OPEN CAISSON REVERSE SLIP FORMING GUIDE CONTROLLABLE SETTLEMENT CONSTRUCTION MECHANISM AND CONSTRUCTION METHOD
Provided in the present invention are an open caisson reverse slip forming guide controllable settlement construction mechanism and construction method. Said construction mechanism comprises a ring beam, slip forming beams, an outer mold assembly and an inner mold assembly; the outer mold assembly comprises a first hanger beam and an outer mold plate; the inner mold assembly comprises a second hanger beam and an inner mold plate; the first hanger beam and the second hanger beam are both suspended below the slip forming beams; a well wall forming area is formed between the outer mold plate and the inner mold plate; and the bottom side of the well wall forming area is provided with a well wall blade foot. The construction method comprises: manufacturing a steel pipe pile, pouring a ring beam and installing an open caisson blade foot; installing a slip forming beam and an inner mold assembly and an outer mold assembly; placing reinforcing ribs, foam boards and glass fiber cloth; and forming an open caisson well wall and excavating soil stone in the well. In the open caisson reverse slip forming guide controllable settlement construction mechanism and construction method of the present invention, reverse slip forming is used in which the well wall slides and the molds do not move, greatly increasing the construction speed, reducing the conflict and interference between the manufacture of the well wall and the excavation of earthwork, reducing the construction cost, and effectively ensuring the quality of the open caisson construction.
La présente invention concerne un mécanisme de construction par tassement pouvant être commandé par un guide formant un glissement inverse de caisson ouvert et procédé de construction. Ledit mécanisme de construction comprend une poutre annulaire, des poutres de formation de glissement, un ensemble moule extérieur et un ensemble moule intérieur ; l'ensemble moule extérieur comprend une première poutre de suspension et une plaque de moule extérieure ; l'ensemble moule intérieur comprend une seconde poutre de suspension et une plaque de moule intérieure ; la première poutre de suspension et la seconde poutre de suspension étant toutes les deux suspendues au-dessous des poutres de formation de glissement ; une zone de formation de paroi de puits est formée entre la plaque de moule extérieure et la plaque de moule intérieure ; et le côté inférieur de la zone de formation de paroi de puits est pourvue d'un pied de pale de paroi de puits. Le procédé de construction comprend : la fabrication d'un pieu tubulaire en acier, le coulage d'une poutre annulaire et l'installation d'un pied de pale de caisson ouvert ; l'installation d'une poutre de formation de glissement et d'un ensemble moule intérieur et d'un ensemble moule extérieur ; la mise en place de nervures de renfort, de panneaux en mousse et de tissu en fibre de verre ; et la formation d'une paroi de puits de caisson ouvert et l'excavation de la pierre du sol dans le puits. Dans le mécanisme de construction par tassement pouvant être commandé par un guide formant un glissement inverse de caisson ouvert et un procédé de construction selon la présente invention, une formation de glissement inverse est utilisée dans laquelle les coulisses de paroi de puits et les moules ne se déplacent pas, ce qui permet d'augmenter de manière considérable la vitesse de construction, de réduire le conflit et l'interférence entre la fabrication de la paroi de puits et l'excavation de travaux de terrassement, de réduire le coût de construction et d'assurer de manière efficace la qualité de la construction de caisson ouvert.
本发明提供了一种沉井逆滑模导向可控沉降施工机构及施工方法,包括圈梁、滑模梁、外模组件和内模组件;外模组件包括第一吊架梁和外模板;内模组件包括第二吊架梁和内模板;第一吊架梁和第二吊架梁皆悬吊在滑模梁下方;外模板和内模板之间构成井壁成型区;井壁成型区底侧设置有井壁刃脚。施工方法:制作钢管桩,浇注圈梁,安装沉井刃脚;安装滑模梁、内外模组件;进行加强筋、泡沫板以及玻璃纤维布的铺设;成型沉井井壁以及挖掘井内土石。本发明的一种沉井逆滑模导向可控沉降施工机构及施工方法,采用逆向滑模的方式,井壁滑动、模板不动,可大大提高施工速度,减少井壁制造与挖掘土方的冲突和干涉,降低建筑成本,同时有效保证沉井施工质量。
OPEN CAISSON REVERSE SLIP FORMING GUIDE CONTROLLABLE SETTLEMENT CONSTRUCTION MECHANISM AND CONSTRUCTION METHOD
Provided in the present invention are an open caisson reverse slip forming guide controllable settlement construction mechanism and construction method. Said construction mechanism comprises a ring beam, slip forming beams, an outer mold assembly and an inner mold assembly; the outer mold assembly comprises a first hanger beam and an outer mold plate; the inner mold assembly comprises a second hanger beam and an inner mold plate; the first hanger beam and the second hanger beam are both suspended below the slip forming beams; a well wall forming area is formed between the outer mold plate and the inner mold plate; and the bottom side of the well wall forming area is provided with a well wall blade foot. The construction method comprises: manufacturing a steel pipe pile, pouring a ring beam and installing an open caisson blade foot; installing a slip forming beam and an inner mold assembly and an outer mold assembly; placing reinforcing ribs, foam boards and glass fiber cloth; and forming an open caisson well wall and excavating soil stone in the well. In the open caisson reverse slip forming guide controllable settlement construction mechanism and construction method of the present invention, reverse slip forming is used in which the well wall slides and the molds do not move, greatly increasing the construction speed, reducing the conflict and interference between the manufacture of the well wall and the excavation of earthwork, reducing the construction cost, and effectively ensuring the quality of the open caisson construction.
