TUNNEL CONSTRUCTION METHOD AND SEGMENTS FOR THIS TUNNEL CONSTRUCTION
FIELD: construction.SUBSTANCE: claimed group of inventions relates to construction, namely, to construction of tunnels. Tunnel construction method includes: preparation for forcing, which includes creation of starting pit, width of which is not less than the width of the tunnel, successive forcing of long elements connected to each other by guide locks, and excavation of soil in the volume of the erected tunnel. Extended elements are made in the form of non-smooth segments. In preparation for forcing, controlled puncture of soil is made, guide puncture pipe is left in soil. First segment of first row is laid on device, by means of which segments are extruded, first segment is pushed on guide puncture pipe, first, after the first segment is squeezed, the next segment of the first longitudinal row is also pushed onto the puncture guide tube and forced through to the design depth, the nasal and pressurizing operation is repeated until all segments of the first longitudinal row are not extruded to the design depth, when the last segment of the first longitudinal row is pushed, the design tail part is left for orientation and alignment of the guide locks of the next row of segments, then the following longitudinal rows are started. Said indentation is performed successively in lengthwise direction. Tunnel casing construction is completed after the latter final segment lengthwise. Segments of the tunnel are made in the form of irregular profiles of trapezoidal cross-section. Segments are made in accordance with design shapes and sizes and can be made as frameless or concrete with the use of reinforcement frame, or from polymer concrete, or from fiber concrete. Segments of the first row are made with a through hole along the whole segment, which is made with possibility of puncture on the guide tube. Each first segment of any longitudinal row, except the first one, is made with a skew, which is a clamping wedge. Guide-locks are made in the form of longitudinal recesses and corresponding in form of longitudinal projections along the whole length of inclined sides of segment trapezoid. Projection is made with possibility of entering into recess. Guide-locks are made on one of inclined sides of trapezium in form of longitudinal recesses along entire length of segment, and on the opposite side – in the form of a longitudinal protrusion along the entire length of the segment, or are made on each inclined side of the trapezium in form of a longitudinal protrusion and longitudinal recess along the entire length of the segment, or are made on the upper part of the trapezoidal inclined side in the form of a protrusion or recess, or are made on the lower part of the trapezoidal inclined side in the form of a protrusion or embankment, or are made in the center of the trapezoidal inclined side in the form of a protrusion or recess.EFFECT: reduced labor intensiveness of tunnel construction method, reduced time of construction, and also simplified design of tunnel.15 cl, 7 dwg
Заявляемая группа изобретений относится к строительству, а именно к сооружению тоннелей. Техническим результатом является снижение трудоемкости способа сооружения тоннеля, сокращение сроков строительства, а также упрощение конструкции тоннеля. Способ сооружения тоннеля включает: подготовку к продавливанию, которая включает в себя создание стартового котлована, ширина которого составляет не менее ширины тоннеля, поочередное продавливание протяженных элементов, соединяемых между собой замками-направляющими, и выемку грунта в объеме возводимого тоннеля. Протяженные элементы выполнены в виде неполых сегментов. При подготовке к продавливанию совершают управляемый прокол грунта, направляющую трубу прокола оставляют в грунте. Первый сегмент первого ряда укладывают на устройство, с помощью которого продавливают сегменты, первый сегмент насаживают на направляющую трубу прокола, начинают продавливание, после продавливания первого сегмента следующий сегмент первого продольного ряда также насаживают на направляющую трубу прокола и продавливают его на проектную глубину, операцию по насаживанию и продавливанию повторяют до тех пор, пока все сегменты первого продольного ряда не будут продавлены на проектную глубину, при продавливании последнего сегмента первого продольного ряда оставляют расчетную хвостовую часть для ориентации и совмещения направляющих-замков следующего ряда сегментов, далее начинают продавливание следующих продольных рядов. Продавливание осуществляют последовательно друг за другом в продольном направлении, сооружение оболочки тоннеля заканчивают после продавливания последнего завершающего продольного ряда сегментов. Сегменты тоннеля выполнены в виде неполых профилей трапециевидной в сечении формы. Сегменты изготовлены в соответствии с расчетными формами и размерами и могут быть выполнены бетонными бескаркасными, либо бетонными с использованием арматурного каркаса, либо из полимербетона, либо из фибробетона. Сегменты первого ряда выполнены со сквозным отверстием вдоль всего сегмента, которое выполнено с возможностью насаживания на направляющую трубу прокола. Каждый первый сегмент любого продольного ряда, кроме первого, выполнен со скосом, который является клином прижимания. Направляющие-замки выполнены в виде продольных заглублений и соответствующих им по форме продольных выступов по всей длине наклонных сторон трапеции сегмента. Выступ выполнен с обеспечением возможности вхождения в заглубление. Направляющие-замки выполнены на одной из наклонных сторон трапеции в виде продольных заглублений по всей длине сегмента, а на противоположной - в виде продольного выступа по всей длине сегмента, либо выполнены на каждой наклонной стороне трапеции в виде продольного выступа и продольного заглубления по всей длине сегмента, либо выполнены на верхней части наклонной стороны трапеции в виде выступа либо заглубления, либо выполнены на нижней части наклонной стороны трапеции в виде выступа или заглубления, либо выполнены по центру наклонной стороны трапеции в виде выступа либо заглубления. 2 н. и 13 з.п. ф-лы, 7 ил.
