вертикального смещения и осадки компенсационного элемента по отношению к наружной поверхности остова сваи, с горизонтальным изолирующим и вертикальным компенсирующим зазорами. Горизонтальный изолирующий зазор размером не менее 0,3 D мм выполнен с засыпкой окатанными, из твердого материала частицами одинакового диаметра из фракции 3-50 мм, где D - диаметр наружной поверхности остова сваи. Технический результат состоит в обеспечении стабилизации процессов разгрузки от «паразитных» нагрузок несущего остова, обусловленных отрицательными силами трения по боковой поверхности сваи в пределах толщи просадочных грунтов, повышении полезной несущей способность буровых свай на нагрузки непосредственно от зданий и сооружений. 2 н. и 8 з.п. ф-лы, 6 ил.
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION
СВАЯ ЖЕЛЕЗОБЕТОННАЯ БУРОВАЯ И СПОСОБ ЕЕ ВОЗВЕДЕНИЯ
YURKEVICH PAVEL BORISOVICH (author)
2018-06-18
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD
European Patent Office | 2018
|METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION
European Patent Office | 2019
|REINFORCED CONCRETE WALL ERECTION METHOD BY 3D PRINTING METHOD