A platform for research: civil engineering, architecture and urbanism
DEVICE FOR EXECUTION OF CONSTRUCTION WORKS
FIELD: construction.SUBSTANCE: invention relates to the field of construction, including transport, road and hydraulic engineering, and can be used to strengthen earthworks for various purposes, including embankments of earthwork canvas, dams, slopes of earthworks, intended for construction of various structures on them and same objects built on weak, including marshy, soils. Device for execution of construction works contains at least one composite platform, bearing equipment for production of construction works and installed with possibility of independent movement in relation to crossbars connecting ends of supporting pipes located in two rows. Platform is made with longitudinal elements supported by rollers with flanges mounted on crossbars with possibility of moving them along and fixing. Crossbars ends are made with two rows of holes and are located in guide elements of heads, limiting displacement of crossbars along vertical and in transverse direction, for their adjustable fastening bolted connections on support pipes ends.EFFECT: technical result consists in providing simplicity of mounting on supports, reducing duration and complexity of installation, allowing to make necessary adjustments by simple means to exclude wedging of the platform with respect to supports while moving it.6 cl, 5 dwg
Изобретение относится к области строительства, в том числе транспортного, дорожного и гидротехнического, и может быть использовано для укрепления земляных сооружений различного назначения, в том числе насыпей земляного полотна, дамб, откосов земляных сооружений, предназначенных для строительства на них различных сооружений и т.п. объектов, возводимых на слабых, в том числе болотистых, грунтах. Устройство для производства строительных работ содержит по крайней мере одну составную платформу, несущую оборудование для производства строительных работ и установленную с возможностью независимого перемещения относительно ригелей, связывающих оголовки опорных труб, расположенных в двух рядах. Платформа выполнена с продольными элементами, опирающимися на ролики с ребордами, установленными на ригелях с возможностью перемещения вдоль них и фиксации. Концы ригелей выполнены с двумя рядами отверстий и расположены в направляющих элементах оголовков, ограничивающих смещение ригелей по вертикали и в поперечном направлении, для их регулируемого закрепления болтовыми соединениями на оголовках опорных труб. Технический результат состоит в обеспечении простоты монтажа на опорах, снижении длительности и сложности монтажа, позволяющих произвести необходимые регулировки простыми средствами для исключения заклинивания платформы относительно опор при ее перемещении. 5 з.п. ф-лы, 5 ил.
DEVICE FOR EXECUTION OF CONSTRUCTION WORKS
FIELD: construction.SUBSTANCE: invention relates to the field of construction, including transport, road and hydraulic engineering, and can be used to strengthen earthworks for various purposes, including embankments of earthwork canvas, dams, slopes of earthworks, intended for construction of various structures on them and same objects built on weak, including marshy, soils. Device for execution of construction works contains at least one composite platform, bearing equipment for production of construction works and installed with possibility of independent movement in relation to crossbars connecting ends of supporting pipes located in two rows. Platform is made with longitudinal elements supported by rollers with flanges mounted on crossbars with possibility of moving them along and fixing. Crossbars ends are made with two rows of holes and are located in guide elements of heads, limiting displacement of crossbars along vertical and in transverse direction, for their adjustable fastening bolted connections on support pipes ends.EFFECT: technical result consists in providing simplicity of mounting on supports, reducing duration and complexity of installation, allowing to make necessary adjustments by simple means to exclude wedging of the platform with respect to supports while moving it.6 cl, 5 dwg
Изобретение относится к области строительства, в том числе транспортного, дорожного и гидротехнического, и может быть использовано для укрепления земляных сооружений различного назначения, в том числе насыпей земляного полотна, дамб, откосов земляных сооружений, предназначенных для строительства на них различных сооружений и т.п. объектов, возводимых на слабых, в том числе болотистых, грунтах. Устройство для производства строительных работ содержит по крайней мере одну составную платформу, несущую оборудование для производства строительных работ и установленную с возможностью независимого перемещения относительно ригелей, связывающих оголовки опорных труб, расположенных в двух рядах. Платформа выполнена с продольными элементами, опирающимися на ролики с ребордами, установленными на ригелях с возможностью перемещения вдоль них и фиксации. Концы ригелей выполнены с двумя рядами отверстий и расположены в направляющих элементах оголовков, ограничивающих смещение ригелей по вертикали и в поперечном направлении, для их регулируемого закрепления болтовыми соединениями на оголовках опорных труб. Технический результат состоит в обеспечении простоты монтажа на опорах, снижении длительности и сложности монтажа, позволяющих произвести необходимые регулировки простыми средствами для исключения заклинивания платформы относительно опор при ее перемещении. 5 з.п. ф-лы, 5 ил.
DEVICE FOR EXECUTION OF CONSTRUCTION WORKS
УСТРОЙСТВО ДЛЯ ПРОИЗВОДСТВА СТРОИТЕЛЬНЫХ РАБОТ
GAVRILOV DMITRIJ GENNADEVICH (author) / VOROBEV ALEKSEJ VIKTOROVICH (author)
2018-07-26
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
Contract Management During Execution of Construction Works
British Library Conference Proceedings | 1995
|CONSTRUCTION WORK EXECUTION METHOD AND CONSTRUCTION WORK EXECUTION DEVICE
European Patent Office | 2024
|CONSTRUCTION WORK EXECUTION METHOD AND CONSTRUCTION WORK EXECUTION DEVICE
European Patent Office | 2024
|RELIABILITY ANALYSIS OF BIDDERS AND THEIR TENDER OFFERS CONCERNING EXECUTION OF CONSTRUCTION WORKS
DOAJ | 2016
|Methods of execution of preliminary works during construction of high-head dams in mountain gorges
Engineering Index Backfile | 1965
|