METHOD FOR CONSTRUCTION OF FOUNDATION ON SOIL OF MINE OPENING IN COAL AND SHALE MINE
FIELD: mining.SUBSTANCE: present invention relates to the mining industry, to the construction of a foundation on the soil of mine opening in a coal and shale mine. According to the first variant of the method, in the case of a horizontal or inclined coal or mixed face mine opening, with an angle of inclination of up to 13 degrees, following the advance of the cutoff face, a geomembrane is arranged on the soil of the mine opening, on top of the geomembrane, sections of three-dimensional reinforcing framework are laid, it is made from metal molded strips with holes for perforation and mounting holes with a width of 50 to 300 mm from cold-rolled steel with a thickness of 1.5 mm. Two strips are bonded by welding to obtain three-dimensional cells with equal dimensions in length and width from 250 to 400 mm and a height equal to the width of the strip. Pairs of molded strips are joined into sections by welding. Said sections of the three-dimensional reinforcing frame are connected with each other after they have been laid on the soil of the mine opening by studs with washers and nuts with M16-M24 thread sizes through perforating and mounting holes. Said sections of the three-dimensional reinforcing framework are filled to the entire height of the framework with rock formed during the mining operations using a tunneling machine. On the top of the framework, a protective layer of at least 50 mm thick is poured consisting from rock formed during the mining operations. According to the second variant of the method, following the advance of the cutoff face, a geomembrane is laid on the soil of the mining opening, and a three-dimensional reinforcing frame is laid on the geomembrane, said frame is made from a three-dimensional geogrid, which is a three-dimensional structure in the form of a section consisting of cells of the same geometric shape and the same dimensions, made of polymer strips, which are made of synthetic or natural polymers of the same width and thickness and a length much longer than the width of the strip.EFFECT: methods for constructing a foundation on the soil of a coal and shale mine opening are proposed.6 cl, 12 dwg
Настоящее изобретение относится к горной промышленности, к строительству основания на почве горной выработки в угольной и сланцевой шахте. Согласно первому варианту способа при проведении горизонтальной или наклонной, с углом наклона до 13 градусов, горной выработки по углю или по смешанному забою вслед за продвижением проходческого забоя на почву горной выработки укладывают геомембрану, на геомембрану укладывают секции каркаса объемного армирующего, выполненного из металлических формованных полос с отверстиями для перфорации и монтажными отверстиями шириной от 50 до 300 мм из холоднокатаной стали толщиной от 1,5 мм. Соединяют две полосы с помощью сварки для получения объемных ячеек с равными размерами по длине и ширине от 250 до 400 мм и высотой, равной ширине полосы. Пары отформованных полос соединяются в секции при помощи сварки. Секции каркаса объемного армирующего соединяются после укладки на почву горной выработки между собой шпильками с шайбами и гайками с размерами резьбы M16-М24 через перфорационные и монтажные отверстия. Секции каркаса объемного армирующего заполняются на всю высоту каркаса горной породой, образовавшейся при проведении горной выработки проходческим комбайном. Сверху каркаса насыпается защитный слой толщиной не менее 50 мм из горной породы, образовавшейся при проведении горной выработки. Согласно второму варианту способа вслед за продвижением проходческого забоя на почву горной выработки укладывают геомембрану, на геомембрану укладывают каркас объемный армирующий, изготовленный из объемной георешетки, представляющей собой трехмерную конструкцию в виде секции, состоящей из ячеек одинаковой геометрической формы и одинаковых размеров, изготовляемую из полимерных полос, выполненных из синтетических или природных полимеров одинаковой ширины и толщины и длиной много больше ширины полосы. 2 н. и 4 з.п. ф-лы, 12 ил.
METHOD FOR CONSTRUCTION OF FOUNDATION ON SOIL OF MINE OPENING IN COAL AND SHALE MINE
FIELD: mining.SUBSTANCE: present invention relates to the mining industry, to the construction of a foundation on the soil of mine opening in a coal and shale mine. According to the first variant of the method, in the case of a horizontal or inclined coal or mixed face mine opening, with an angle of inclination of up to 13 degrees, following the advance of the cutoff face, a geomembrane is arranged on the soil of the mine opening, on top of the geomembrane, sections of three-dimensional reinforcing framework are laid, it is made from metal molded strips with holes for perforation and mounting holes with a width of 50 to 300 mm from cold-rolled steel with a thickness of 1.5 mm. Two strips are bonded by welding to obtain three-dimensional cells with equal dimensions in length and width from 250 to 400 mm and a height equal to the width of the strip. Pairs of molded strips are joined into sections by welding. Said sections of the three-dimensional reinforcing frame are connected with each other after they have been laid on the soil of the mine opening by studs with washers and nuts with M16-M24 thread sizes through perforating and mounting holes. Said sections of the three-dimensional reinforcing framework are filled to the entire height of the framework with rock formed during the mining operations using a tunneling machine. On the top of the framework, a protective layer of at least 50 mm thick is poured consisting from rock formed during the mining operations. According to the second variant of the method, following the advance of the cutoff face, a geomembrane is laid on the soil of the mining opening, and a three-dimensional reinforcing frame is laid on the geomembrane, said frame is made from a three-dimensional geogrid, which is a three-dimensional structure in the form of a section consisting of cells of the same geometric shape and the same dimensions, made of polymer strips, which are made of synthetic or natural polymers of the same width and thickness and a length much longer than the width of the strip.EFFECT: methods for constructing a foundation on the soil of a coal and shale mine opening are proposed.6 cl, 12 dwg
Настоящее изобретение относится к горной промышленности, к строительству основания на почве горной выработки в угольной и сланцевой шахте. Согласно первому варианту способа при проведении горизонтальной или наклонной, с углом наклона до 13 градусов, горной выработки по углю или по смешанному забою вслед за продвижением проходческого забоя на почву горной выработки укладывают геомембрану, на геомембрану укладывают секции каркаса объемного армирующего, выполненного из металлических формованных полос с отверстиями для перфорации и монтажными отверстиями шириной от 50 до 300 мм из холоднокатаной стали толщиной от 1,5 мм. Соединяют две полосы с помощью сварки для получения объемных ячеек с равными размерами по длине и ширине от 250 до 400 мм и высотой, равной ширине полосы. Пары отформованных полос соединяются в секции при помощи сварки. Секции каркаса объемного армирующего соединяются после укладки на почву горной выработки между собой шпильками с шайбами и гайками с размерами резьбы M16-М24 через перфорационные и монтажные отверстия. Секции каркаса объемного армирующего заполняются на всю высоту каркаса горной породой, образовавшейся при проведении горной выработки проходческим комбайном. Сверху каркаса насыпается защитный слой толщиной не менее 50 мм из горной породы, образовавшейся при проведении горной выработки. Согласно второму варианту способа вслед за продвижением проходческого забоя на почву горной выработки укладывают геомембрану, на геомембрану укладывают каркас объемный армирующий, изготовленный из объемной георешетки, представляющей собой трехмерную конструкцию в виде секции, состоящей из ячеек одинаковой геометрической формы и одинаковых размеров, изготовляемую из полимерных полос, выполненных из синтетических или природных полимеров одинаковой ширины и толщины и длиной много больше ширины полосы. 2 н. и 4 з.п. ф-лы, 12 ил.
METHOD FOR CONSTRUCTION OF FOUNDATION ON SOIL OF MINE OPENING IN COAL AND SHALE MINE
Способ строительства основания на почве горной выработки в угольной и сланцевой шахте