A platform for research: civil engineering, architecture and urbanism
SHEET PILE CONSTRUCTION METHOD, SHEET PILE CONSTRUCTION DEVICE, AND HOLDING TOOL
Provided are: a sheet pile construction method and a sheet pile construction device which can reduce the occurrence of noise and vibration as much as possible, do not require water, and can reliably construct a sheet pile even in hard ground; and a holding tool. In this sheet pile construction device, a columnar leader 2 is supported in an approximately vertical direction by a vehicle 1 provided with a moving means 12, and an auger body 31 of an earth auger 3 is supported in a vertically movable manner by the leader 2. A supporting body 4 is installed in the auger body 31 so as to support a hydraulic chuck 6 for fixedly attaching one end section of a steel sheet pile SP at a position adjacent to a screw 32, and a holding tool 7 for holding one side edge of the steel sheet pile SP fixedly attached to the hydraulic chuck 6 is loosely fixed in the vicinity of a distal end of the screw 32. Also, in the sheet pile construction device, the ground is drilled by the screw 32 to a required depth to form an empty hole H, and the steel sheet pile H fixedly attached to the hydraulic chuck 6 is inserted into a previously-formed empty hole H which has been formed adjacent to said empty hole H.
L'invention concerne : un procédé de construction de palplanche et un dispositif de construction de palplanche qui permettent de réduire l'apparition de bruits et de vibrations autant que possible, ne nécessitent pas d'eau et permettant de construire de manière fiable une palplanche même dans un sol dur ; et un outil de maintien. Dans ce dispositif de construction de palplanche, un guide colonnaire (2) est soutenu dans une direction plus ou moins verticale par un véhicule (1) doté d'un moyen de déplacement (12) et un corps de tarière (31) d'une tarière (3) est soutenu de manière verticalement mobile par le guide (2). Un corps de support (4) est installé dans le corps de tarière (31) de manière à soutenir un mandrin hydraulique (6) pour fixer de manière fixe une section d'extrémité d'une palplanche d'acier (SP) au niveau d'une position adjacente à une vis (32), et un outil de maintien (7) permettant de maintenir un bord latéral de la palplanche d'acier (SP) fixé de manière fixe au mandrin hydraulique (6) est fixé de manière lâche au voisinage d'une extrémité distale de la vis (32). De plus, dans le dispositif de construction de palplanche, le sol est percé par la vis (32) jusqu'à une profondeur requise pour former un trou vide (H), et la palplanche d'acier (H) fixée de manière fixe au mandrin hydraulique (6) est insérée dans un trou vide (H) précédemment formé qui a été formé adjacent audit trou vide (H).
騒音及び振動の発生は可及的に低減し得、また水が不要であり、更に、硬い地盤であっても確実に矢板を施工することができる矢板施工方法及び矢板施工装置並びに保持具を提供する。 本矢板施工装置にあっては、移動手段12を設けてなる車両1によって柱状のリーダ2が略鉛直方向に支持されており、アースオーガ3のオーガ本体31がリーダ2に昇降可能に支持されている。オーガ本体31には、鋼矢板SPの一端部を固着させる油圧チャック6をスクリュー32の相隣る位置に支持する支持体4が垂設してあり、一方、スクリュー32の先端近傍には、油圧チャック6に固着された鋼矢板SPの一側縁を保持する保持具7が遊嵌してある。そして、矢板施工装置は、スクリュー32にて地盤を所要深さまで掘削して空穴Hを形成するのと並行して、当該空穴Hに隣接して形成された前の空穴H内に、油圧チャック6に固着された鋼矢板Hを挿入させるようになっている。
SHEET PILE CONSTRUCTION METHOD, SHEET PILE CONSTRUCTION DEVICE, AND HOLDING TOOL
Provided are: a sheet pile construction method and a sheet pile construction device which can reduce the occurrence of noise and vibration as much as possible, do not require water, and can reliably construct a sheet pile even in hard ground; and a holding tool. In this sheet pile construction device, a columnar leader 2 is supported in an approximately vertical direction by a vehicle 1 provided with a moving means 12, and an auger body 31 of an earth auger 3 is supported in a vertically movable manner by the leader 2. A supporting body 4 is installed in the auger body 31 so as to support a hydraulic chuck 6 for fixedly attaching one end section of a steel sheet pile SP at a position adjacent to a screw 32, and a holding tool 7 for holding one side edge of the steel sheet pile SP fixedly attached to the hydraulic chuck 6 is loosely fixed in the vicinity of a distal end of the screw 32. Also, in the sheet pile construction device, the ground is drilled by the screw 32 to a required depth to form an empty hole H, and the steel sheet pile H fixedly attached to the hydraulic chuck 6 is inserted into a previously-formed empty hole H which has been formed adjacent to said empty hole H.
