A platform for research: civil engineering, architecture and urbanism
ERECTED PLATFORM AND METHOD OF ERECTING THEREOF
An erected platform which contains parallel lines of trusses connected end-to-end and method of erecting thereof, as illustrated in FIGS. 20 to 23. Each truss has two sides for chords respectively, with apertures or eyelets at the ends. First and second other trusses for a pair of parallel lines respectively are connected by positioning a first other truss adjacent the decking laid on an existing platform portion. Apertures on first respective sides of the first other truss and one of the existing trusses are connected by a first pin and the first other truss swung into an end-to-end position with the one existing truss and a second pin inserted in apertures on second respective sides of the first other truss and the one existing truss. The first pin is removed and the first other truss swung out of the way so that the second other truss may be attached. The second other truss is positioned adjacent the existing decking and similarly connected end-to-end with the other existing truss. The first other truss is then swung back into position for end-to-end attachment to the one existing truss and the second pin re-inserted.
ERECTED PLATFORM AND METHOD OF ERECTING THEREOF
An erected platform which contains parallel lines of trusses connected end-to-end and method of erecting thereof, as illustrated in FIGS. 20 to 23. Each truss has two sides for chords respectively, with apertures or eyelets at the ends. First and second other trusses for a pair of parallel lines respectively are connected by positioning a first other truss adjacent the decking laid on an existing platform portion. Apertures on first respective sides of the first other truss and one of the existing trusses are connected by a first pin and the first other truss swung into an end-to-end position with the one existing truss and a second pin inserted in apertures on second respective sides of the first other truss and the one existing truss. The first pin is removed and the first other truss swung out of the way so that the second other truss may be attached. The second other truss is positioned adjacent the existing decking and similarly connected end-to-end with the other existing truss. The first other truss is then swung back into position for end-to-end attachment to the one existing truss and the second pin re-inserted.
ERECTED PLATFORM AND METHOD OF ERECTING THEREOF
APOSTOLOPOULOS LAMBROS (author) / PASSUCCI DAVY E (author) / BORTZ BRIAN (author)
2020-07-16
Patent
Electronic Resource
English
HYBRID METHOD OF ERECTING A COLD BOX USING PREFABRICATED AND FIELD ERECTED COMPONENTS
European Patent Office | 2017
HYBRID METHOD OF ERECTING A COLD BOX USING PREFABRICATED AND FIELD ERECTED COMPONENTS
European Patent Office | 2017
|