A platform for research: civil engineering, architecture and urbanism
METHOD OF DRILLING REINFORCED CONCRETE COLUMN ERECTION
FIELD: construction.SUBSTANCE: invention relates to the construction, in particular to the manufacturing technology of drilling reinforced concrete columns, and can be used to create pile foundations for underground and above ground multi-level buildings and structures for various purposes, including those erected in a semi-enclosed way in cramped conditions. Method of construction of the drill concrete column includes the formation of a well using a casing, the manufacture of the reinforcement cage of the column, the placement of the reinforcement cage of the column in the pipe. Casing pipe inclinometry is performed after drilling a well to the projected depth. Metal centralizers are welded to the pipe with the reinforcement cage of the column, wrapped in two layers of polyethylene, lowered into the casing, through the inner part of the reinforcement cage of the column, the concrete line is lowered and the concrete mix is placed with the accelerator setting to a height sufficient to fix the lower part of the reinforced concrete column. Raise the concrete pipe to a height of not more than the height of the concrete mix with the accelerator setting and stack the concrete mix with a retarder while raising the concrete pipe, embedded in the stackable mixture. Laid concrete mixture is kept up to a set of concrete mixture with an accelerator setting at the base of the column of minimum strength. Check the fixation of the reinforcement cage of the column and continue concreting to the design elevations while simultaneously removing the casing from the well and filling the annular space with a cement-sand mortar.EFFECT: technical result consists in simplifying the method for erecting a drill concrete column and increasing productivity due to the absence of the need to center the reinforcement cage after lowering it in the casing.1 cl, 2 dwg
Изобретение относится к строительству, в частности к технологии изготовления буровых железобетонных колонн, и может быть использовано для создания свайных оснований для подземных и наземных многоуровневых зданий и сооружений различного назначения, в том числе возводимых полузакрытым способом в стесненных условиях. Способ возведения буровой железобетонной колонны включает образование скважины с использованием обсадной трубы, изготовление арматурного каркаса колонны, помещение арматурного каркаса колонны в трубу. После бурения скважины до проектной глубины производят инклинометрию обсадной трубы. К трубе с арматурным каркасом колонны приваривают металлические центраторы, оборачивают ее двумя слоями полиэтилена, опускают в обсадную трубу, через внутреннюю часть арматурного каркаса колонны опускают бетоновод и укладывают бетонную смесь с ускорителем схватывания на высоту, достаточную для фиксации нижней части буровой железобетонной колонны. Поднимают бетоновод на высоту не более высоты укладки бетонной смеси с ускорителем схватывания и укладывают бетонную смесь с замедлителем схватывания с одновременным поднятием бетоновода, заглубленного в укладываемую смесь. Уложенную бетонную смесь выдерживают до набора бетонной смесью с ускорителем схватывания в основании колонны минимальной прочности. Проверяют фиксацию арматурного каркаса колонны и продолжают бетонирование до проектных отметок с одновременным извлечением из скважины обсадной трубы и заполнением межтрубного пространства цементно-песчаным раствором. Технический результат состоит в упрощении способа возведения буровой железобетонной колонны и повышении производительности за счет отсутствия необходимости центрирования арматурного каркаса после опускания в обсадную трубу. 2 ил.
METHOD OF DRILLING REINFORCED CONCRETE COLUMN ERECTION
FIELD: construction.SUBSTANCE: invention relates to the construction, in particular to the manufacturing technology of drilling reinforced concrete columns, and can be used to create pile foundations for underground and above ground multi-level buildings and structures for various purposes, including those erected in a semi-enclosed way in cramped conditions. Method of construction of the drill concrete column includes the formation of a well using a casing, the manufacture of the reinforcement cage of the column, the placement of the reinforcement cage of the column in the pipe. Casing pipe inclinometry is performed after drilling a well to the projected depth. Metal centralizers are welded to the pipe with the reinforcement cage of the column, wrapped in two layers of polyethylene, lowered into the casing, through the inner part of the reinforcement cage of the column, the concrete line is lowered and the concrete mix is placed with the accelerator setting to a height sufficient to fix the lower part of the reinforced concrete column. Raise the concrete pipe to a height of not more than the height of the concrete mix with the accelerator setting and stack the concrete mix with a retarder while raising the concrete pipe, embedded in the stackable mixture. Laid concrete mixture is kept up to a set of concrete mixture with an accelerator setting at the base of the column of minimum strength. Check the fixation of the reinforcement cage of the column and continue concreting to the design elevations while simultaneously removing the casing from the well and filling the annular space with a cement-sand mortar.EFFECT: technical result consists in simplifying the method for erecting a drill concrete column and increasing productivity due to the absence of the need to center the reinforcement cage after lowering it in the casing.1 cl, 2 dwg
Изобретение относится к строительству, в частности к технологии изготовления буровых железобетонных колонн, и может быть использовано для создания свайных оснований для подземных и наземных многоуровневых зданий и сооружений различного назначения, в том числе возводимых полузакрытым способом в стесненных условиях. Способ возведения буровой железобетонной колонны включает образование скважины с использованием обсадной трубы, изготовление арматурного каркаса колонны, помещение арматурного каркаса колонны в трубу. После бурения скважины до проектной глубины производят инклинометрию обсадной трубы. К трубе с арматурным каркасом колонны приваривают металлические центраторы, оборачивают ее двумя слоями полиэтилена, опускают в обсадную трубу, через внутреннюю часть арматурного каркаса колонны опускают бетоновод и укладывают бетонную смесь с ускорителем схватывания на высоту, достаточную для фиксации нижней части буровой железобетонной колонны. Поднимают бетоновод на высоту не более высоты укладки бетонной смеси с ускорителем схватывания и укладывают бетонную смесь с замедлителем схватывания с одновременным поднятием бетоновода, заглубленного в укладываемую смесь. Уложенную бетонную смесь выдерживают до набора бетонной смесью с ускорителем схватывания в основании колонны минимальной прочности. Проверяют фиксацию арматурного каркаса колонны и продолжают бетонирование до проектных отметок с одновременным извлечением из скважины обсадной трубы и заполнением межтрубного пространства цементно-песчаным раствором. Технический результат состоит в упрощении способа возведения буровой железобетонной колонны и повышении производительности за счет отсутствия необходимости центрирования арматурного каркаса после опускания в обсадную трубу. 2 ил.
METHOD OF DRILLING REINFORCED CONCRETE COLUMN ERECTION
Способ возведения буровой железобетонной колонны
ILIN IGOR VALEREVICH (author) / MARKOV VLADIMIR ANDREEVICH (author) / KLOCHANOV VITALIJ MIKHAJLOVICH (author)
2018-12-11
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION
European Patent Office | 2018
|METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION
European Patent Office | 2019
|European Patent Office | 2019
|REINFORCED CONCRETE WALL ERECTION METHOD BY 3D PRINTING METHOD
European Patent Office | 2020
|