La présente invention concerne un mécanisme de construction par tassement pouvant être commandé par un guide formant un glissement inverse de caisson ouvert et procédé de construction. Ledit mécanisme de construction comprend une poutre annulaire, des poutres de formation de glissement, un ensemble moule extérieur et un ensemble moule intérieur ; l'ensemble moule extérieur comprend une première poutre de suspension et une plaque de moule extérieure ; l'ensemble moule intérieur comprend une seconde poutre de suspension et une plaque de moule intérieure ; la première poutre de suspension et la seconde poutre de suspension étant toutes les deux suspendues au-dessous des poutres de formation de glissement ; une zone de formation de paroi de puits est formée entre la plaque de moule extérieure et la plaque de moule intérieure ; et le côté inférieur de la zone de formation de paroi de puits est pourvue d'un pied de pale de paroi de puits. Le procédé de construction comprend : la fabrication d'un pieu tubulaire en acier, le coulage d'une poutre annulaire et l'installation d'un pied de pale de caisson ouvert ; l'installation d'une poutre de formation de glissement et d'un ensemble moule intérieur et d'un ensemble moule extérieur ; la mise en place de nervures de renfort, de panneaux en mousse et de tissu en fibre de verre ; et la formation d'une paroi de puits de caisson ouvert et l'excavation de la pierre du sol dans le puits. Dans le mécanisme de construction par tassement pouvant être commandé par un guide formant un glissement inverse de caisson ouvert et un procédé de construction selon la présente invention, une formation de glissement inverse est utilisée dans laquelle les coulisses de paroi de puits et les moules ne se déplacent pas, ce qui permet d'augmenter de manière considérable la vitesse de construction, de réduire le conflit et l'interférence entre la fabrication de la paroi de puits et l'excavation de travaux de terrassement, de réduire le coût de construction et d'assurer de manière efficace la qualité de la construction de caisson ouvert.
本发明提供了一种沉井逆滑模导向可控沉降施工机构及施工方法,包括圈梁、滑模梁、外模组件和内模组件;外模组件包括第一吊架梁和外模板;内模组件包括第二吊架梁和内模板;第一吊架梁和第二吊架梁皆悬吊在滑模梁下方;外模板和内模板之间构成井壁成型区;井壁成型区底侧设置有井壁刃脚。施工方法:制作钢管桩,浇注圈梁,安装沉井刃脚;安装滑模梁、内外模组件;进行加强筋、泡沫板以及玻璃纤维布的铺设;成型沉井井壁以及挖掘井内土石。本发明的一种沉井逆滑模导向可控沉降施工机构及施工方法,采用逆向滑模的方式,井壁滑动、模板不动,可大大提高施工速度,减少井壁制造与挖掘土方的冲突和干涉,降低建筑成本,同时有效保证沉井施工质量。
OPEN CAISSON REVERSE SLIP FORMING GUIDE CONTROLLABLE SETTLEMENT CONSTRUCTION MECHANISM AND CONSTRUCTION METHOD
MÉCANISME DE CONSTRUCTION PAR TASSEMENT POUVANT ÊTRE COMMANDÉ PAR UN GUIDE FORMANT UN GLISSEMENT INVERSE DE CAISSON OUVERT ET PROCÉDÉ DE CONSTRUCTION
一种沉井逆滑模导向可控沉降施工机构及施工方法
ZHANG SHIPU (author) / XIE LINHAO (author) / LIU YU (author) / ZHANG AIJIA (author) / ZHANG SHOUYI (author)
2021-09-30
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|Open caisson construction auxiliary device and open caisson construction method
European Patent Office | 2023
|Open caisson construction method and open caisson structure
European Patent Office | 2020
|Open caisson construction method and open caisson structure
European Patent Office | 2023
|Open caisson structure and open caisson construction method
European Patent Office | 2020
|