ROTARY PILE CONSTRUCTION METHOD, PILE GROUP MANUFACTURING METHOD, AND PILE GROUP
Provided are a rotary pile construction method which can prevent sediment from clogging a rotary pile, when the rotary pile is rotatingly pressed into the ground, and a rotary pile. A construction method in which a rotary pile 17 provided with a blade 16 is penetrated into the ground 91 is characterized by including: a measurement step for measuring an vertical load in the rotary pile 17, while the rotary pile 17 is rotatingly pressed into the ground 91; and a determination step for determining whether to clear the clogging of sediment accumulated in the rotary pile 17 on the basis of the measurement result obtained from the measurement step. In addition, the measurement step is characterized by including measuring at least any one among the rotational torque and a penetration amount of the rotary pile 17.
L'invention concerne un procédé de construction de pieu rotatif permettant d'empêcher un sédiment de boucher un pieu rotatif, lorsque le pieu rotatif est enfoncé par rotation dans le sol, et un pieu rotatif. L'invention concerne un procédé de construction selon lequel un pieu rotatif 17 muni d'une lame 16 est enfoncé dans le sol 91, caractérisé en ce qu'il comprend : une étape de mesure consistant à mesurer une charge verticale dans le pieu rotatif 17, lorsque le pieu rotatif 17 est enfoncé par rotation dans le sol 91 ; et une étape de détermination consistant à déterminer s'il faut éliminer le colmatage des sédiments accumulés dans le pieu rotatif 17 sur la base du résultat de mesure obtenu à partir de l'étape de mesure. L'étape de mesure consiste également à mesurer au moins l'un quelconque parmi le couple de rotation et la valeur de pénétration du pieu rotatif 17.
回転杭を地盤に回転圧入する際に、回転杭の中に土砂が詰まることを防ぐことができる回転杭の施工方法、及び回転杭を提供する。 羽根16を設けた回転杭17を、地盤91に貫入する施工方法であって、前記地盤91に対して前記回転杭17を回転圧入中に、前記回転杭17における上載荷重を計測する計測工程と、前記計測工程で得られた前記計測結果に基づき、前記回転杭17の中に堆積された土砂の詰まりを取るか否かを判断する判断工程と、を備えることを特徴とする。また、例えば前記計測工程は、前記回転杭17の回転トルクおよび貫入量の少なくとも何れかを計測することを含むことを特徴とする。
ROTARY PILE CONSTRUCTION METHOD, PILE GROUP MANUFACTURING METHOD, AND PILE GROUP
Provided are a rotary pile construction method which can prevent sediment from clogging a rotary pile, when the rotary pile is rotatingly pressed into the ground, and a rotary pile. A construction method in which a rotary pile 17 provided with a blade 16 is penetrated into the ground 91 is characterized by including: a measurement step for measuring an vertical load in the rotary pile 17, while the rotary pile 17 is rotatingly pressed into the ground 91; and a determination step for determining whether to clear the clogging of sediment accumulated in the rotary pile 17 on the basis of the measurement result obtained from the measurement step. In addition, the measurement step is characterized by including measuring at least any one among the rotational torque and a penetration amount of the rotary pile 17.
L'invention concerne un procédé de construction de pieu rotatif permettant d'empêcher un sédiment de boucher un pieu rotatif, lorsque le pieu rotatif est enfoncé par rotation dans le sol, et un pieu rotatif. L'invention concerne un procédé de construction selon lequel un pieu rotatif 17 muni d'une lame 16 est enfoncé dans le sol 91, caractérisé en ce qu'il comprend : une étape de mesure consistant à mesurer une charge verticale dans le pieu rotatif 17, lorsque le pieu rotatif 17 est enfoncé par rotation dans le sol 91 ; et une étape de détermination consistant à déterminer s'il faut éliminer le colmatage des sédiments accumulés dans le pieu rotatif 17 sur la base du résultat de mesure obtenu à partir de l'étape de mesure. L'étape de mesure consiste également à mesurer au moins l'un quelconque parmi le couple de rotation et la valeur de pénétration du pieu rotatif 17.
回転杭を地盤に回転圧入する際に、回転杭の中に土砂が詰まることを防ぐことができる回転杭の施工方法、及び回転杭を提供する。 羽根16を設けた回転杭17を、地盤91に貫入する施工方法であって、前記地盤91に対して前記回転杭17を回転圧入中に、前記回転杭17における上載荷重を計測する計測工程と、前記計測工程で得られた前記計測結果に基づき、前記回転杭17の中に堆積された土砂の詰まりを取るか否かを判断する判断工程と、を備えることを特徴とする。また、例えば前記計測工程は、前記回転杭17の回転トルクおよび貫入量の少なくとも何れかを計測することを含むことを特徴とする。
ROTARY PILE CONSTRUCTION METHOD, PILE GROUP MANUFACTURING METHOD, AND PILE GROUP
PROCÉDÉ DE CONSTRUCTION DE PIEU ROTATIF, PROCÉDÉ DE FABRICATION DE GROUPE DE PIEUX ET GROUPE DE PIEUX
回転杭の施工方法、杭群の製造方法、及び杭群
SAWAISHI MASAMICHI (author) / OKI HITOSHI (author) / FUKUMURA KOKA (author) / SHOJI TOMOYUKI (author)
2020-10-29
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|ROTARY PILE, CONSTRUCTION TOOL FOR ROTARY PILE, AND CONSTRUCTION METHOD OF ROTARY PILE
European Patent Office | 2020
|Miniature pile, pile group structure and construction method thereof
European Patent Office | 2023
|