TUNNEL CONSTRUCTION METHOD AND SEGMENTS FOR THIS TUNNEL CONSTRUCTION
FIELD: construction.SUBSTANCE: claimed group of inventions relates to construction, namely, to construction of tunnels. Tunnel construction method includes: preparation for forcing, which includes creation of starting pit, width of which is not less than the width of the tunnel, successive forcing of long elements connected to each other by guide locks, and excavation of soil in the volume of the erected tunnel. Extended elements are made in the form of non-smooth segments. In preparation for forcing, controlled puncture of soil is made, guide puncture pipe is left in soil. First segment of first row is laid on device, by means of which segments are extruded, first segment is pushed on guide puncture pipe, first, after the first segment is squeezed, the next segment of the first longitudinal row is also pushed onto the puncture guide tube and forced through to the design depth, the nasal and pressurizing operation is repeated until all segments of the first longitudinal row are not extruded to the design depth, when the last segment of the first longitudinal row is pushed, the design tail part is left for orientation and alignment of the guide locks of the next row of segments, then the following longitudinal rows are started. Said indentation is performed successively in lengthwise direction. Tunnel casing construction is completed after the latter final segment lengthwise. Segments of the tunnel are made in the form of irregular profiles of trapezoidal cross-section. Segments are made in accordance with design shapes and sizes and can be made as frameless or concrete with the use of reinforcement frame, or from polymer concrete, or from fiber concrete. Segments of the first row are made with a through hole along the whole segment, which is made with possibility of puncture on the guide tube. Each first segment of any longitudinal row, except the first one, is made with a skew, which is a clamping wedge. Guide-locks are made in the form of longitudinal recesses and corresponding in form of longitudinal projections along the whole length of inclined sides of segment trapezoid. Projection is made with possibility of entering into recess. Guide-locks are made on one of inclined sides of trapezium in form of longitudinal recesses along entire length of segment, and on the opposite side – in the form of a longitudinal protrusion along the entire length of the segment, or are made on each inclined side of the trapezium in form of a longitudinal protrusion and longitudinal recess along the entire length of the segment, or are made on the upper part of the trapezoidal inclined side in the form of a protrusion or recess, or are made on the lower part of the trapezoidal inclined side in the form of a protrusion or embankment, or are made in the center of the trapezoidal inclined side in the form of a protrusion or recess.EFFECT: reduced labor intensiveness of tunnel construction method, reduced time of construction, and also simplified design of tunnel.15 cl, 7 dwg
Заявляемая группа изобретений относится к строительству, а именно к сооружению тоннелей. Техническим результатом является снижение трудоемкости способа сооружения тоннеля, сокращение сроков строительства, а также упрощение конструкции тоннеля. Способ сооружения тоннеля включает: подготовку к продавливанию, которая включает в себя создание стартового котлована, ширина которого составляет не менее ширины тоннеля, поочередное продавливание протяженных элементов, соединяемых между собой замками-направляющими, и выемку грунта в объеме возводимого тоннеля. Протяженные элементы выполнены в виде неполых сегментов. При подготовке к продавливанию совершают управляемый прокол грунта, направляющую трубу прокола оставляют в грунте. Первый сегмент первого ряда укладывают на устройство, с помощью которого продавливают сегменты, первый сегмент насаживают на направляющую трубу прокола, начинают продавливание, после продавливания первого сегмента следующий сегмент первого продольного ряда также насаживают на направляющую трубу прокола и продавливают его на проектную глубину, операцию по насаживанию и продавливанию повторяют до тех пор, пока все сегменты первого продольного ряда не будут продавлены на проектную глубину, при продавливании последнего сегмента первого продольного ряда оставляют расчетную хвостовую часть для ориентации и совмещения направляющих-замков следующего ряда сегментов, далее начинают продавливание следующих продольных рядов. Продавливание осуществляют последовательно друг за другом в продольном направлении, сооружение оболочки тоннеля заканчивают после продавливания последнего завершающего продольного ряда сегментов. Сегменты тоннеля выполнены в виде неполых профилей трапециевидной в сечении формы. Сегменты изготовлены в соответствии с расчетными формами и размерами и могут быть выполнены бетонными бескаркасными, либо бетонными с использованием арматурного каркаса, либо из полимербетона, либо из фибробетона. Сегменты первого ряда выполнены со сквозным отверстием вдоль всего сегмента, которое выполнено с возможностью насаживания на направляющую трубу прокола. Каждый первый сегмент любого продольного ряда, кроме первого, выполнен со скосом, который является клином прижимания. Направляющие-замки выполнены в виде продольных заглублений и соответствующих им по форме продольных выступов по всей длине наклонных сторон трапеции сегмента. Выступ выполнен с обеспечением возможности вхождения в заглубление. Направляющие-замки выполнены на одной из наклонных сторон трапеции в виде продольных заглублений по всей длине сегмента, а на противоположной - в виде продольного выступа по всей длине сегмента, либо выполнены на каждой наклонной стороне трапеции в виде продольного выступа и продольного заглубления по всей длине сегмента, либо выполнены на верхней части наклонной стороны трапеции в виде выступа либо заглубления, либо выполнены на нижней части наклонной стороны трапеции в виде выступа или заглубления, либо выполнены по центру наклонной стороны трапеции в виде выступа либо заглубления. 2 н. и 13 з.п. ф-лы, 7 ил.
TUNNEL CONSTRUCTION METHOD AND SEGMENTS FOR THIS TUNNEL CONSTRUCTION
СПОСОБ СООРУЖЕНИЯ ТОННЕЛЯ И СЕГМЕНТЫ ДЛЯ СООРУЖЕНИЯ ЭТОГО ТОННЕЛЯ
DUDKO ARTEM VLADIMIROVICH (author)
2020-04-06
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
UNDERSEA TUNNEL CONSTRUCTION METHOD AND LAND TUNNEL CONSTRUCTION METHOD
European Patent Office | 2016
|Analysis on Damage Cause of Shield Tunnel Segments during Construction
Trans Tech Publications | 2012
|Analysis on Damage Cause of Shield Tunnel Segments during Construction
British Library Conference Proceedings | 2012