L'invention concerne : un procédé de construction de palplanche et un dispositif de construction de palplanche qui permettent de réduire l'apparition de bruits et de vibrations autant que possible, ne nécessitent pas d'eau et permettant de construire de manière fiable une palplanche même dans un sol dur ; et un outil de maintien. Dans ce dispositif de construction de palplanche, un guide colonnaire (2) est soutenu dans une direction plus ou moins verticale par un véhicule (1) doté d'un moyen de déplacement (12) et un corps de tarière (31) d'une tarière (3) est soutenu de manière verticalement mobile par le guide (2). Un corps de support (4) est installé dans le corps de tarière (31) de manière à soutenir un mandrin hydraulique (6) pour fixer de manière fixe une section d'extrémité d'une palplanche d'acier (SP) au niveau d'une position adjacente à une vis (32), et un outil de maintien (7) permettant de maintenir un bord latéral de la palplanche d'acier (SP) fixé de manière fixe au mandrin hydraulique (6) est fixé de manière lâche au voisinage d'une extrémité distale de la vis (32). De plus, dans le dispositif de construction de palplanche, le sol est percé par la vis (32) jusqu'à une profondeur requise pour former un trou vide (H), et la palplanche d'acier (H) fixée de manière fixe au mandrin hydraulique (6) est insérée dans un trou vide (H) précédemment formé qui a été formé adjacent audit trou vide (H).
騒音及び振動の発生は可及的に低減し得、また水が不要であり、更に、硬い地盤であっても確実に矢板を施工することができる矢板施工方法及び矢板施工装置並びに保持具を提供する。 本矢板施工装置にあっては、移動手段12を設けてなる車両1によって柱状のリーダ2が略鉛直方向に支持されており、アースオーガ3のオーガ本体31がリーダ2に昇降可能に支持されている。オーガ本体31には、鋼矢板SPの一端部を固着させる油圧チャック6をスクリュー32の相隣る位置に支持する支持体4が垂設してあり、一方、スクリュー32の先端近傍には、油圧チャック6に固着された鋼矢板SPの一側縁を保持する保持具7が遊嵌してある。そして、矢板施工装置は、スクリュー32にて地盤を所要深さまで掘削して空穴Hを形成するのと並行して、当該空穴Hに隣接して形成された前の空穴H内に、油圧チャック6に固着された鋼矢板Hを挿入させるようになっている。
SHEET PILE CONSTRUCTION METHOD, SHEET PILE CONSTRUCTION DEVICE, AND HOLDING TOOL
PROCÉDÉ DE CONSTRUCTION DE PALPLANCHE, DISPOSITIF DE CONSTRUCTION DE PALPLANCHE ET OUTIL DE MAINTIEN
矢板施工方法及び矢板施工装置並びに保持具
MURAKAMI MITUO (author)
2019-10-03
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|STEEL SHEET PILE, AND CONSTRUCTION METHOD OF STEEL SHEET PILE
European Patent Office | 2022
|